GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Page 12 of 49
GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
views of a hydraulic consultant working for a developer.
A local government such as Noosa Council must consider a wide range of often conflicting
interests and expert opinions when determining their maintenance schedule and their strategy
for the management of waterways. The opinions expressed with the ‘Hydrology & Water’ report
may be appropriate purely from a flood management perspective, but may not be appropriate
when all issues are considered, including available funds.
On this matter, it is my opinion that:
e Clearing natural wood debris from creeks can reduce the risk of debris blockages, but also
increases flow velocities within creeks, which increases the risk of channel erosion, which
increases the risk of more woody debris becoming available.
e Thus, there is the risk that clearing woody debris simply increases the risk of more woody
debris becoming available.
e Rather that taking the environmentally destructive option of removing woody debris from
creeks, the best option is to incorporate design features into road culverts that reduce the
risk of this debris adversely impacting upon flood levels.
e In most cases it is my recommendation that ‘natural’ woody debris should remain within
creeks, and only removed when it collects against structures such as debris traps and
culverts.
Culvert design options for the management of debris at the culvert
Design options for the management of debris blockages at road culverts include:
e Use of debris deflector walls (usually used in association with box culverts).
e Use of debris collection poles (able to be used adjacent both pipe and box culverts).
In this case | would consider the use of treated timber debris collection poles the likely best
treatment option.
aia we : ry
a y s = r se ta ‘ Pare
: ° in r | Fer Wake ;
‘ Be aoe ee aes 4 Ir EN -
i 2, roo ‘ he at aks a
mr Bo :; a bey
s es SS : ey c : ri a
Figure 3 — Debris deflection walls Figure 4 — This is not a good example of
debris collection poles
Recommendations with regards to the overall design of the Garnet Street upgrade
With regards to the overall design of the road upgrade | offer the following recommendations:
e Adopt the debris blockage conditions as outlined in Table 1.
e Consider all design options that would avoid the use of solid traffic barriers along the
floodway, such as:
Printed: 06 November 2014 CREEKS: CORRIDORS OF OPPORTUNITY Page 4.
Page 12 of 49See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.