Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:
FORM G — Landscape Installation
Purpose: To ensure the correct plants are supplied, installed and established.
Items Checked Satisfactory Action (if unsatisfactory) Initial
Correct mulch has been supplied
Mulch applied to correct depth and
secured
Supplied plants are correct species
Supplied plants are in correct pot
sizes and maturity (300 mm min)
Plants have been installed at correct
planting density (min 6 plants/m2)
As constructed drawings marked up
with final plant species and densities
Mulch is clear of plant stems by
approximately 50 mm
HOLD POINT: Superintendent AND bioretention designer inspection and sign-off before proceeding.
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
SYSTEMS 11
© South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.