Original source · versioned page text
Sunshine Butterflies PLANNING REPORT v.1.4
Attached to the e-mail Development Application - Sunshine Butterflies - 1 of 2 MCU16/0090.
character of the premises, and
facilitate in ground water infiltration.
Driveway runoff is filtered To be addressed in the Stormwater
prior to leaving the premises. Management Plan; and at operational
works stage.
Sufficient carparking is The 19 uncovered carparks (4 for
provided to accommodate disabled) and 3 covered carparks
the number and type of provided on site will provide
vehicles likely to be adequate carspaces for the staff,
generated by the small 12 seat buses (client transport),
development. visitors and small delivery vehicles.
1 car space per 20sq.m use
area.
Water To be addressed at operational works
Sensitive stage and in the Stormwater
Design Code Management Plan.
Biodiversity Environmental Enhancement The proposal will seek to retain the
Overlay Vegetation. mature trees within the
Code Vegetation which makes a Environmental Enhancement area,
positive contribution to the and reinforce with native vegetation
major road network is as appropriate.
retained.
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.