Decision Notice
Attached to the e-mail Operational Works Application OPW18/0028 - 8 Supplejack Crt Lake Macdonald.
1. Details of the approval This application is not taken to have been approved (a deemed approval) under section 64(5) of the Planning Act 2016. The following approvals are given: Planning Regulation Development Preliminary 2017 reference Permit Approval Carrying out building work (assessable under the Building Act 1: 975) Schedule 9, part 1 2. Variation approva! details — Not applicable 3. Conditions This approval is subject to the conditions in Attachment 1. 4. Further development permits Please be advised that the following development permits are required to be obtained before the development can be carried out: * NIL 5. Properly made submissions — Not applicable 6. Referral agencies for the application — N/A 7. Environmental authority — Not applicable 8. Other requirements under section 43 of the Planning Regulation Material Change of Use Ref: MCU17/0526 Issued By: Noosa Council Dated: 2" November 2017 9. Approved plans and specifications Drawing/report title | Prepared by Date | Reference no: Version/issue Aspect of Development: Building Works - Attached stamped plans and documentation including red marked up conditions 10. Currency period for the approval (s.85) Two (2) years 11. When approval lapses if development started but not completed—preliminary approval to which a variation approval applies Permit will expire if no work commences after 2 years of issue. If work has commenced within 2 years but not completed and finalised within 2 years of issue the permit will lapse in accordance with section 88 of PA. Please note after 5 years of permit final or lapsing the file will be disposed of and no records will remain at SBA office. Archival records will still be available at your local council. 12. INSPECTION REQUIREMENTS: The Applicant / Builder shall be responsible to arrange with Suncoast Building Approvals or the approved competent person (where indicated by RPEQ) for the following mandatory inspections indicated below: Note:- Suncoast Building Approvals must be requested to sign off the first inspection (footing or slab as applicable) prior to proceeding past this stage. Foundation and excavation stage — before the footings are poured RPEQ & Cadastral Surveyor Slab Stage — before the concrete is poured RPEQ & Cadastral Surveyor Frame Stage — reinforced masonry construction — before the wall cavities are filled (if applicable) RPEQ Frame Stage — generally before the cladding or lining is fixed SBA Final Stage — at the completion of all aspects of the building work as required under the inspection SBA guidelines Sect 26 of the Building Regulations 2006. $BA2017-2468 Page 2 Planning Act Form 2 — Decision notice (approval) Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.