Decision Notice

Attached to the e-mail Operational Works Application OPW18/0028 - 8 Supplejack Crt Lake Macdonald.

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

1. Details of the approval

This application is not taken to have been approved (a deemed approval) under section 64(5) of the Planning Act 2016.

The following approvals are given:

 

Planning Regulation Development Preliminary
2017 reference Permit Approval

 

Carrying out building work (assessable under the Building Act 1: 975) Schedule 9, part 1

 

 

 

 

 

2. Variation approva! details — Not applicable

3. Conditions
This approval is subject to the conditions in Attachment 1.

4. Further development permits
Please be advised that the following development permits are required to be obtained before the development can be carried out:
* NIL
5. Properly made submissions — Not applicable
6. Referral agencies for the application — N/A

7. Environmental authority — Not applicable

8. Other requirements under section 43 of the Planning Regulation
Material Change of Use Ref: MCU17/0526 Issued By: Noosa Council Dated: 2" November 2017

9. Approved plans and specifications

 

 

Drawing/report title | Prepared by Date | Reference no: Version/issue

 

 

Aspect of Development: Building Works - Attached stamped plans and documentation including red marked up conditions

 

 

10. Currency period for the approval (s.85)

Two (2) years

11. When approval lapses if development started but not completed—preliminary approval to which a variation
approval applies

Permit will expire if no work commences after 2 years of issue. If work has commenced within 2 years but not
completed and finalised within 2 years of issue the permit will lapse in accordance with section 88 of PA.
Please note after 5 years of permit final or lapsing the file will be disposed of and no records will remain at SBA
office. Archival records will still be available at your local council.

12. INSPECTION REQUIREMENTS:

The Applicant / Builder shall be responsible to arrange with Suncoast Building Approvals or the approved competent person (where indicated
by RPEQ) for the following mandatory inspections indicated below: Note:- Suncoast Building Approvals must be requested to sign off the first

inspection (footing or slab as applicable) prior to proceeding past this stage.

Foundation and excavation stage — before the footings are poured RPEQ & Cadastral Surveyor
Slab Stage — before the concrete is poured RPEQ & Cadastral Surveyor
Frame Stage — reinforced masonry construction — before the wall cavities are filled (if applicable) RPEQ

Frame Stage — generally before the cladding or lining is fixed SBA

Final Stage — at the completion of all aspects of the building work as required under the inspection SBA
guidelines Sect 26 of the Building Regulations 2006.

$BA2017-2468

Page 2

Planning Act Form 2 — Decision notice (approval)
Version 1.0—3 July 2017
Log in to download the original file

Decision Notice.pdf · 571 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.