Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Development Assessment Report - 85 Gympie Street, Tewantin

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Proposed Development
Noting Council’s in principle agreement to discharge stormwater to Gympie Street, Lyndsay
Consulting have prepared a Stormwater Plan (Attachment 1), demonstrating the proposed
alternative stormwater arrangement.


Figure 3 below demonstrates the proposed arrangement detailing the proposed arrangement.
Due to site topography that falls from north (front) to south (rear), the proposed infrastructure
requires charged lines. As per the Civil Engineering Plans (Attachment 1) the proposed
arrangement removes the existing 3000lt detention tank and existing outlet pipe that discharges
stormwater to 61-63 Wade Street, Tewantin.


The proposed arrangement contains a slow release pipe and level spreader to ensure captive
stormwater can be released post rain events. As demonstrated in Figure 3 below, the
development will discharge stormwater via two (2) kerb adapters within Gympie Street.




Figure 3 Extract of Stormwater Plan (Source: Lyndsay Consulting)
Log in to download the original file

Development Assessment Report - 85 Gympie Street, Tewantin.pdf · 402 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.