Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208

of 103

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

www.ac    ss.gs                                                                           +GILEEHI
                                                                                        SUT1-ERJ.AN)



                                                       localised decrease in groundwater level beneath
5          Conclusions
                                                       the development footprint as a result of reduced

                                                       groundwater recharge. No offsite impacts are
5.1      Earthworks phase groundwater                  predicted by the groundwater model.

         impacts                                       It is important to note that the benefits of

Groundwater impacts during the construction            groundwater recharge from the outflows of the
phase are limited to the impacts of groundwater        stormwater treatment devices have not been

drawdown during trenching/excavation works. The        included in the groundwater model. The results

results of this assessment indicate that where         presented in this report therefore represent the
groundwater drawdown occurs, the extent will be        predicted maximum decrease in groundwater
within the range of 20m to 1,281 m.                    level as a result of the development.


The larger drawdown extents are predicted to           Activities and/or land uses likely to impact on

occur in areas of the site where Tenosols     (sandy   groundwater quality such as onsite effluent
soils) have been identified. The occurrence of         disposal or industrial activities are not proposed
Tenosols within the development area is shown          for the Noosa on Weyba development.

on   Drawing NO.1 0838.3.                              Operational phase impacts to groundwater quality
                                                       are therefore not anticipated.

Whilst Hooghoudt’s equation predicts the lateral
extent of drawdown to be up to 1,281 m in these        5.3    Predicted impacts for sensitive
soil types, in reality, the true extent of drawdown           receivers
will be limited to the extent of this soil type.
                                                       The effect of groundwater drawdown has the

Instances of groundwater drawdown are unlikely         potential to impact on sensitive receivers such as
to be prolonged with excavations such as services      the identified ecological communities located

trenches excavated and backfilled on a                 throughout and adjacent to the development site.
                                                       For the Noosa on Weyba development,
progressive basis.
                                                       groundwater drawdown is limited to the
The extent of groundwater drawdown calculated          earthworks phase of the development and is
in this report is based on a scenario where no         unlikely to occur for prolonged periods of time.
mitigation measures are in place. Implementation
of mitigation measures such as those described in      At this stage of the development proposal, the

the attached Groundwater Management Plan will          exact location of services trenches is unknown.

                                                       Should these be proposed for areas adjacent to
substantially reduce the level of groundwater
drawdown likely to be experienced at the site.         sensitive receiving environments, mitigation
                                                       measures such as those      proposed in the attached
Disturbance of acid sulfate soil through excavation    Groundwater Management Plan should be
and/or groundwater drawdown has the potential to       implemented.
impact upon groundwater quality if appropriate
management techniques are not implemented. To          5.4    Sea level rise
preventlminimise groundwater quality impacts           Groundwater levels within the development site
during the earthworks phase of the development,        are not   predicted to increase as a result of sea
works should be undertaken in accordance with a
                                                       level rise. Any groundwater level changes
site specific Acid Sulfate Soils Management Plan.
                                                       predicted by the conceptual model are contained
                                                       within the immediate vicinity of Lake Weyba and
5.2      Operational phase groundwater                 the associated tributaries.
         impacts
Groundwater impacts during the operational             This low level of impact is largely as a result of the

phase of the development are limited to a              clayey soils encountered on-site.




1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL     _
                                                                            GROUNDWATER ASSESSMENT          29

Used in these records

About this file

File size
60.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12_0208.pdf · 60.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.