Original source · versioned page text
MCU14-0039 Flood report and flood man Plan rev August 2015
The original of this document is very large (40.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnComo Glasshouse P/L C/‐ Martoo Consulting P/L Flood Impact Assessment – 305 Lake McDonald Drive Cooroy 1. INTRODUCTION 1.1 Background Water Technology Pty Ltd (WT) has been commissioned by Como Glasshouse P/L on behalf of Martoo Consulting Pty Ltd (Martoo) to undertake a flood impact assessment and flood management plan for an existing Greenhouse structure located at the D’VineRipe Tomato Farm, 305 Lake McDonald Drive Cooroy. A development application under Council file reference MCU14/0039 for a Material Change in Use application has been previously submitted to Noosa Council in 2014. We understand that this application was made following Council’s determination that the since constructed greenhouse at the site was deemed to be an intensification of use and accordingly required development approval. Council has since issued an Information Request (IR) for the application dated 25 June 2014 under Council reference 01569. This IR requested further information against a number of items and in the context of flooding included a flood impact assessment as well as a flood management plan under Items 1 and 2. 1.2 Purpose and Intent This report has been prepared to specifically address Items 1 and 2 of Council’s IR dated 25 June 2015. Accordingly, this report has been prepared in 2 distinct chapters as follows: ‐ Chapter 2 – Flood impact assessment, which includes the following: ‐ Background information; Site description; Summary of hydraulic modelling methodology; Overview of modelling results (existing and post‐developed); and Discussion of impacts. Chapter 3 – Flood Management Plan, which includes the following: ‐ Available flood warning at the site; Rate of rise of flooding; Evacuation routes and egress; Measures to protect the existing infrastructure during flood events; and Appropriate strategy and site specific measures to minimise flood risks at the site and potential contamination from hazardous material stored at the site. Further details relating to the methodology and findings for the assessments are discussed separately in the chapters of this report which follow. 3917‐01 / R01 v02 ‐ 31/08/2015 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.