Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
CALIBRE CONSULTING
APPENDIX C PROPRIETARY GPT - DESIGN, CONSTRUCTION AND
MAINTENANCE DETAILS
Appendix C1 – Gross Pollutant Trap Design Phase Details
Appendix C2 – Gross Pollutant Trap Construction Phase Details
Appendix C3 – Gross Pollutant Trap Operational Phase Details
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.