localised decrease in groundwater level beneath
5 Conclusions
the development footprint as a result of reduced
groundwater recharge. No offsite impacts are
5.1 Earthworks phase groundwater predicted by the groundwater model.
impacts It is important to note that the benefits of
Groundwater impacts during the construction groundwater recharge from the outflows of the
phase are limited to the impacts of groundwater stormwater treatment devices have not been
drawdown during trenching/excavation works. The included in the groundwater model. The results
results of this assessment indicate that where presented in this report therefore represent the
groundwater drawdown occurs, the extent will be predicted maximum decrease in groundwater
within the range of 20m to 1,281 m. level as a result of the development.
The larger drawdown extents are predicted to Activities and/or land uses likely to impact on
occur in areas of the site where Tenosols (sandy groundwater quality such as onsite effluent
soils) have been identified. The occurrence of disposal or industrial activities are not proposed
Tenosols within the development area is shown for the Noosa on Weyba development.
on Drawing NO.1 0838.3. Operational phase impacts to groundwater quality
are therefore not anticipated.
Whilst Hooghoudt’s equation predicts the lateral
extent of drawdown to be up to 1,281 m in these 5.3 Predicted impacts for sensitive
soil types, in reality, the true extent of drawdown receivers
will be limited to the extent of this soil type.
The effect of groundwater drawdown has the
Instances of groundwater drawdown are unlikely potential to impact on sensitive receivers such as
to be prolonged with excavations such as services the identified ecological communities located
trenches excavated and backfilled on a throughout and adjacent to the development site.
For the Noosa on Weyba development,
progressive basis.
groundwater drawdown is limited to the
The extent of groundwater drawdown calculated earthworks phase of the development and is
in this report is based on a scenario where no unlikely to occur for prolonged periods of time.
mitigation measures are in place. Implementation
of mitigation measures such as those described in At this stage of the development proposal, the
the attached Groundwater Management Plan will exact location of services trenches is unknown.
Should these be proposed for areas adjacent to
substantially reduce the level of groundwater
drawdown likely to be experienced at the site. sensitive receiving environments, mitigation
measures such as those proposed in the attached
Disturbance of acid sulfate soil through excavation Groundwater Management Plan should be
and/or groundwater drawdown has the potential to implemented.
impact upon groundwater quality if appropriate
management techniques are not implemented. To 5.4 Sea level rise
preventlminimise groundwater quality impacts Groundwater levels within the development site
during the earthworks phase of the development, are not predicted to increase as a result of sea
works should be undertaken in accordance with a
level rise. Any groundwater level changes
site specific Acid Sulfate Soils Management Plan.
predicted by the conceptual model are contained
within the immediate vicinity of Lake Weyba and
5.2 Operational phase groundwater the associated tributaries.
impacts
Groundwater impacts during the operational This low level of impact is largely as a result of the
phase of the development are limited to a clayey soils encountered on-site.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.