Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Notice Advice Agency Response (a) The prescribed rate of agricultural lime has been incorporated into all AASS soils that would come into contact with infrastructure and within 0.3 metres of the finished ground surface. Bulked composite validation tests have conducted at a rate of not less than 1 test per 500 m® and a failure rate of less than 5% confirms that the treatment has been successful. (b) AASS and acidic groundwater are absent; or service infrastructure is constructed of appropriate acid resistant materials. 8.7 All Acid Sulfate Soil excavated during trenching must be appropriately managed. The applicant is to provide a concise and site specific Acid Sulfate Soil Management Plan. The assessment manager must be satisfied that management plan is consistent with the eight Management Principles documented in the Queensland Acid Sulfate Soil Technical Manual - Soil Management Guidelines before any operational works are permitted on the site. 8.8 Excavations (e.g. trenching works) must be appropriately designed and staged to minimise dewatering volumes and the time ASS is exposed to oxidation. Where trenches are to be excavated through ASS materials, the applicant and construction manager must abide by the following provisions: (a) Trenches must only be excavated and dewatered in manageable sections such that the works and backfilling can be completed within 5 days. (b) Trenches must be dusted with fine agricultural lime prior to backfilling with non-ASS or properly treated ASS materials. At least 5 kg of fine agricultural lime (98% purity or equivalent) is to be used for every linear metre of open trench. Application rates should be increased in larger trenches or where AASS or groundwater will be encountered. (c) The section of trench being actively dewatered must not exceed 50 metres in length at any given time. (d) Suction depths for dewatering sumps and spears must not exceed 1 metre below the invert depth of the trench. (e) Sheet piling or similar must be used in sandy environments to prevent excessive dewatering requirements and associated decline in local groundwater levels. (f) Wherever practical, trenchless technologies should used when a service is to be installed through acid sulfate soils. 8.9 Groundwater discharges from the site must not result in adverse impacts upon municipal infrastructure (e.g. gutters and stormwater pipes) or the environment. The applicant is to detail where pumped groundwater is to report (i.e. Stormwater) and the location where these discharges will flow into the environment. The applicant must also provide a concise discharge plan detailing: (a) Baseline water quality information for the groundwater to be pumped inclusive of at least pH, EC, and Fe”* and an estimate of the likely volumes to be pumped per day 49 Page 3 of 5: 091217 Department of Natural Resources and Mines
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.