Skip to the record
Beware of cheap imitations.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                       BIORETENTION BASIN INSPECTION & MAINTENANCE CHECKLIST
 Stormwater Quality Improvement Device:                                                         Date:
 Location:                                                                                      Date of last Rainfall:
 Inspector:                                                                                     Weather Conditions:
 Time taken to complete inspection /
 maintenance


 What to look for                             Performance Indicator (PI)                        Condition Maintenance                            Additional Work Needed
                                                                                                Rating*   undertaken**
 SURROUNDS
 Damaged or removed structures                No damage that poses a risk to public safety or
 (e.g. traffic bollards)                      structural integrity
 INLET
                                              Inlet is structurally sound and there is no
 Erosion
                                              evidence of erosion or subsidence/settlement
 Damaged or Removed Structures                No damage that poses a risk to public safety or
 (e.g. pit lids or grates)                    structural integrity

 Sediment, Litter or Debris                   No blockage

 COARSE SEDIMENT FOREBAY (If Present)
                                              Minor erosion only that does not pose a risk to
 Erosion                                      public safety or structural integrity and would
                                              not worsen if left unattended
                                              Coarse sediment forebay < 75% full and no
 Sediment
                                              litter
                                              No damage that poses a risk to public safety or
 Damaged or Removed Structures
                                              structural integrity

*1 – PI met; 2 – PI met after maintenance activity; 3 – Additional maintenance needed; 4 – Rectification may be needed; NI – not inspected; NA – not applicable
** Quantify where possible e.g. amount of sediment or litter removed
Maintenance details adopted from Water By Design’s Maintaining Vegetated Stormwater Assets – Version 1 (2012). Refer to this document for further details
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.