Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Central Bioretention Basin
Critical Section
CROSS SECTION DETAILS 10% AEP 1% AEP
POINT CH Z n wA wP n x wA wA wP n x wA
1 ‐4.2 100.95 0.060
2 ‐4.2 100.35 0.060 0.00 0.04 0.00 0.00 0.09 0.00
3 ‐3 100.05 0.060 0.23 1.24 0.01 0.29 1.24 0.02
4 3 100.05 0.060 2.06 6.00 0.12 2.36 6.00 0.14
5 6.6 100.95 0.060 0.24 1.42 0.01 0.31 1.62 0.02
wA wP n x wA wA wP n x wA
TOTAL 2.533472 8.69928 0.152008 2.958498 8.950312 0.17751
S
0.005 R n Q R n Q
0.291228 0.060 1.31 0.330547 0.060 1.67
Flow 1.31 1.67
WSL 100.394 100.443
Calculated by Manning's Equation 1.31 1.67
Vel (m/s) 0.52 0.56
Basin Section
101
100.9
100.8
100.7
Height (m AHD)
100.6
100.5
100.4
100.3
100.2
100.1
100
-6 -4 -2 0 2 4 6 8
Width (m)
Existing Sur face 10 % AEP 1% A EP
As indicated in results above velocities are only slightly above 0.5m/s (by 0.02m/s and 0.06m/s
during the major storm). This is within the requirements for the major storm (less than 2m/s) but
only slightly above for the minor storm. However, scour or damage of vegetation is unlikely as the
results do not take into account the backflow effect caused by the outlet pit and weir which will
reduce velocities through the basin. Therefore the design of the basin is appropriate to cater for
inflow velocity.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.