Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Plants successfully established
plants propagation is occurring.
Measure of successful
establishment
1. Survivorship greater than 90%
2. 80% coverage of system
3. Preferably more than one
species per macrophyte zone
4. At least 5 plants/m2 (preferably
6–10 plants/m2)
5. Plant height of at least 50%.
This can be measures through
the use of marker or stakes
through the bioretention
6. Propagation is occurring (more
than 2–3 stems, seeding)
7. No weeds.
Growth and maturity should be
recorded through three-monthly
photo logs every 500 m2.
HOLD POINT: Superintendent AND bioretention designer inspection and sign-off.
Comments (attach and refer to additional pages if necessary)
NB: As constructed drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
SYSTEMS 13
© South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.