Original source · versioned page text
Revised Proposal Plans
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 1-
04 OF
--- 07
120°48'20" 120°48'20"
EMT L 2m2 2.0
(SP 197517) 47.889 SITE AREA (LOT 1) 3037m2
124.17 123.82 123.76 123.46 123.46 123.22 122.95 122.77 122.56 122.31 AREA GROUND MEZZ
FLOOR FLOOR
2.0 123.59 123.17 EXISTING TENANCY 1 605.2m2 198.5m2
30°47'20" 123.93
LANDSCAPE122.89122.77
122.94 TENANCY 2 617.4m2 79.3m2
30°47'20"
124.26 2.829 122.47
BUFFER
10.001
123.45
255°48'30" 123.11 123 TOTAL 1222.6m2 277.8m2
124.11 122.82 476.4m2 122 GRAND TOTAL 1500.5m2
122.35
1 24
TOTAL SITE COVER 44.9% 1364.8m2
SPOON DRAIN 2.1m HIGH 1.8m HIGH 123.63 1.4m HIGH
TO 124.06 WALL
RETAINING RETAINING WALL Vegetation RETAINING WALL SPOON DRAIN
ENGINEERS 123.36
TO ENGINEERS TO ENGINEERS TO ENGINEERS TO ENGINEERS
DETAILS
124.17 124.17 124.12 DETAILS DETAILS Buffer DETAILS 123.19 DETAILS
122.60 LANDSCAPE REQUIRED 15.6 % 455.5m2
650
SPOON DRAIN TO ENGINEERS DETAILS
8.351 124.05 123.94 LANDSCAPE PROVIDED 20.4 % 622.2m2
123.14
300°47'
RETAINING WALL
122.80
TO ENGINEERS
650 EXISTING LANDSCAPE 476.4m2
2.1m HIGH
DETAILS
SPOON DRAIN TO ENGINEERS DETAILS
NEW LANDSCAPE 145.8m2
RETAINING WALL
123.03
TO ENGINEERS
123.50 123.32
0.7m HIGH
SPOON DRAIN TO ENGINEERS DETAILS
CAR PARKING REQUIRED 20
DETAILS
123.55
122.71 122.45 CAR PARKING PROVIDED 20
16.901 123.11 122.83
30°47'20" 123.33 123.173
12 MOTOR BIKES REQUIRED 7.5
121.89 121
122 121.86 121.83 MOTOR BIKES PROVIDED 8
RETAINING WALL
TO ENGINEERS
122.14 120.99
1.8m HIGH
122.31 121.93
DETAILS
1.8m HIGH CONCRETE BLOCK 121.76 120.84 BICYCLES REQUIRED 5
RETAINING WALL
120°47' 122.84
BICYCLES PROVIDED 5
8.12 ACCESSIBLE
121.95
121.82
121.78
121.74
SPOON DRAIN
AMENITIES 122.06
TO
ENGINEERS
DETAILS
TENANCY 1 TENANCY 2
1968
VAN MV
WC 605.2m2 617.4m2
SCREEN
1.8m HIGH CONCRETE BLOCK 123.00
3 .95
RETAINING WALL SF 122.09
920 FFL 121.70 FFL 121.70
°27'22
SHW 120.81
3x3m MIN POROUS PAVED
STAFF RECREATIONAL AREA
122.75
122 (confirmed by (confirmed by
121.89
(COVERED OUTDOOR TABLE & engineers) engineers)
0"
121.60
SPOON DRAIN TO ENGINEERS DETAILS
SEATING) 122.04
SCREEN
121.82 121.66 920
SHW 120.73
123.10 5# COVERED 121.75 SF
210°47'15"
BIKE ENTRY
(72.414)
WC 121.61
RACKS MV VAN
TAYLOR
123 121.78
ACCESSIBLE
1 AMENITIES
UP
1.3m HIGH CONCRETE
8# 2500L x 1500W
BLOCK RETAINING
MEZZ 2
SP324340
BIKE PARKS
PATH 121.89
MOTOR
(SLAB) 121.58 121.42
120.76
WALL
ADMIN AREA ADMIN AREA
121.64 79.3m2 UP
121
121.62 121.42
COURT
120.64
1500
ACCESS TO MOTOR 5555 RD GREEN WALL 5555 RD
BIKE PARKS 121.57
BOLLARD BOLLARD 15
5400L x 2400W 8
SPOON DRAIN
TO STAFF
ENGINEERS CARPARK 1 121.72
DETAILS 16
5400L x 2500W
5400L x 2400W 9
CARPARKS
TYPICAL
STAFF
MEZZ 1
EMT 97517)
CARPARK 2 121.43
(SP1
122.38 121.48 121.39 17
(SLAB) 120.66
5400L x 2500W
GREEN WALL
10
5400L x 2400W
CARPARKS
F 69
TYPICAL
STAFF
198.5m2
0"
CARPARK 3 120.56
6 Lorraine Avenue
3
22°28'4
2
122.22 18
m2
121.67 11
2 5400L x 2400W
122.17 121.48 Marcoola Beach, QLD, 4573
33.8
STAFF
CARPARK 4
LOT 1 07 5448 8500
04 OF 07 3037m2 12 19 [email protected]
5400L x 2400W
STAFF
121.63
www.buildingsuncoastgreen.com.au
CARPARK 5 QBCC Licence No. 65942
13 5400L x 2400W
3868 5400L x 2400W 121.52 20 STAFF
121.08
PROPOSED TO W AL
121.84 L STAFF
CARPARK 6
CARPARK
120.54
5400L x 2400W
LANDSCAPE
TO ROOF
SCREENED
3336 14 ACCESSIBLE 120.43
4735
5400L x 2400W BIN ENCLOSURE
CARPARK
145.8m2 34 0. TO121.65
ROOF STAFF
CARPARK 7
2# 2100 x 1500 & BIN
WASH DOWN AREA BK M
L
K
16.06.22
14.06.22
13.06.22
ELEVATION NOTES ADDED
REAR BUILDING ALTERED RFI
RP PLAN SITE BOUNDARIES ALTERED
SB
SB
SB
DJ
DJ
DJ
5400L x 2400W 1
2° 96
00
SHARED AREA BOLLARD 12 :0.3 P
Dia t:RC 120.51 J
H-I
06.06.22
21.04.22
RFI CHANGES
ADDED REVISED CIVILS
SB
SB
DJ
DJ
38 1 121.61 BK
Ma
lin
eo
nly
G
F
17.03.22
07.03.22
ADDED TOILETS MEZZ LEVEL
DEBBIES CHANGES
SB
SB
DJ
DJ
'15 E 04.03.22 CIVIL CHANGES SB DJ
" BK D
C
25.11.21
09.11.21
CLIENTS CHANGES
CONCEPT DWGS / 3D VIEWS
SB
SB
DJ
DJ
B 14.09.21 OPTION 3 SB DJ
34 13. EMT AD PROPOSED LINE OF A 24.08.21 SKETCH DRAWINGS SB DJ
BB
PROPOSED LINE OF
39
NEW CONCRETE
2° 06 Date Subject Auth
43
t
NEW CONCRETE Issue Initial
Em
38 1 268m2
32
Amendments
Emt BA
SP
AD
40
IL:119.36
'15 EXISTING
EXISTING Client PETER DONELAN
SP324339
43
Dia:0.150
t
Em
Mat:PVC-U IL:116.5 7
32
" Dia:0.150
SP
H Mat:PVC-U
M
DRIVEWAY
DRIVEWAY .6 7
LOT 1 TAYLOR COURT, COOROY,
Dia 16.51
19 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.