Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Revised Owners Consent - 26 The Promontory (002)

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

     Section 1 – Aspects of development
       6.1) Provide details about the first development aspect
       a) What is the type of development? (tick only one box)
        Material change of use               Reconfiguring a lot                  Operational work                      Building work
       b) What is the approval type? (tick only one box)

        Development permit                   Preliminary approval                  Preliminary approval that includes a variation approval
       c) What is the level of assessment?
        Code assessment                      Impact assessment (requires public notification)
       d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
          lots):

       Timber jetty

       e) Relevant plans
        Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms guide:
             Relevant plans.

        Relevant plans of the proposed development are attached to the development application
       6.2) Provide details about the second development aspect

       a) What is the type of development? (tick only one box)
        Material change of use               Reconfiguring a lot                  Operational work                      Building work
       b) What is the approval type? (tick only one box)
        Development permit                   Preliminary approval                  Preliminary approval that includes a variation approval
       c) What is the level of assessment?
        Code assessment                      Impact assessment (requires public notification)

       d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
       lots):

       Landing Timber Jetty
       e) Relevant plans
       Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
             Relevant plans.

        Relevant plans of the proposed development are attached to the development application
       6.3) Additional aspects of development

        Additional aspects of development are relevant to this development application and the details for these aspects that
          would be required under Part 3 Section 1 of this form have been attached to this development application
        Not required




                                                                                                                                                  Page !4
                                                                                                               DA Form 1 – Development application details
                                                                                                                         Version 1.3— 28 September 2020
Document Set ID: 21714761
Version: 1, Version Date: 29/11/2021
Log in to download the original file

Revised Owners Consent - 26 The Promontory (002).pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.