Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
25
st
BRUSHED COVERED Biv
CONCRETE SORES
STAGE 2 nee
[Aor mr racy 1 | ]
' }
ROOM aM $ LOO i |
| i
Td ssscrce ie
} PARKING. |
g } tesracen |
TENANCY ! itt
1,737 SGM {ibe Pi |
{ , 4 | |
| —
| 2motor ¢-——
Pee ee Sg
1] nt
46300 4 | | |
= —_ BICYCLE
= PAREN ot
= <— (esPaces) =
RETANING WALL IO —
CIVIL ENGINEERS: 4 p
DETALS
SS = =~
1 vanoscare 10
ene UANerenre
CARPARK ENTRY/EXTT 6 ARCHITECTS OARS
TENANCY SERVICE
ENTRY/EST
TERS SITE AREA (STAGE 1}
STAGE
TOTAL SITE AREA
MASTERS GFA:
RETAIL CENTRE = 6.24050M
GAROEN CENTRE = 995 SQM
TIMBER CENTRE . 857 SQM
RECEIVING . 851 SQM
OFFICE = 3245QM
TOTAL MASTERS GFA = 9277 SQM
TOTAL UNCOVERED USE AREA = 545 SQM
TOTAL MASTERS USE AREA = —-9,8225QM
MASTERS CAR PARKING
DBABLED - 8 SPACES,
ORDINARY = 250 SPACES
TOTAL CARPARKING =
(38.1 Sam)
STAGE2
TENANCY GFA =
DINARY «
TOTAL CARPARKING =
TOTAL CARPARKING *
LEGEND:
SITE COVERAGE:
STAGE | SITE COVERAGE = 0m
STAGE 2 SITE COVERAGE = 22% GROSS FLOOR AREA
OVERALL SITE COVERAGE = 25%
UNCOVERED USE AREA,
LANDSCAPING TO LANDSCAPE oat 5
ARCHITECT'S DRAWINGS BOP ERNN
LANDSCAPE
LANDSCAPE
ARCHITECTS:
DETALS
2.5m wide FOOIrAT
AS PER COUNCE
Se
Pe
‘ “<9,
Fe
‘ =._//
Prionsion
ei
Masters PW
A THIS DRAWING AND DESIGN 15 SUBIECTTO
COPYRIGHT AND MAY NOT BE REPRODUCED
on WITHOUT PRIOR WRITTEN CONSENT OF
LEFFLER SUMES ARCHITECTS
EB IEIEIEIS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.