Example Job Safety Analysis (JSA)/Work Method Statement (WMS)
The following JSA/WMS is a guide only. It is the responsibility of the cleaning contractor or asset owner to develop their own JSA/WMS in line
with their own WHS requirements and constraints. It also assumes that there will be no entry into the unit during maintenance.
Project/ Address: Date:
Job: Clean out of HumeGard unit Operator:
Risk Level: 1 - Extreme 2 - High 3 - Medium 4 – Low 5 - Negligible
Consequence: Likely to cause very Clear potential for Similar to risk of driving Little likelihood of any Virtually Harmless
serious harm serious harm a car harm
Response: STOP THE JOB STOP and Reassess to Control & ensure controls Monitor to ensure risk Continue work
find better way work remains low
INITIAL PERSON END
PROCEDURE POSSIBLE HAZARDS CONTROLS
RISK RESPONSIBLE RISK
1. Preliminaries: Nil - Refer to relevant manuals Operator -
• Confirm GPT locations and types
• Familiarise with GPT technical manual
2. Plan the Job: • Climbing in/out/around of truck 3 • Refer to safety plan on moving around Operator 4
• Room to access & work on the GPT vehicles
without impacting other property or • All GPT have a high risk of 4 • Wear PPE and never reach into or lift 5
vehicles containing syringes accumulated matter with hands. If a needle
• Consider water flows & if excessive note stick injury occurs, wash the affected area
& move onto next job with soap & water & report the incident to
• Condition & status of GPT the branch and seek medical attention ASAP.
• Identify water fill point
• Identify waste dump point
3.Establish Job Site: • Traffic 3 • Devise a relevant Traffic Management WMS Operator 5
• Over 60 km/hr will require traffic • Pedestrians • Ensure barriers and signs redirect
management • Overhead power lines pedestrians
• Within 6.4m of overhead power lines • Ensure spotter is present
will require spotter
4. Assemble Cleaning Equipment • Infection 3 • Personal hygiene (wash hands prior to Operator 5
• Position vacuum hose to remove debris • Sharp edges smoking/eating)
from GPT • Manual handling • Wear gloves & remove sharp edges/burrs on
• Falling equipment equipment
• High pressure water • Follow a manual handling WMS
• Store equipment securely on vehicle
• Inspect vacuum hose fittings firmly secured
• Inspect hose daily 7 ensure it has been
tested (6 monthly)
• Never cap jetting hose
• Inspect jetting hose for damage
• Never adjust pump pressures or regulators
• Maximum reducer on 1” hose is ¾”
• No reducers on ½” hose
• Fittings to be firmly secured using a spanner
5. Open the GPT Cover • Manual Handling 3 • Refer to a SWP for manual handling Operator 5
• Remove lid using the manhole lifting • Open Manholes • Refer to a SWP for manhole lifting
procedure
• If lid is mass concrete & exceeds safe
lifting limits, use mechanical lifting
device
6. Start Cleaning • Manual handling 3 • Follow a SMP for manual handling Operator 5
• Position bottom end of vacuum hose to • Eye injury from flying debris • Wear eye protection
remove debris from GPT • Noise • Wear hearing protection
• Run vacuum prior to remove debris • People inside exclusion zone • Stop operation until area clear. Only
• If there is any requirement to enter the • Confined Space Entry (If essential personnel within exclusion zone
pit for any reason, confined Space Entry required) • Ensuring minim slack in hose to prevent
Procedure is to be followed whipping
• Vacuum all material out of the sump • Refer to confined space manuals and SWPs
until empty clear 7 clean
• Dislodge materials trapped in the screen
using water jet ot brush/broom
• Remove access cover over diversion
boom/weir, ensure there are no debris
trapped underneath boom/around weir
• Clean the interior of the pit using water
jet &/or brush/broom
• Vacuum all materials out of the pit
7. Finish Cleaning • Manual handling 3 • Follow a SMP for manual handling Operator 5
• Replace lid ensuring it is fimly &
securely in place
• Ensure all waste is vacuumed and site is
clean prior to packing up
• Complete the CWS recording all details
and any problems
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.