Original source · versioned page text
2014-11-17 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Page 7 of 49
GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Celis SMEC
, °
Lecal People, Global Experience.
Level 1, Building C, 6 Innovation Parkway
Birtinya, QLD 4575, Australia
(PO Box 179, Buddina, QLD 4575, Australia)
T +61 7 3029 6700 F +61 7 5437 6525 E [email protected]
www.smec.com
5 November 2014
Noosa Council
Po Box 141
Tewantin QLD 4565
Attention: Mr Denis Wallace,
RE: Greenwood Grove - Garnet Street Upgrade
Response to Dennis Pitman
Further to our site inspection and subsequent correspondence issued Friday, 31 October 2014, SMEC and
Hydrology & Water offer the following:
Item 1 - Confirm / Certify that the 20% blockage factor has been assessed in accordance with ARR 2014
methodology.
Response: Attached with this letter is a response from Hydrology & Water dated 5 November 2014.
Item 2 - Confirm that modelling shows 300mm + freeboard is maintained to Pitman’s house. Council’s records
indicate their FFL is at 110.565.
Response: Hydrology & Water has confirmed that the “1 in 100 Annual Exceedance Probability (AEP) design
flood level, adjacent to the main building on the Pitman’s property, for the upgraded Garnet Street culvert case
with a 50% blockage factor is up to a maximum of 110.06m AHD. This means that, even under high blockage
conditions, the building will still have over 500mm freeboard to the peak 1 in 100 AEP flood level”.
Item 3 - Confirm that consideration for their access provisions accords with QUDM.
Response: Hydrology & Water has reported the small culvert crossing under the Pitman’s driveway will be
subject to reduced flood levels during the Q10 event (and smaller) due to the Garnet Street culvert upgrade.
As part of the Garnet Street upgrade a new breakout type driveway will be constructed to tie-in with the new
kerb. Beyond this, the Pitman’s driveway will remain unchanged as this is outside the current scope of works.
Please do not hesitate to contact the undersigned should you have any queries or require further information.
Regards,
FA ray =
Brad Downes
Urban Engineering Principal — Sunshine Coast
Fm nny a Pem, ay
CONSULT AUSTRALIA SMEC Holdings Ltd ABN 84 057 274 049 SMEC international Pry Ltd ABN 32 085 440619 i si (e % iF *
Se SMEC Australis Pty Ltd ABN 47 085 475 149 SMEC Services Pry Lee ABN 79 056 504 792 i
Bare | Pngeeng | On mr Clone Mart comav® = Giekatateomay® — Glehal Mat vom av
Page 7 of 49See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.