Original source · versioned page text
16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Wetland location:
Area: Catchment Area (ha): Wetland Macrophyte Area (ha):
Civil drawing no
Landscape drawing
no.
Role/Stakeholder Company Contact Name Contact Details
Developer
Site superintendent
(civil)
Site superintendent
(landscape)
Wetland designer
Civil engineer
Landscape architect
Civil contractor
Landscape contractor
Council compliance
officer
Checklist of Sign-Off Forms
Date Name of Signatory & Role
Sign-Off Form Signature
Completed (Superintendent)
Pre-Start Meeting
Form A — Earthworks Bulking
Out and Profiling
Form B — Bunds and Impervious
Liner (where required)
Form C — Hydraulic and
Functional Structures
Form D — Topsoil and Finished
Levels
Form E — Building Phase
(Macrophyte) Protection
Form F — Macrophyte Zone
Landscape Installation
Form G — Macrophyte Zone
Landscape Establishment
Form H — Inlet Zone Landscape
Installation and Establishment
Pre-Start Meeting
Pre-starting attendees to be listed and sign that that have attended and understand the design intent, construction and establishment
process.
2
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.