\\co INTEGRATED PLANING ACT 1997

. ‘Version 19.0, 2 March 2007

     

IDAS Assessment

Checklist

(Formerly the “Referrals Checklist’)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

4. This checklist was formed refered to 2s the "Reterrats Checkiat". Some of the ‘Guides’ to using the (DAS Application Farms continue to refer to this document 2s tha
*Rolerrals Checklist’, The namo of this checMist was changed from 25 July 2005 lo more acourataty describe ks function.

2. Undesthe IPA and IDAS framework, an application may require assessment by the local Councd andlor cortzin Queenstand Stats entiies (2.9. Environmental Protection
‘Agangy, Dept. of Natural Resources and Watar, Queensland Herilage Council etc.)

s

‘This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entty and may also assis! the applicant to

determine the assessment manager for the application,

PN mae

“Therefore, tha completion of all questions in saction 4 cf this checklat ia mandatory for al appicallons (other than thase raquiing the completion of Parts A & B anty).
tis the responsiblity ofthe applicant to accurately complete thie chectdtst,

Section 2 is mandatory only ithe proposed development is located in any part ofa wid rivar area declared under the Wid Rivers Act 2005.

Depending on the nature of the application, an applicable Stale enity may be ether the assessment manager or an IDAS referral agency ‘or the application.

The assessment manager cr the application wil rely on the information provided inthis chocklis! (as well as any material lodged in support af the application) io identity

ary applicable referral agenolas for the application in the Acknowledgement Notice, The asssasmenl manager wit also rely on this information when identifying if Ube

application triggers referral coosdination?.

9, To assis! you in answaring the folowing questions a sarles of guides are avaliable free from the IPA wabsite www.ipa.cl1.gov.au Guide 25 explains the role of the IDAS
Assessment Chactis! In the IDAS application process, and Its relationship to the Form 1 development application.

10, ‘Any other parts of For ¢ thal this chacklis! raquiras lo be complaled are avaiable from the Counal or the applicable State entity, or can be downloaded free fom
wwe ipaaid qoy.oy,

11. Section 3 provides advice about the ceferrals that can be caquired for apptications for building work assessable agains! the Building Regutution 2006.

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The foflowing siate assassment triggars apply to development ather than for bulding work assessable against the Building Regulation 2006.

Environmentally relevant activity
For more information rater to Guide 4,
LUnloss you enswored ‘none of tho above’ to 1,
the applicaion requires sssessinant by Ihe

oe _

‘Note: An application involving ERA 19 andr 20
wi leo require carmplatn of Part Ky of For 4
for approved where an aocation under Ko Weer]

 

‘Act 2000s roquired.

1,

The application involves: (tick applicable boxtes)

(1) an environmentally relevant activity (ERA) for which a code for environmentat compliance
has not been made - conplete Part G of Fonn 1

(C1 @® amobite or temporary ERA for which a code of environmental compliance has not been
Made - complete Part G of Form 1

] (ii) none of the above

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the

completed IDAS Assessment Chocklist (if applicable).

 

OFFICE USE ONLY (applicable to ossessment manager)

 

[__ DATE RECEIVED

 

|__ REFERENCE NUMBERS

 

 

1. The eseeserant manager ia ceaparmibla or ansesaing ond deciding an IDAS sogicalion. The amsariment manager for an epplcaton ie proscnbodin schedkée 8A dle PA.
2. For edsiicna ictrrnaion rebar to Guide 8 Does my application tgper Oe refer! coonination process?
The ‘edhiniterng au only may be ether the Environmental Proacicn Agency, the retovant local goverment (orm devatved ERA} or the Queensland Departnant of Primary tndeutries and

Fiaherion (he © delogaied ERA),

Paget

 

   
   
 
   

INTEGRATED, an. 1997

State-controlled road matters
For more information star bo Guide 3.
Unless you answerad ‘none ofthe abows' ta 02,
tte epplcaion tiggare refer tothe Departmen

{n certain creumstonces DMR wil be an adkioe
gency, wtiin ober Graumetances DMR wi
be a concuranos agency.

‘Schedule 2of tha IP Ragulaton wal assis! you bo
dolorrine whers DUR is an advice or

‘concurrence agenoy lor the applcafin

IDAS Assossmont Chackist, Version 19.0, 2 March 2007
2. The application involves: (tick appicate boxes)
(C1) development on land contiguous" to a State controlled road and for -
(] (a) material change of use assessable against the planning schema;
0 ) reconfiguring a fot unless -
« the total number of lots Is not increased; and
« the total number of lots abutting the State-controlled road is nol increased;
C1 (c) operationat work (not associated with a matesial change of use assessable against tha
planning scheme or reconfiguring a lat mentioned in {b) above)-
+ associated with accass to a State-controlied road; or
«for filing or excavation; or
+ involving the redirection or intensification of sita stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
‘State-controlied road.
Df development on land not contiguous to a State-controlled road and -
O @@) material change of use -
assessable against the local government's planning scheme; and
© mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
0) reconfiguring 2 tot for a purpose mentioned in schedule 5 of tha IP regulation
and exceeding the thresholds set by that schedule;
O(c) operational work (not associated with a material change of use assessatve against the
planning scheme or reconfiguring a lol mentioned in (b) above}
+ assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the [P Regulation and excesding the thrasholds set by
that schedule.
EX1(il) none of the above

 

 

 

 

Clearing vegetation

For mone information rer to Guide 12.
Uniess you answered ‘none of the above" to 03,
‘he application requires ssvessment by the
(Deparment of Natural Resources and Water
(NRW).

{tan agency olhor than HRW is fhe assossmont
‘manager for the appcation, NRW is @
‘concusrence agency for ho application in retaon|
bis mater,

you icked 0349 oF (2), your application raquires|

3. The application involves: (ck applicable box'es)
oOo material change of use -
(a) assessable against the planning scheme;
(b) on alot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegatation; or
* if there is no property map of assessable vegetation for the lat - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
{d)_ where the size of the land is 2 hectares or larger - complete Part Jof Form 1

 

 

 

 

 

 

 

 

‘efaral to NRW for assecsment cogardiess of (i) reconfiguring a tot -
\whother vegetation clang is propocad
" ant (a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration Is 2 hectares or larger,
{c} where 2 or more lots are created; and
(GQ where the size of any tot created is 25 hectares or smaller . complote Part J of Form 1
COG) operationat work -
(a) for the Gearing of native vegetation where the vegatation clearing Is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) of reconfiguring a lot mentioned in (ii) - compete Part J of
For 4
Ef) none of the above.
‘Strategic port land 4. The application involves:
For more information rotor to Guide. devel .
Hyataadfh. be Pot Autocly obe a ey opment on strategic port land as defined In the Transport infrastructure Act 1994 (T1
‘sssesament manager for fhe applicator. complete
Hyou ficked (7) Queensiand Transports 3 0 @ a material change of use that is inconsistent with the land use plan approved under the
‘coneurrance agency for the application. Tl Act for the strategic port land - complete Part t of Foon 7

1 Gil) none of the above

 

 

4 Land contiguous 1 2 State-convoled med is detined in schedule 14 of he IP Ragefuton to meen land -é part d he lend is within 100m of te Stee conictied road; or hat w partota hae Sisto
ed.

contrfied

Page?

Used in these records

About this file

File size
6.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0604 - Operational Works - Landscaping, Earthworks, Access & Frontage [As Published].pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.