GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Previous Recommendation to the Planning and Organisation Committee dated 14 October
2014
That Council note the report by the Senior Development Planner to the Planning & Organisation
Committee Meeting dated 14 October 2014 and the further report to the General Committee
Meeting dated 20 October 2014 regarding a request to change existing approval 132004.240018
and approve a change to Condition 65.1.2 as follows:
Condition 65.1.2
The remaining section of Garnet Street extending from the Pine Street intersection (and
excluding the section to be upgraded to an external Urban Collector Road) to approximately
inline with the eastern boundary of Lot 189 on MCH 976 shall be upgraded to an External Rural
Distributor Road. The upgrading of Garnet Street shall also be designed to enable flood free
access to the site during a 1 in 2 year Average Recurrence Interval (ARI) flood event with a
maximum trafficable depth of 200mm for a 1 in 10 year ARI flood event and with the product of
flow depth and velocity being less than 0.4m2/s. This part of the road must be completed prior to
the sealing of the survey plan for Stage 3 or any other subsequent stage of the development,
unless an alternative agreement is entered into by the Developer and Council by way of an
Infrastructure Agreement.
Based on the further assessment undertaken since the previous Council meeting, an amended
recommendation is proposed.
PROPOSED RECOMMENDATION
That Council note the report by the Senior Development Planner to the Planning & Organisation
Committee Meeting dated 14 October 2014 and the further report to the General Committee
Meeting dated 17 November 2014 regarding a request to change existing approval
132004.240018 and:
A. Approve a change to Condition 65.1.2 as follows:
Condition 65.1.2
The remaining section of Garnet Street extending from the Pine Street intersection (and
excluding the section to be upgraded to an external Urban Collector Road) to
approximately inline with the eastern boundary of Lot 189 on MCH 976 shall be upgraded
to an External Rural Distributor Road. The upgrading of Garnet Street shall also be
designed to enable flood free access to the site during a 1 in 2 year Average Recurrence
Interval (ARI) flood event with a maximum trafficable depth of 200mm for a 1 in 10 year ARI
flood event and with the product of flow depth and velocity being less than 0.4m 2/s. This
part of the road must be completed prior to the sealing of the survey plan for Stage 3 or any
other subsequent stage of the development, unless an alternative agreement is entered
into by the Developer and Council by way of an Infrastructure Agreement.
B. Include the following additional condition:
The design of the works must be in accordance with the relevant industry standard blockage
factors for pipes, safety barriers, hand rails, fencing and the like and include appropriate
structures to manage debris.
Page 5 of 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.