Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Contents HumeGard® GPT 1 System operation 2 Bypass chamber 2 Treatment chamber 2 Independent verification testing 3 System options 4 Variants 5 Inundation/tidal applications 6 Design information 7 Configuration of the stormwater system 7 Location in the stormwater system 7 Catchment area 7 Sizing HumeGard® GPTs 7 MUSIC/pollutant export model inputs 7 System installation 8 System maintenance 9 FAQs 10 References 10 Appendices 11 Precast solutions 28 Contact information 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.