Skip to the record
Accept no substitutions.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Design Velocity Check Through Critical Section of WQCP
Filename:         H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\[B14158.W_Riser Calc.xlsx]Crit. Section
Date:             5/09/2016
By:               CM

Critical Section Through WQCP

1 to102.5
     100 Y ARI
WSL (m)                                               100.28                              m3/s
        102

            Basin Water Depth Above Extended Detention Depth (m) Cross Sectional Area (m2)
    101.5 1               0.43                            100.28                           14.25
          2               0.54                            100.50                           19.86
          5               0.66                            100.65                           23.97
     101
         10               0.73                            100.77                           27.42
         20               0.82                            100.90                           31.39
    100.550               0.89                            100.97                           33.50
        100               0.96                            101.03                           35.41

        100
                                                 Extended Detention Depth
     99.5                                                                                        WSL (m)        Design Channel



        99
              0             5           10           15           20          25           30              35             40


                                       Basin Water Depth Above Extended
AEP (%)           Qin at B2 (m3/s)                                      Cross Sectional Area (m2)               Velocity (m/s)
                                       Detention Depth (m)
   63%                    2.58                        0.43                           14.25                                0.18
   39%                    2.97                        0.54                           19.86                                0.15
   18%                    3.52                        0.66                           23.97                                0.15
   10%                    3.96                        0.73                           27.42                                0.14
    5%                    4.30                        0.82                           31.39                                0.14
    2%                    4.64                        0.89                           33.63                                0.14
    1%                    5.07                        0.96                           35.41                                0.14

As indicated in the results, velocities range from 0.14m/s to 0.18m/s at the critical section. This is
only slightly above the velocity re‐suspension objective of 0.05m/s, but is well below the velocity
limits of 0.5m/s and 2.0m/s to protect against vegetation scour, as provided in Section 2.3.5 of the
WSUD Technical Design Guidelines (2006).

The following should also be considered:

           As mentioned the velocity check equation indicated in WSUD Technical Design Guidelines
            (2006) is determined based on outflow conditions. Our calculations have conservatively
            considered basin inflow conditions.
           The velocities determined do not take into account backwater effect caused by the outlet
            that has been designed to restrict flows for detention. This will reduce velocities.
           The velocities do not take into account the coincidence of flows from both that is expected
            to reduce velocities further.

The results above demonstrate that the velocities through the WQCP are appropriate to avoid scour
and are unlikely to cause re‐suspension of stored pollutants.
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.