Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Wetland location:

Area:                         Catchment Area (ha):                  Wetland Macrophyte Area (ha):

Civil drawing no

Landscape drawing
no.

Role/Stakeholder              Company                       Contact Name                       Contact Details

Developer

Site superintendent
(civil)
Site superintendent
(landscape)

Wetland designer

Civil engineer

Landscape architect

Civil contractor

Landscape contractor

Council compliance
officer

Checklist of Sign-Off Forms
                                            Date      Name of Signatory & Role
Sign-Off Form                                                                                                     Signature
                                            Completed (Superintendent)

Pre-Start Meeting

Form A — Earthworks Bulking
Out and Profiling
Form B — Bunds and Impervious
Liner (where required)
Form C — Hydraulic and
Functional Structures
Form D — Topsoil and Finished
Levels
Form E — Building Phase
(Macrophyte) Protection
Form F — Macrophyte Zone
Landscape Installation
Form G — Macrophyte Zone
Landscape Establishment
Form H — Inlet Zone Landscape
Installation and Establishment



Pre-Start Meeting
Pre-starting attendees to be listed and sign that that have attended and understand the design intent, construction and establishment
process.



                                                                                                                                          2
                   CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
                                                     Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.