SAFETY IN DESIGN HAZARD REPORT
App? Action
Consideration Hazard / Comment Controlling Action Action By
Status
provide and identify all existing services
prior to commencing construction. SWMS
where required.
Accessibility to services including pits / Confined space risks Contractor to comply with WH&S Contractor Ongoing
manholes / sumps for future maintenance. requirements during construction and
Consider location, access in, within and out. provide SWMS where required.
Location of substations
Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015 Page 12 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file] Calibre Consulting (Aust) Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.