Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Example Job Safety Analysis (JSA)/Work Method Statement (WMS)
The following JSA/WMS is a guide only. It is the responsibility of the cleaning contractor or asset owner to develop their own JSA/WMS in line
with their own WHS requirements and constraints. It also assumes that there will be no entry into the unit during maintenance.

 Project/ Address:                                                                                                  Date:

 Job: Clean out of HumeGard unit                                                                                    Operator:

 Risk Level:                  1 - Extreme                  2 - High                  3 - Medium                     4 – Low                    5 - Negligible
 Consequence:                 Likely to cause very         Clear potential for       Similar to risk of driving     Little likelihood of any   Virtually Harmless
                              serious harm                 serious harm              a car                          harm
 Response:                    STOP THE JOB                 STOP and Reassess to      Control & ensure controls      Monitor to ensure risk     Continue work
                                                           find better way           work                           remains low
                                                                                   INITIAL                                                         PERSON           END
                PROCEDURE                             POSSIBLE HAZARDS                                            CONTROLS
                                                                                    RISK                                                         RESPONSIBLE        RISK
 1. Preliminaries:                             Nil                                    -      Refer to relevant manuals                           Operator            -
 • Confirm GPT locations and types
 • Familiarise with GPT technical manual
 2. Plan the Job:                              • Climbing in/out/around of truck      3      • Refer to safety plan on moving around             Operator            4
 • Room to access & work on the GPT                                                            vehicles
   without impacting other property or         • All GPT have a high risk of          4      • Wear PPE and never reach into or lift                                 5
   vehicles                                      containing syringes                           accumulated matter with hands. If a needle
 • Consider water flows & if excessive note                                                    stick injury occurs, wash the affected area
   & move onto next job                                                                        with soap & water & report the incident to
 • Condition & status of GPT                                                                   the branch and seek medical attention ASAP.
 • Identify water fill point
 • Identify waste dump point
 3.Establish Job Site:                         • Traffic                              3      • Devise a relevant Traffic Management WMS          Operator            5
 • Over 60 km/hr will require traffic          • Pedestrians                                 • Ensure barriers and signs redirect
   management                                  • Overhead power lines                          pedestrians
 • Within 6.4m of overhead power lines                                                       • Ensure spotter is present
   will require spotter
 4. Assemble Cleaning Equipment                • Infection                            3      • Personal hygiene (wash hands prior to             Operator            5
 • Position vacuum hose to remove debris       • Sharp edges                                   smoking/eating)
   from GPT                                    • Manual handling                             • Wear gloves & remove sharp edges/burrs on
                                               • Falling equipment                             equipment
                                               • High pressure water                         • Follow a manual handling WMS
                                                                                             • Store equipment securely on vehicle
                                                                                             • Inspect vacuum hose fittings firmly secured
                                                                                             • Inspect hose daily 7 ensure it has been
                                                                                               tested (6 monthly)
                                                                                             • Never cap jetting hose
                                                                                             • Inspect jetting hose for damage
                                                                                             • Never adjust pump pressures or regulators
                                                                                             • Maximum reducer on 1” hose is ¾”
                                                                                             • No reducers on ½” hose
                                                                                             • Fittings to be firmly secured using a spanner
 5. Open the GPT Cover                         • Manual Handling                      3      • Refer to a SWP for manual handling                Operator            5
 • Remove lid using the manhole lifting        • Open Manholes                               • Refer to a SWP for manhole lifting
   procedure
 • If lid is mass concrete & exceeds safe
   lifting limits, use mechanical lifting
   device
 6. Start Cleaning                             • Manual handling                      3      • Follow a SMP for manual handling                  Operator            5
 • Position bottom end of vacuum hose to       • Eye injury from flying debris               • Wear eye protection
   remove debris from GPT                      • Noise                                       • Wear hearing protection
 • Run vacuum prior to remove debris           • People inside exclusion zone                • Stop operation until area clear. Only
 • If there is any requirement to enter the    • Confined Space Entry (If                      essential personnel within exclusion zone
   pit for any reason, confined Space Entry      required)                                   • Ensuring minim slack in hose to prevent
   Procedure is to be followed                                                                 whipping
 • Vacuum all material out of the sump                                                       • Refer to confined space manuals and SWPs
   until empty clear 7 clean
 • Dislodge materials trapped in the screen
   using water jet ot brush/broom
 • Remove access cover over diversion
   boom/weir, ensure there are no debris
   trapped underneath boom/around weir
 • Clean the interior of the pit using water
   jet &/or brush/broom
 • Vacuum all materials out of the pit
 7. Finish Cleaning                            • Manual handling                      3      • Follow a SMP for manual handling                  Operator            5
 • Replace lid ensuring it is fimly &
   securely in place
 • Ensure all waste is vacuumed and site is
   clean prior to packing up
 • Complete the CWS recording all details
   and any problems
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.