Bs Ne@leKw we Checklist - Applications Involving Land

Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1. APPLICATION FORMS , oy
1.1 Form1 PartA
1.1.1 Ensure that the form is fully completed. iV

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 {f the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. LA

2. REFERRAL INFORMATION

1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. [A]
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. mv

3. ENVIRONMENTALLY RELEVANT ACTIVITIES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. © FORM 2 - REQUEST TO CHANGE APPROVAL i yt
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5.. PLANS |, os ao RL
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational [+4
Works) accompanies the application. In addition ensure that each set is complete. !
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is u
unbound.
6. SUPPORTING INFORMATION —_ eo eee eg
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration Uw
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. y
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. [4]
7 FEET
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, u
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form. M

 

 

 

 

   

Receiving Officer LA... Ow MOR ecceccsttneeteee pate... 3/se fr beseeees
om

Having completed this form and accepted th plication, please deliver both to the following IDAS Application Receiving }.

trays:-

« — Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

« Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

«  Inall other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 35 pages

Page 2

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

@
<a

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
fequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qld.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fncludinghouse number, street name, suburtvlocality name & postcode) {if applicable)
All land the subject of the application, must ba ‘
identified. However, @ description of the land is not | 20 Bayview Road, Noosa Heads |
a enh tet teen ea 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - C2 apples i [ N/A
development is proposed within a water body or
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be 7
identified by a tot on plan description, These details [ Lot 6 on SP 174659, Parish of Weyba
Re onated Tom Hie documents oriwough ite} 4 The above description is for: (tick applicable box)
However, ifthe land on which the development is XJ (i) the land on which the development is proposed; or
Ce ee ee atne C1 (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide ~ proposed; or
OE en eecmegon fr the C1 (iii) the water body or watercourse.
ii) GPS. inates where there i
" ingadacen ard (ep Meret Bay 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha);
- Q7 does not apply if the
development is within a water body or watercourse. | NIA | | N/A J | 1,862m2 J
= 08 applies if a a . j
development is wihin a local government area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) {if applicable)
Note: Areas below high water mark are not within a | Noosa Shire Council |
focal government's area unless provided for under the
Local Government Act 1993. 9, Port authority for the strategic port land or strategic port fand tidal area on which the
Advice for completing Q9 - Q9 applies if i . is ‘tte) (i i
developments on strategic por land ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
port fand tidal area, For more details refer to Guide 11 [ NIA |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
povceinerstainen speapicamn | ( Dweling House |
11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquacutture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
| Dwelling House |
Other applicable parts of Form 1 12, Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
Part A must always be accompanied by other | Part E |
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1,
Applicant details 13. Applicant's name: 15. Contact person:
oeE ee ee toc rate Thomas Muster c/ Martoo Consulting Hannah Blue
When signing and todging this appticati Pry Ltd 16. Facsimile number/e-mail address:
p i 14. Contact number: 5455 5725
8! fre Clef Pxecutive 9455 5425 [email protected]
this information wh
raxen is ns 47. Postal address:
cantina comgany- aconiatpessi \ | [BO Box 1684, Noosa Heads Q 4567 ~|
ws
: 18. Signature: ~ 19. Date:

30 MAR 2007

HGOSA SH
FRONT (Mia.

   
  

 

 

March 2007

CTL _

 

 

 

Page 3

INTEGRATED PLANNING ACT 1997
Land owner's consent {if eppiicable)

Section 3.2.1(3) of the IPA prescribes that an
appfication must contain, or be supported by, the
written consent of the land owner's, if the application
involves:

() a material change of use;

i) reconfiguration of a let;

Gil), work on fand below high-water mark & not within a
canal as defined under the Coasta! Protection and
Management Act 1995;0r

(iv) work on rail corridor land defined under the
Transport Infrastructure Act 1994.

Section 3.8.1(2)(a) of the IPA provides that

Jandowner’s consent Is nof required for a mobile or

temporary ERA .

For more information refer to Guide 1,

20

Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:

 

 

Name Signature Date
() Thomas Muster Note: ownesS
of Consent not |!
nf OCOD
(iv)

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Pp!

Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

resource entitlement be given for applications that

involve a prescribed State resource. X NO - go to Q24 O YES - go to Q22

Section 3.2.1(10)(a)(i) of the IPA prescribes that . ar . .

application pallid to be property ale 22. This application is accompanied by evidence: (tick applicable box)

vines evidence ee ee entidement C1 (i) of the allocation of, or entitlement to, the resource ~ attach evidence and go to Q23(vi)

Refer to schedule 10 of the Integrated Planning (1 (ii) the chief executive of the department administering the resource is satisfied the

Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource - go

required by the State in support of the lodging af this to Q23 ae

development application,

D (ii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

Advice for completing Q23 23. Evidence of the resource entitlement:

The information in (i) - (v) is mandatory if evidence i : . . . Fr :

rea te OS i fa) aoe evtencos (i) Resource entitement / authority details (vii) Official stamp of the department
The official stamp af the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the 7 applicable)

application involves any water or riverine quarry {ii) Name of delegated officer

material under the Water Act 2000.

Section 3,2.1(5A) allows the resoutoe manpet to limit

the time the evidence may be used. (vi) must be iii iti

completed if the evidence is time limited, (i) Ce ———— of delegated officer

(iv) Signature of delegated officer

(v) Date

(vi) pen date of evidence a

Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

This checklist does not apply if the application requires _ te i pe

the completion of Paris A and B of the Form only. It YES (NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made

Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact.

 

 

 

Plan { Drawing / Report Number Title Date
. Proposal Description (including | March
(i) 00656 LOS HB Proposal Plans) 2007

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (eppticable to assessment manager's)

FEE(S) DATE

RECENVED

32/alor | RECENING OFFICER'S IS See 7

REFERENCE
NUMBER/S

lof bey |

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

 

Notification of Engagement of Private Certifier (Optional fomat)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

Date ofengagement / / Accreditation Number. ___ Name: Signature:

 

 

Page 5

 

2

INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004

      
  

Form 1 Development Application

Operational &/or building work

t=
@2
assessable against a local government’s planning scheme <

  

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.

 

 

Nature of the application 1. This application is for (tick one (1) or both if applicable)

A development permit authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewer
development to occur, while a preliminary O infrastru ny “pp pro " type &9 ' , rage
approval is a step in the approval process =

and does not authorise development to occur. | |

 

The types of work that are assessable against!
a planning scheme are determined by the AND / OR

 

 

 

scheme for a particular local goverment and KX] Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
will vary across the State. .
To determine the types of work that are infrastructure, ete
letermi wt 7
assessable under a particular planning [ Landscaping, Earthworks and Access & Frontage
scheme, contact the relevant local .
govemment 2. Are the works subsequent to a previous development approval?
me) EX] YES - provide detaiis of all previous approvals (eg. file references)
[ 12592 DA

 

3. _ Is the subdivision for a canal estate?
NO (1 Yes

Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

applicable) Dd YES
— complete Q5
Prior to issuing a development permit for the P
works, the assessment manager is required oO NO - Q5, 6 & 7 do not apply

by law to ‘sight’ an approved form, issued by |
Qleave, whichsignifies that the PLSL levy 5. Has the PLSL levy been paid?

has beefi paid (1) YES - compieteas
) NO - the applicable levy must be paid before a development pemnit can be given for the works

6. How much was paid?

| |

7. Whatis the receipt number of the payment?

L 4

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
tequested by Part A and any other relevant part of Form 1.

 

 

 

 

 

 

OFFICE USE ONLY (appicabie to assessment manager)

  

 

REFERENCE
DATE RECEIVED NUMBERS

 

 

 

 

 

Page 6

~*
a

t INTEGRATED PLANNING ACT 1897 Part E, Version 2.0, 4 October 2004

 

(i) Is a PLSL levy applicable in this instance? CJNoO (YES - complete ati

(i) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application?

(NO LD YES - provide receipt details below

 

| _|

 

 

Page 7

«

\\co INTEGRATED PLANING ACT 1997

. ‘Version 19.0, 2 March 2007

     

IDAS Assessment

Checklist

(Formerly the “Referrals Checklist’)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

4. This checklist was formed refered to 2s the "Reterrats Checkiat". Some of the ‘Guides’ to using the (DAS Application Farms continue to refer to this document 2s tha
*Rolerrals Checklist’, The namo of this checMist was changed from 25 July 2005 lo more acourataty describe ks function.

2. Undesthe IPA and IDAS framework, an application may require assessment by the local Councd andlor cortzin Queenstand Stats entiies (2.9. Environmental Protection
‘Agangy, Dept. of Natural Resources and Watar, Queensland Herilage Council etc.)

s

‘This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entty and may also assis! the applicant to

determine the assessment manager for the application,

PN mae

“Therefore, tha completion of all questions in saction 4 cf this checklat ia mandatory for al appicallons (other than thase raquiing the completion of Parts A & B anty).
tis the responsiblity ofthe applicant to accurately complete thie chectdtst,

Section 2 is mandatory only ithe proposed development is located in any part ofa wid rivar area declared under the Wid Rivers Act 2005.

Depending on the nature of the application, an applicable Stale enity may be ether the assessment manager or an IDAS referral agency ‘or the application.

The assessment manager cr the application wil rely on the information provided inthis chocklis! (as well as any material lodged in support af the application) io identity

ary applicable referral agenolas for the application in the Acknowledgement Notice, The asssasmenl manager wit also rely on this information when identifying if Ube

application triggers referral coosdination?.

9, To assis! you in answaring the folowing questions a sarles of guides are avaliable free from the IPA wabsite www.ipa.cl1.gov.au Guide 25 explains the role of the IDAS
Assessment Chactis! In the IDAS application process, and Its relationship to the Form 1 development application.

10, ‘Any other parts of For ¢ thal this chacklis! raquiras lo be complaled are avaiable from the Counal or the applicable State entity, or can be downloaded free fom
wwe ipaaid qoy.oy,

11. Section 3 provides advice about the ceferrals that can be caquired for apptications for building work assessable agains! the Building Regutution 2006.

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The foflowing siate assassment triggars apply to development ather than for bulding work assessable against the Building Regulation 2006.

Environmentally relevant activity
For more information rater to Guide 4,
LUnloss you enswored ‘none of tho above’ to 1,
the applicaion requires sssessinant by Ihe

oe _

‘Note: An application involving ERA 19 andr 20
wi leo require carmplatn of Part Ky of For 4
for approved where an aocation under Ko Weer]

 

‘Act 2000s roquired.

1,

The application involves: (tick applicable boxtes)

(1) an environmentally relevant activity (ERA) for which a code for environmentat compliance
has not been made - conplete Part G of Fonn 1

(C1 @® amobite or temporary ERA for which a code of environmental compliance has not been
Made - complete Part G of Form 1

] (ii) none of the above

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed IDAS Assessment Chocklist (if applicable).

 

OFFICE USE ONLY (applicable to ossessment manager)

 

[__ DATE RECEIVED

 

|__ REFERENCE NUMBERS

 

 

1. The eseeserant manager ia ceaparmibla or ansesaing ond deciding an IDAS sogicalion. The amsariment manager for an epplcaton ie proscnbodin schedkée 8A dle PA.
2. For edsiicna ictrrnaion rebar to Guide 8 Does my application tgper Oe refer! coonination process?
The ‘edhiniterng au only may be ether the Environmental Proacicn Agency, the retovant local goverment (orm devatved ERA} or the Queensland Departnant of Primary tndeutries and

Fiaherion (he © delogaied ERA),

Paget

 

   
   
 
   

INTEGRATED, an. 1997

State-controlled road matters
For more information star bo Guide 3.
Unless you answerad ‘none ofthe abows' ta 02,
tte epplcaion tiggare refer tothe Departmen

{n certain creumstonces DMR wil be an adkioe
gency, wtiin ober Graumetances DMR wi
be a concuranos agency.

‘Schedule 2of tha IP Ragulaton wal assis! you bo
dolorrine whers DUR is an advice or

‘concurrence agenoy lor the applcafin

IDAS Assossmont Chackist, Version 19.0, 2 March 2007
2. The application involves: (tick appicate boxes)
(C1) development on land contiguous" to a State controlled road and for -
(] (a) material change of use assessable against the planning schema;
0 ) reconfiguring a fot unless -
« the total number of lots Is not increased; and
« the total number of lots abutting the State-controlled road is nol increased;
C1 (c) operationat work (not associated with a matesial change of use assessable against tha
planning scheme or reconfiguring a lat mentioned in {b) above)-
+ associated with accass to a State-controlied road; or
«for filing or excavation; or
+ involving the redirection or intensification of sita stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
‘State-controlied road.
Df development on land not contiguous to a State-controlled road and -
O @@) material change of use -
assessable against the local government's planning scheme; and
© mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
0) reconfiguring 2 tot for a purpose mentioned in schedule 5 of tha IP regulation
and exceeding the thresholds set by that schedule;
O(c) operational work (not associated with a material change of use assessatve against the
planning scheme or reconfiguring a lol mentioned in (b) above}
+ assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the [P Regulation and excesding the thrasholds set by
that schedule.
EX1(il) none of the above

 

 

 

 

Clearing vegetation

For mone information rer to Guide 12.
Uniess you answered ‘none of the above" to 03,
‘he application requires ssvessment by the
(Deparment of Natural Resources and Water
(NRW).

{tan agency olhor than HRW is fhe assossmont
‘manager for the appcation, NRW is @
‘concusrence agency for ho application in retaon|
bis mater,

you icked 0349 oF (2), your application raquires|

3. The application involves: (ck applicable box'es)
oOo material change of use -
(a) assessable against the planning scheme;
(b) on alot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegatation; or
* if there is no property map of assessable vegetation for the lat - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
{d)_ where the size of the land is 2 hectares or larger - complete Part Jof Form 1

 

 

 

 

 

 

 

 

‘efaral to NRW for assecsment cogardiess of (i) reconfiguring a tot -
\whother vegetation clang is propocad
" ant (a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration Is 2 hectares or larger,
{c} where 2 or more lots are created; and
(GQ where the size of any tot created is 25 hectares or smaller . complote Part J of Form 1
COG) operationat work -
(a) for the Gearing of native vegetation where the vegatation clearing Is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) of reconfiguring a lot mentioned in (ii) - compete Part J of
For 4
Ef) none of the above.
‘Strategic port land 4. The application involves:
For more information rotor to Guide. devel .
Hyataadfh. be Pot Autocly obe a ey opment on strategic port land as defined In the Transport infrastructure Act 1994 (T1
‘sssesament manager for fhe applicator. complete
Hyou ficked (7) Queensiand Transports 3 0 @ a material change of use that is inconsistent with the land use plan approved under the
‘coneurrance agency for the application. Tl Act for the strategic port land - complete Part t of Foon 7

1 Gil) none of the above

 

 

4 Land contiguous 1 2 State-convoled med is detined in schedule 14 of he IP Ragefuton to meen land -é part d he lend is within 100m of te Stee conictied road; or hat w partota hae Sisto
ed.

contrfied

Page?

Page 8

”

‘“Nuee INTEGRATED PLANNING ACT 1997

Davelopment within the limits of a
port

For men indormaion rer io Guide 18. For
information shout

prescribed fda work retort
Guide 24,
Wyou enwwerad "YES" to 012, the application
(rigors referral to the Port Authority,

The Pat Authority isa conauranoe agancy J tha]

development in —

© wifin 200m of a shipping channel or an ant:
fend exit ahipping cond for tho port

© wifi 1000 of a swing basin, a coornarigl
shipping what, 2 mooring, anchorags or spi

grounds,

© wibin $000 of a planned port facly
‘denied in and use plan approved dor
tha Transport inzasiucture Act 1004.

{In el other sation te Port Authority i an

adviog agency.

ice seis vas $910, 2 March 2007
12. Does the application involve development below high water mark'® and within the limits of a port
under the Transport infrastructure Act 1994?
no

[YES -complate Part M of Form 1, or Part P of Form 1 ithe work is presoribed tidal work

 

 

Marinas
For more iegormation refor to Guida 18. For
abot re

13. Does the application involve operational work that is tidal work for a marina‘ with more than 6
vessel berths?

& No

 

 

 

 

 

 

 

is ba assocsmank for al , .
overnertis eo manager [71 YES - complete Past M af Form 1, or Part P of Form 4 ithe tidal work is prascribed tidal work
{you enewered "YES" lo O13, the appicalion
‘biggers referral to Quocns/and Fire and Rescue
Servign as on advice agency.
Tidal works in strategle port land tidal) 14, Ooes the application involve tidal works within a strategic port land tidal area”?
areas NO
For more information rofec bo Guida, 18. CO YES - complete Pat M of Form 4
Untasa you answered "NO" 0.014, he ralovant
fc Asin te senna ae
Sina ws nt atm
‘re conaurTence agancis for fhe appicasion.
Heritage 15. Does the application Involve development in a herilage registered place as defined under the
or turthor indormalion refer to Guia 19. Queensland Heritage Act 1992?
{you answered YES" to 015, the application ®no
{tiggore rolesral lo the Queensland Heritage
Gouned as concurterice agancy forthe YES - compote Pat C of For 4
‘applicaiion,
Declared catchment areas 16. The application ts in an area declared to be a catchment area under the Water Act 2000 and
Fer mar domain nding of he Involes: tick the applicable boxes)
aa aie arvea wihin rd (OQ reconfiguring a fot i any lot resulting from the reconfiguration is tess than 16 hectares;
Unless you arswered “none of the above” fo. (Di) development assessable against the planning scheme involving the establishment or
O46, tho appticafion requires assessment by the expansion of a waste water disposal system, other than a disposal system for carrying
RW) out an environmentally relevant activity under the Environmental Protection Act 1994;
Ham agency other than NRW is the assessment, Ox] (ii) none of the above
manager tor the application, NRW ia a
Cconuxrance agency for fhe application in
takaton to this mat,

 

18 High watar ark is dined ia the Cosstel Protection and Managamect Act 1005 and meurs the ordinary high wail mark at epring ta
19 Marina ie dotined in tre Transport Operations {Marine Poikaion) Regutation 1005,
120 Stestegic port tard Gal uraes are the wrzes generaly 50 rates coeward ol high wafer mark adjacent ib strategie port land.

Paes

ae

Contaminated land
Appiications invatiing enateriat change of use
‘end or reconfiguring a fot may Figgar Ia
referral,

For more infomation refer te Guid 5.

Unlees you answored ‘none ofthe above fo
(017, the appicaon requires sssessmard by the
(Eqvizorrentad Protection Agancy (EPA). If an
‘agency other then EPA is he assescmant
manager for the application, EPA wilbe a

(DAS Assezsment Cheoidisl, Version 19.0, 2 March 2007

17. The application involves: (tick the applicable box/as}

(CQ reconfiguring a fot tor which a of part of the premises are -
(3) premises mentioned in the 1PA, schedule §, part 1, table 2—
+ item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph {e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum

activity; or
(b)_ in an area for which an area management advice has been given for unexploded
‘ordnance - complete Part N of Form 1
Di ti) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the ptanning schema and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
©) (a) none of the above

 

 

 

Electricity infrastructure

For more indormation refer to schodu#o 2of the [P.
Bagusion.

\Uninss you answered “none of the zbove’ to
‘O18, the appiication triggars referral to the
‘aoancy lo which the easement is ranted in

teeout of #3 acvico agency.

18. The application involves: (tick the applicable bax/es)

(0) reconfiguring 2 tot where any part of the lot is -

« subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

Situated within 100m of a substation site;

fi) a materia chango of use, assessable against a planning scheme and not associated
with reconfiguring a lot if —
© any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act and

«= any structure or work that is the natural and ordinary consequenca of the use is, or will ba,
located wholly or partly in the easement;

Citi) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

1 () operational work that is filing or excavation assessable against the planning scheme,
Not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement,

» the work is located wholly or partly within 10m of a substation ste;

{] {v) none of the above.

 

 

 

cael
Land designated for community
infrastructure

For more inkomation refer to schedulo 2 of the
IP Readation.

Ifyou answered “YES* to 019, tha application
requires essessment by the chiet axscutve of
te pee °

the development forthe designated purpoes.
tan agency other than tho designator is the
‘acsessmani manager fr the appcaion, the
dacignaing agorcy wil bo 3 concurrence:
‘ncy forthe appicalion in rettion to this
malior.

 

19. Does the apptication involve development assessable against the planning scheme and on tand

designated for community infrastructure?
(intended to be supplied by a public sector entity; and
(i) on land not owned by or on behalf of the State; and
(ii) other than development —

(a) for the designated purpose; or

{0) carried out by, or on behalf of, the designator.
NO
(1 ves

 

Pagaé

Page 9

2

\sunrecraren PLANNING ACT 1997

, 19.0, 2 March 2007

 

 

 

 

 

 

 

 

 

 

 

Koala habitat area 25. The apptication involves: (tick the eppiicable box‘as}—
nee Opa material change of use of premises in a koala conservation area or koala ;
Unioes: sustainability area made assessable under a planning scheme, that is not for a domestic
you arearad “rons af he above, the “ : *
ppBcaiion coquires méorral to the Environments activity and will resuk in-
Protection Agangy 28 a concurrenca agency, (1 @) clearing of native vegetation over an area greater than 2500m?;
(10) anew building and any reasonably associated structure with a total footprint
greater than 1000m?,
(1) anextension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;
1 (¢) extracting gravel, rock or sand from an area greater than S000m?;
(e) excavating or filing an area greater than 5000m?;
(Cth additional traffic in 2 koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.

(C1 (i) reconfiguring a fot in a koala conservation area or koala sustainability area that will

result in —
(a) an increased number of tots;
(1 tb) clearing of native vegetation over an area greater than 2500.

C. (i operationa! work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (i) above) that wit resutt in the clearing of native vegetation
over an area greater than 2500m?.

{C1 (iy) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (nol associated with a material change of use
mentioned in (7) or reconfiguring a fol mentioned in (3) above) that is not for a domestic activity
and will result in -

(12) clearing of native vegetation over an area greater than 2500m?;
(10) extracting gravel, rock or sand from an area greater than 5000m?;
(1) excavating or filing an area greater than 5000m?.

[J (v) none of the above,

Wild river area 26. Does the application involve development in a wiki river area declared under the Wid Rivers Act
Fc nore nornaon rk t ida 22 2005?

lHyou angwered YES to 028, you must oso No

complete soction 2 of this checklist. This wil

conabla you lo dalurrine d your eppcation can Olves

procoed in a wilt river araa and which raked

‘agonoy wil assexs your application against tho

Wild Rivers Code, o ithe propariad

dovlopment is ‘profit’ in a wid river aroa.

Hole: Davolopment can be ‘prohiitod’in 2 wid

{iver sew becaune the applicalcn cannot be

‘scoxpted by the assossment maxtager,

Referral coordination 27. Does the appiication trigger referral coordination?
{information request cpires refer, NO

soordnation if the application iwobves —

11 YES, as the application: (tick the applicable baxtes)

 

 

 

 

 

 

prusorbed in [11 __ triggers 3 or more concurrence agencies;
schodule? or 8 of the [P Regudatort or [C@ | invohes a material change of use made assessable under a planning
8 ippiatin ipenhary ppd scheme and prescribed in schedule 7 of the IP Regulation;
meninedinss18othe IEA Ci Gil) involves a material change of use {other than a dwelling house, outbuilding
Fer mers information go to Guida 2 and Guide 6. ‘or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;
(1) is for a prefiminary approval mentioned in s3.1.6 of the IPA
Referral agency responses priorto 1/26. Did a referral agency give a referral agency response under 3.3.2 of the IPA before the
lodgement application was made to the assessment manager?

‘Under 33.3.2 of IPA a selarral agancy may give aj
referral agancy recponse on a mation wits its
juriedcion about a propost belore an
“appicalion for be proposal is mato lo the
ssoecrnend anager.

Thisie carmonly the case whera en application
requires reforal tb 2 bulking rofertdl agency (69,
‘Old Fire and Rescue Service).

 

No

{01 YES - attach 2 copy of the referral agency responses

 

Paged

Page 10

Our Reference: 00656 LOS HB consulting o
pty Itd
town planners +

urban designers
abn | 86 120 928 707

29" March 2006

Chief Executive Officer
Noosa Shire Council
P.O. Box 141
TEWANTIN Q 4565

Attention: Land Use Section A SHIRE COUNCIL
NOPRONT COUNTER

 

e@ Dear Sir/Madam

RE: Application for Development Permit for Operational Works (Landscaping, Earthworks
and Access & Frontage Works) situated at 20 Bayview Road, Noosa Heads described as
Lot 6 on SP 174659, Parish of Weyba: Thomas Muster

Martoo Consulting has been engaged by Thomas Muster, as applicant for the above proposal to submit a
development application to Noosa Shire Council under the Integrated Planning Act 1997. This
application seeks approval for a Operational Work for Landscaping, Earthworks and Access & Frontage
Works at 20 Bayview Road, Noosa Heads.

THE SUBJECT SITE & APPROVALS

The subject site comprises an existing lot which is described as Lot 6 on SP 174659, Parish of Weyba, County
of March. The subject site has an area of 1362m? and is afforded access directly from Bayview Road. A
location map is included as Attachment 1.

e@ A recently developed two storey dwelling house is centrally focated on the site. This premises was
development as part of the Viridian Development — Stage 1 — Bayview Houses, and accordingly is
controlled by conditions of approval contained in Judgement No 3651 of 2000 (Planning and
Environment Court). It is noted the site has also been the subject of two subsequent submissions to

Council. These are detailed as follows:

+ Application for a Change to a Development Approval for Group Housing Development —
Widen driveway, extend pool & deck, extend south-east ground level deck, construct
north-west ground level deck and roof, construct front boundary brush privacy fence,
minor alterations to building windows & doors — 1999/982963 (12592 DA) — Approved 1
September 2006

+ Request for Removal of Trees — 12592 DA — Approved 9 March 2007
At a meeting with Council Officers dated 16 January 2007, Neil Blamey mentioned that he did not

consider the constructed works with relation to the ‘Changes’ application were in accordance with the
approved plans. Council's further direction with regard to this items of non-compliance is requested, as

SUNSHINE COAST OFFICE GYMPIE OFFICE
1/189 GYMPIE TERRACE, NOOSAVILLE | PO BOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE | PO BOX 391 GYMPIE GQ 4570
TELEPHONE !{ 0754555425 FACSIMILE | 07 54555725 TELEPHONE | 0754827440 FACSIMILE | 07 5482 4952

[email protected] [email protected]

Page 11

@ Page 2

based upon a visual survey of the development, it appears that the lower level deck complies with the
conditions of approval.

Nei! Blamey also noted that the ‘Driveway & Access’ Operational Works application required as part of
these conditions of approval had not been lodged. Please note that this application represents
compliance with this condition.

THE DEVELOPMENT APPLICATION

This application seeks a Development Permit for Operational Works — Landscaping, Earthworks and
Access & Frontage Works. It is sought to undertake the following work:
« Remove the existing 9m? pool located to the north of the existing dwelling;
+ Extend the northern deck towards the Bayview Road frontage by approximately 16.5m?;
+ Reconstruct the retaining wall located to the east of the existing dwelling to improve the
stability and stormwater management of the upper levels of the site. Correspondence
from Rienmac Pty Ltd detailing their recent findings regarding this structures stability is
included as Attachment 2;
+ Construct an infinity edge pool and associated overflow troughs, decks, stairs, spa and
day bed to the east of the existing dwelling:
* — Installation of three (3) above ground rainwater tanks in the south eastern corner of the
site;
+ Undertake significant landscaping works across the site to improve the movement of
surface water, buffer the visual impacts of the proposal and comply with conditions of
the previous Request for Removal of Trees.

Architectural and Landscaping Plans detailing the proposed works are included as Attachments 3 and 4.

The applicant advises that an Engineering Design and details with regard to slope stability and stormwater
run-off will be forwarded shortly. It is noted that Ashley Davey (Golder & Associates), Reinhold Koenning
(Construction Hydraulics) and Peter Rienecker (Rienmac Pty Ltd) are undertaking the preparation of this
documentation.

Further, the project builder Gordon Clements is currently preparing details with regard to construction methods
and access routes for construction equipment to the site. This will be forwarded upon completion.

Please contact our office if you require any further information and/or clarification with respect to the above
application.

Yours sincerely

JRO

Hannah Blue
Senior Planner
Martoo Consulting Pty. Ltd.

Page 12

@ Page3

Attachments

 

Attachment 1 — Location Map

 
  
    
 

   

A.

REeriyr + Xe \
30 MAP anny bs}

Batig: ~

  
   
  

Page 13

L
Lott State of Queensland.

 

 

 

TOWN PLANNERS
ma rtoo ml DEVELOPMENT CONSULTANTS
Consulting ™ URBAN DESIGNERS

Proposed Operational Works located at 20 Bayview Road, Noosa
Heads : Thomas Muster

LOCATION MAP

PLANNING ASSESSMENT REPORT

 

 

 

FILE NAME> LOCATION MAP DATE> March 2007
JOBNO> 00656 AMENDED> N/A
SCALE > “see above” VERSION> = 1.0

 

SOURCE> NOOSA SHIRE COUNCIL FIGURE if

Page 14

@ Page 4

Attachments

 

Attachment 2 — Correspondence from Rienmac Pty Ltd

Page 15

61 7 54441153
25/10/2086 11:36 61-7-544411598 RIENMAT-S COAST PAGE Gt

SUNSHINE COAST OFFICE:
SUITE 5, FIRST FLOGA,

  

CNR. ELANORA OR & BA LANE o.,
Bien AG perv rp Ca eae OLD. 8887
A.C.N. 040 866 430 TELEPHONE: (07) 5478 2500
A.O.N. $2 010 665 430 FAX: (07) $444 1158
E-MAIL: rlanmac@hotkey. not. av
“KER RO. BOX 143
MIE. Aust CONSULTING ENGINEERS 1
AL. RIENECKER 3E MIE. net CIVIL AND STRUCTURAL MOOLOOLABA, QLO. 4557
25 October, 2006
The Manager
Calty Constructions Pty Lid
PO Box 926

MAROOCHYDORE QLD 4558

 

ATTENTION: GORDON CLEMENTS
Dear Sir,

- “SIDENCE AT 20 BAYVIEW DRIVE, LITTLE COVE FOR MUSTER,
a.ef No, 262141

At your request, an Engineer from this office visited the above site on the 20 Cictober, 2006. The purpose of thy
visit was to offer advice on the stability of a boulder retaining wall to the soutt: west of the existing residesice

The boulder wall was adjacent an existing deck of the residence and was 2 to 3m high at some locations. ‘The
wall was of typical boulder wall construction with large boulders placed one on top of the other. We consider
for a wall of this height constructed with free draining material behind, and built with a | in 4 lean back inte the
cut. the base rocks should be minimum of 1100mm wide and embedded a minimum of 400mm into the ground.
‘That is, the front of the wall should have a minimum of 400mm depth of sound competent material or concrete
above the base of the rock to prevent the wall sliding.

In many cases. this wall had no material in front of the rocks and in fact some of the material had been washed
away from in front of the wall leaving the boulders perched out of the ground.

We consider this wall requires urgent repair work to ensure the stability of the wall. Because of limited access,
this work will be quite difficult. To construct a concrete toe (or similar) in front of the wall socketed inte roch

prevent the wall sliding, would be extremely difficult due to the depth at which rock is likely to be
-gcountered, the closeness of the wall to the existing structure and the Jimited access to the area.

We consider the most effective solution to the problen) would be to reconstruct the wall as a series of temuces
away from the existing residence. The existing boulder wall would be removed and this area benched ont tame
to give adequaie working space to allow a new boulder wall to be constructed. To reduce the height of this w.
a further ane ar two walls may he constricted as a terrace situation with each wall set back suffice: :
not to surcharge the lawer wall. If this is the solution to be adopted, survey information te obiah. accurabe
levels is required and svils information to design the wall.

  

 

We consider this wall requires urgent attention. If you wish to discuss any of the above matters do not hesitate
to contact us.

Yours faithfully. .
PETER RIENECKER

2621.41 -Muster Pays Loe |

 

OFFICE LOCATION: SUNSHINE COAST GOLD COAST

Page 16

@ Page5

Attachments

 

Attachment 3 — Architectural Plans

 

Page 17

BAYVIEW

 
     
     
   
 

   
 

  

~

0

poo
\
i

   

  

0)

 
  

ryt m | Tl

existing

   

existing residence

existing driveway

ooo
G

920

91.0

90.0

 

che
r

A

 

\

Thomas Muster New Pool & Landscaping Works Gordon Clements site plan DA l 441 [

 

 

 

 

 

 

 

 

N

NS

\

20 Bayveiw, Noosa Heads, QLD. m: 0402 799 467 sketch design

 

 

 

 

 

Page 18

“s /
new pond

   

wae

 

 

 

 

 

 

 

 

 

ORS, OMEN SB te My et

 
   

 

 

 

existing residence

 

  

existing driveway

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

new seat and stone wall

 

bin and gas bottle store relocated

 

 

 

 

Thomas Muster New Pool & Landscaping Works Gordon Clements lower ground floor plan DA | 41.2 CE ve z + = =
bs Mar 2007 1:100

pais
C | CG {I 20 Bayvelw, Noosa Heads, QLD. m: 0402 799 467 sketch design t

 

 

 

 

 

 

 

 

 

 

 

 

Page 19

     
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

r

    

ul

    

i

      

lil

a ble

 

  

a il li ;

 

 

 
    

    

   

i ia

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| ti

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ii

 

 

 

 

 

 

 

 

 

Py
if |

Vi Me A a
. rd
13300

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 800
“yo ina thes VY
1
/
J,
a |
Latil allel):
| j
PAH IE Ws
| ! | SHIVA, TE
ili HMA AIT; i
| t ‘
H 1 existing poo!
1 ; new built in seating

 

 

  

 

  

 

existing residence

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 20

° ~
nny
~ Was.

   
    
    
 

TL

   
    

      
  

      
  

 

      
  

        

         
 

   

   

 
  

      

    

 

 

Me 3 i. ive
! 1 iis ‘i ft i vn

Page 21

 
   
     
     
   
   
   
 
 

$T1 Stone Cladding - dark slate to match existing
ST 2 Stone Cladding - 'telldstone’ brown / grey

Stone Cladding - pool & pands - grey / green

  

ST3
Frameless Glass - poo! fences and balustrades
Titanium Zinc - dark grey

Timber Battens / Boards - olled deep brown

 
 
 
  

   
  
 

_ Fh nme eee fa ageceeeg - SEI} 1
; ; waved |

fe.

lip

Jyh

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

t ———

Thomas Muster New Pool & Landscaping Works Gordon Clements. north elevation DA I 24 [ E TOME iat 7 st t

r F
@ =, |! \ 20 Bayvelw, Noosa Heads, QLD. m: 0402 799 467 sketch design Ds Mar 2007 1:100
\ IS °) — — _——— —— :

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 22

legend

ST1 Stone Cladding - dark slate to mateh existing

ST2 Stone Cladding - ‘telldstone’ brown / grey

 

ST3 Stone Cladding - pool & ponds - grey / green

    
 
   

Frameless Glass - pool fences and balustrades

Titanium Zinc - dark grey

Timber Battens / Boards - alled deep brown

 

BOUNDARY LINE

 
  
   

ee
= 3
Bo
|

7 =z

    

 

 

 

 

Thomas Muster New Pool & Landscaping Works Gorden Clements west olevation DA l 22 L. I foo

= y
¢ S ( 20 Gayvelw, Noosa Heads, QLD. rm: 0402 799 467 sketch design os | Marzoo7 | 1:100
= . ; 5 -

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 23

$T1 Stone Cladding - dark stats to mateh existing

$T2 Stone Cladding - 'telldstone' brown / grey

ST. Stone Cladding - pool & ponds - grey / green

Frameless Glass - pool tences and balustrades

Titantum Zine - dark grey

Timber Battans / Boards - oiled deep brown

 

a

 

 

 

|

i
S
~

Thomas Muster New Poot & Landscaping Works Gordon Clements south etevation ca | 23 | SS a
20 Bayvelw, Noosa Heads, QLD. m: 0402 789 467 Bkatch design os Mar 2007 100 e)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 24

ST 1 Stone Cladding - dark state to match existing

 

ST2 Stone Cladding - ‘telldstone’ brown / grey

ST3 Stone Cladding - poot & ponds - grey /green
Frameless Glass - pool fences and balustades
‘Titanium Zine - dark grey

‘Timber Battens / Boards - olled deap brown

 

%
%
G.

a

    

 

 

 

 

 

 

 

 

 

 

     

 

 

ST2 12

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

canasqpeno co

2 =S st = ant “ seers
oS \
. | ~ | i
eS /; i f

 

   
  
  
 
 

 

 

 

 

 

 

 

 

 

 

 

goechoocanagpac! |:

HN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘ |

|
i

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

il

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

i

 

—

 

 

section a ee ee =

| Thomas Muster New Poo! & Landacaping Works Gordon Clements oo E
iy 7 ;
1 0402 799 467 sketch design Os | Marzoor | 1:100 L e)
. . Ep }

C- { r S a) 20 Bayvelw, Noosa Heads, QLD.
! — Ad - ? » OF noe ors

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 25

ST1 Stone Cladding - dark state to match existing

ST 2 Stone Cladding - ‘elldstone' brown / grey

ST3. Stone Cladding - pool & ponds - grey / green
Frameless Glass - pool fences and balustrades
Titanium Zinc - dark grey

‘Timber Battens / Boards - oiled deep brown

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

= Thomas Muster

 

 

 

 

 

 

 

 

 

 

C CS S) TT 20 Beye, Nooss Heads, OL0-

oe ne

New Pool & Landscaping Works Gordon Clements section b pa | 32 | ee ; —_—
m: 0402 799 487 sketch design lps Mar 2007 4:100
: a

 

 

 

 

Page 26

legend

$T1 Stone Cladding - dark slate to match existing

ST 2. Stone Cladding - ‘felidstone’ brown / grey

ST3 Stone Cladding - poo! & ponds - grey /green
Frameless Glass - poal fences and balustades
‘Tianium Zinc - dark grey

Timber Battens / Boards - olled deep brown

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 Thomas Muster

 

New Pool & Landscaping Works.

sections

— EES SS SS

 

 

20 Bayveiw, Noosa Heads, QLD.

 

 

 

sketch design

 

 

 

 

 

 

 

 

CS
5

DS | _Mar2007 [1:00
=

 

 

 

 

Page 27

20 BAYVIEW, NOOSA HE

MUSTER RESIDENCE
20 BAYVIEW, NOOSA HEADS

 

 

 

 

 

m0),

 

Page 28

20 BAYVIEW, NOOSA HEADS QLD

LANDSCAPE DESIGN INTENT

The Viridian Noosa landscape development adjacent to this site focuses on
reinforcement of native species and rehabilitation of the natural landscape
setting. As an extension of this, the landscape soft works around the existing
residence and proposed pool design for 20 Bayview, Noosa Heads has
derived from species that have been selected from the approved Viridian plant
lists. (Refer Approved Plant Schedules).

The aim of the planting design will be in keeping with the overall themes
established in the neighbouring Noosa developments. It is mindful of

the views through to the bay, sight lines from the road plus to and from
neighbouring properties. There is a reliance on large screening shrubs and
detailed rainforest planting at ground level to sympathise with the adjacent
national park, and provide an attractive backdrop for the private recreational
environment.

THE LANDSCAPE DESIGN INTENT AIMS:

{] To use plant species preferred and approved by Noosa Shire Council

{| To use natural materials such as timber and rock in the construction of
landscape treatments

To screen impacts of the built form on the landscape
{] To reinforce the natural rainforest vegetation themes of the site

In conclusion development of a rainforest setting to the new built form of

the proposed site provides an excellent opportunity in keeping with the
established Noosa character. The proposed landscape treatment responds to
the sloping site by providing dense understorey planting around and through
the site, binding the soil and preventing potential erosion, while creating a
lush setting of rainforest shrubs, groundcovers and climbers, combined with a
backdrop of native trees and palms.

Tree and palm species have been selectively used to accentuate the character
of the re-established environment, while framing views down the valley and
providing shade and shelter.

 

LANDSCAPE DESIGN

 

LANDSCAPE DESIGN PRINCIPLES

 

 

 

Page 29

  

 

20 BAY VIEW, NOOSA HEADS OLD LANDSCAPE CONCEPT PLAN

 

 
   
     
   
     
     
     
     
     
 
   

I LEGEND

EXISTING TREES TO BE RETAINED

ENTRY PAVEMENT BY ARCHITECT

LOW SHRUBS

SMALL SCREENING TREES TO BOUNDARY
STORM WATER DRAINAGE ROCK SWALE

STORM WATER COLLECTION/TREATMENT POINT

LARGE SCREENING TREES TO WATERTANKS

Ta T7m™M™oOO WD DY

LOW DENSITY GROUND COVERS AND
BOULDERS TO BANK STABILISATION

| UNDERSTOREY PLANTING TO MATCH EXISTING

 

J GROUND COVERS AND VINES TO RETAINING
BANKS

 

os i" , K ROCK RETAINING AND STORM WATER
si STABILIZATION

¥ L TALL SCREENING SHRUBS TOTOP OF PROPERTY
\ : BOUNDARY

M BRUSH FENCING TO NORTHERN PROPERTY
BOUNDARY

N POOL FENCINGTO EASTERN PROPERTY
BOUNDARY

SECTION CUT

 

CONCEPT PLAN

Page 30

 

20 BAYVIEW, NOOSA HEADS QLD LANDSCAPE DESIGN PRINCIPLES

EXISTING NATIONAL
PARK VEGETATION

 

 

LOW DENSITY GROUND COVERS AND € ay
BOULDERS TO BANK STABILISATION i

 

SCREENING TREES AND SHRUBSTO
WATER TANKS AND BOUNDARY

 

@ SCREENING SHRUBS AND WALL
FENCING TO PROPERTY BOUNDARY

 

     
 

LOW DENSITY SHRUBS

 

ROCK RETAINING AND STORM
WATER STABILIZATION

  

SECTION A-A | Lucu a

Page 31

   
 
 
 
 
 
 
 
 
 
 
 
   
    

20 BAYVIEW. NOOSA HEADS QLD

EXISTING NATIONAL
PARK VEGETATION

 

LOW DENSITY GROUND COVERS AND
BOULDERSTO BANK STABILISATION

 

SCREENING TREES AND SHRUBS TO
WATER TANKS AND BOUNDARY

SCREENING SHRUBS TO WALL
FENCING AND PROPERTY BOUNDARY

LOW DENSITY SHRUBS

poo! equipment
/ store Wi

 

 

   

SECTION B-B

 

Page 32

20 BAYVIEW, NOOSA HEADS QLD

 

 

PROPOSED SPECIES LIST - RAINFOREST THEME
Paz 9S o

UPPERSTOREY / TREES
Alphitonia excelsa
Araucaria cunninghamii

Archontophoenix cunninghamiana

Castanospermum australe
Cryptocarya glaucesens
Diospyros pentamera
Elaeocarpus eumundi
Elaeocarpus grandis
Flindersia schottiana
Gmelina leichhardtii
Harpullia pendula
Macadamia integrifolia
Macaranga tanarius
Mallotus phillipensis
Melicope elleryana
Polyscias elegans
Sterculia quadrifida
Syzygium francisii
Waterhousea floribunda

MIDDLESTOREY / SHRUBS
Acronychia imperforata
Acronychia oblongifolia
Acmena hemilampra
Acmena smithii
Alectryon coriaceus
Alpinia caerulea
Backhousia citriodora
Backhousia myrtifolia
Breynia oblongifolia
Commersonia bartramii
Cyathea cooperi
Denhamia celastroides
Glochidion ferdinandi
Glochidion sumatranum
Guioa semiglauca
Homalanthus nutans
Neolitsea dealbata
Pittosporum revolutum
Rhodamnia acuminata
Synoum glandulosum
Syzygium leuhmanii
Syzygium oleosum
Tasmannia incipida
Wilkea macrophylla

Red ash

Hoop pine
Bangalow palm
Black bean
Jackwood

Eumundi quandong
Blue Quandong
Cudgerie

White Beech
Tulip wood

Qld macadamia
Macaranga
Kamala

Butterfly tree
Celery wood
Peanut tree
Giant water gum
Weeping Lillypilly

beach acronychia
common acronychia
Broad leaf lilly pilly
lilly pilly

Beach birds eye
Native ginger
Lemon Myrtle
Sweet Carrol

Brown kurrajong
Tree fern

Orange boxwood
Cheese tree
Umbrella cheese tree
guioa

Bleeding heart

White bolly gum

scentless rosewood
Riberry

Blue Lillypilly
Pepper bush

 

LANDSCAPE DESIGN PRINCIPLES

UNDERSTOREY / GRASSES & GROUNDCOVERS

Adiantum hispidulum
Asplenium australasicum
Blechnum cartaligineum
Cordyline rubra
Dianella caerula

Doodia aspera

Gahnia aspera
Lomandra multiflora
Lomandra longifolia
Platycerium bifurcatum
Platycerium superbum

VINES
Aristolochia praevenosa

Austrosteenisia blackii
Cissus antarctica
Cissus hypoglauca
Hibbertia scandens
Hoya australis
Pandorea jasminoides
Pandorea jasminoides
Stephania japonica

 

Maiden hair fern
Bird's nest fern
Fishbone water fern
Palm lily

Blue Flax Lily

red fruit saw hedge
Many Flowered matrush
Long Leafed (matrush)
Elkhorn

Staghorn

Richmond Birdwing
Butterfly vine

Kangaroo Vine

Guinea Flower
Wax flower
Bower Vine
Bower of beauty
Snake vine

 

 

 

Page 33

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5 Boo NOOSA COUNCIL
noe PAYMENT REQUEST FORM Creditor No.
Supporting documentation must be attached for all payments
If a requisition for purchase order has been done DO NOT USE THIS FORM.
PAY TO:
(Max 40 Spaces) | YVastoe Cornrsnttive Affe
ADDRESS: P J
(2 lines only) ic & me [LoS
tT
MOOS 4 POSTCODE: (p+75/
TYPE OF PAYMENT — Please tick appropriate box
GY REFUND QO) __ REIMBURSEMENT (FBT form may be required)
Q) TRUST BOND RELEASE OQ _ponation
OQ crants Oswestry clam
OQ) _ SUPERANNUATION PAYMENT (PAYROLL USE ONLY) OQ) Lecats REQUEST
1 CONFERENCE REGISTRATION , O) PERFORMANCE PAYMENTS
QO) EMPLOYEE DEDUCTIONS (PAYROLL USE ONLY) O) OTHER (AS SPECIFIED)

 

 

 

GST Details — Please tick the appropriate box if a
ABN holder. ifyes, ABN #:

Os Registered for Gst

EBT DETAILS — Please indicate if applicable
Q

licabie (See procedures for more information’

Fringe Benefits Tax Declaration is required and is attached with a photocopy of receipt

DESCRIPTION OF PAYMENT TO APPEAR ON CUSTOMER REMITTANCE — Maximum 40 characte!
Relea! Lele elelab Melt [ole] EEL sl i2lel Ip fake L ek lel

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INVOICE/DOCUMENT REF (oh [A7eke ly] | TT
Ledger Number GL Namative
GST Amount (Description., Receipt No., Property No. etc)
$
clele “I7le a iyo Race ODF)
Total Payment t YO

 

 

 

| certify that the artkles and/or services charged in the attached and/or detailed above wera
satisfactorily performed and according to an agreement with the above named AND that they
were necassarity required for counci! AND that the charges were fair and reasonable OR that
appropriate authorisation for this payment has been received by me in accordance with council's
established procedures.

SIGNATURE OF REQUESTING OFFICER

DATE: _/ L

 

 

T certify that this payment is being made in accordance with the established payment
procedures of the council and In accordance with the requirements af the Local Government
Act and that such payment is in accordance with the adopted budget of council and that the
authorisation of this payment is In accordance with my delegated authority Iimit.

SIGNATURE OF AUTHORISED OFFERS

pare: Ut dé 1)

 

PRINT NAME OF REQUESTING OFFICER

PRINT NAME OF AUTHORISED OFFICER

 

Instruction to AP Team

 

 

{Ss Aw eoensyy

Hold Cheque for:

Post Cheque: Yes/ No

 

(Please refer to Accounts Payable Procedures doc. to ensure correct use of form)

 

 

Page 34

5

 

 

LAND USE SECTION FEES

RECEIPT TYPE

 

 

 

 

 

 

 

SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
, Material Change of Use - Code/Impact :
Consistent §21
Inconsistent §21
- Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
Extension of a Currency Period . 521
Operational Works - Landscaping PEO Ite 521
Bldg Work assessable against the Planning Scheme 521
P ODGEMENT REVIEW
Half Hour §22
One Hour 522
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee 524
"Jetty Bond 51
(Category 4)
BONDS :
Performance Bond 51
(Category 9)
SIGNS
Registration Fee 222
SEARCH FEE .
Search of Land Use Section'Tile 112
@ Liquor Licensing Request 113
TOTAL. $ GSO jl2,5
NAME: (Martes  Conrccanthia
ADDRESS: fo feo (Lo Pp Z
Nessauthe Le-S
FILENO: 07 / OGoy DATE:  3(U4{o7)
v ~ F
RECEIPT NO: ZR2FFl Signature of TP Officer: _/ .) Gran
AUTHORITY NO: J)

 

(¢/ F207 | Cort {

Page 35

 

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

Page 36

ne BNRoLokcy.

[ APPLICATION DETAILS

| Payee Name:

 

DEVELOP,
(Cashier: Ple

NT FEES & CONTRIBUTIONS e@
Retum to Admin Officer, Development)

BONDS

 

Bond Refund Details

 

Address:

 

Development Location:

 

Date application properly made:
File Numbers or Reference:

Receipt Date:

 

Receipt No: 2427 1 .

APPLICATION AND GENERAL FEES

AMOUNT | RECEIPT TYPE

Payee Name:

   

Address:

 

   
  
 

Security Deposits/Performance/Maintenance/Uncompleted
Works Bond

CONTRIBUTIONS

 

 

Application Fees

 

 
 

 

Road / Drainage Plan Exam

  

 

 

 

  

 

 

  

 

 

Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
| CALCULATIONS

 

549

 

Lot Calculation

 

Plan Examination Calculation

 

 

 

Inspection Calculation .
| Total of Fees Paid (Excluding Bonds)

_|s

P-/Land DevelopmentFEES & CONTRIBUTIONS/IDEVELOPMENT FEES.doc

540 Developer Contribution - Landscaping ~
X50 $41 Developer Contribution - Road Other

Road / Drainage Field Inspection 310 642 Developer Contribution - Drainage Other
Legal Document Examination 543 Developer Contribution - Pathway Other
Sealing Fee - Survey Plans, Legal Documents _ 544 Developer Contribution — In Lieu of Off St Parking (PSP13)
Sale of Documents, Policy Lists, Misc 545 Developer Contribution - Other Parks and Community
Bonding Admin Fee (Contributions, uncompleted works} 546 ICS ~ Sewerage (Rural)

588 ICS - Sewerage (Coastal)

ICS - Sewerage — South Peregian (Maroochy)

 
    
 

  
   

AMOUNT

   
  
 
 

 

ICS - Sport and Recreation Land
ICS - Community Land

(CS raoge | i
ICS — Road 583
ICS - Pathway

ICS ~ Public Transport
ICS ~ Water Supply

 

 

 
 
 
  

RECEIPT TYPE

51 (Cat 9)

   

  

RECEIPT TYPE

 
 
    

 

 

R ONS

Catchment:

 

Road/Section:

Used in these records

About this file

File size
6.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0604 - Operational Works - Landscaping, Earthworks, Access & Frontage [As Published].pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.