Maintenance procedure
Maintenance of Humegard® units is generally performed It may be convenient on larger units to de-water some
using vacuum/eduction trucks. of the water in the holding chamber. This will minimise
maintenance costs as disposal of essentially clean
No entry into the unit is required for maintenance. The stormwater can be avoided. Often this can be done
vacuum service industry is a well-established sector, that onto adjacent ground or into the council sewer system.
services underground tanks, sewers and catch basins. However, this should only be done with the appropriate
authorities’ consent.
HumeGard® units are cleaned by adhering to the
following steps: If a HumeGard® has been fitted with an optional
removable basket, the basket can be used to periodically
1. Complete a Job Hazard Analysis (JHA) and a Work
remove litter in between scheduled eduction/vacuum
Method Statement (WMS) before undertaking the
maintenance visits. The baskets must also be removed
maintenance procedure.
prior to vacuuming/educting the HumeGard® for the
2. Prepare the site around the Humegard for cleaning.
sediment load.
This involves establishing the job site (traffic control
if required), assembling cleaning equipment,
positioning the vacuum truck and ensuring correct
equipment is available to use (including PPE).
3. Remove the rectangular lid above the holding
chamber and conduct a visual inspection to assess
the condition of the Humegard® and note if there are
any blockages or lodged debris.
4. Lower the suction hose to the surface of the water in
the holding tank and skim across the top to capture
floating litter.
5. Lower the suction hose to the base of the holding
chamber to remove sediment, organic matter and
litter which has sunk.
6. Dislodge materials trapped in the screen using a
water jet or brush/broom.
7. Remove the second rectangular access cover over the
diversion boom and ensure there is no debris trapped
underneath the boom.
8. Clean the interior of the pit using water jet.
9. Replace lids, ensuring they are firmly and securely in
place.
5 HumeGard® GPT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.