16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                             Action (if
Drainage layer                           Checked               Satisfactory                                                 Initial
                                                                                             unsatisfactory)

Meets the specifications

Meets the required hydraulic
conductivity (4,000 mm/hr)
Delivery supply docket certifies that
the material delivered is the material
tested (delivery docket attached)

Transition layer supply

Meets the specifications

Supplier certification provided
(certification attached)
Delivery supply docket certifies that
the material delivered is the material
tested (delivery docket attached)

Filter media supply

Meets the FAWB’s Guideline
Specifications for Soil Media in
Bioretention Systems (2008)
Meets the required hydraulic
conductivity (100–500 mm/hr, 750
mm/hr maximum)
Frequency of laboratory testing
completed in accordance with
Section 3.5 (results of testing
attached)
Supplier certification provided
(certification attached)
Delivery supply docket certifies that
the material delivered is the material
tested (delivery docket attached)
HOLD POINT: Superintendent or bioretention designer inspection and review of test results and certifications
before proceeding.

Comments (attach and refer to additional pages if necessary)




FORM C — Bioretention Media (cont.)

INSTALLATION OF BIORETENTION MEDIA

                                         Checked               Satisfactory             Action (if unsatisfactory)          Initial

Base of system free from debris

Drainage layer (fine gravel) installed
to correct depth (+ 25 mm)

                               CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
                                                                                   SYSTEMS                                      6

                                                               © South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.