Original source · versioned page text
Development Assessment Report - 85 Gympie Street, Tewantin
Proposed Development Noting Council’s in principle agreement to discharge stormwater to Gympie Street, Lyndsay Consulting have prepared a Stormwater Plan (Attachment 1), demonstrating the proposed alternative stormwater arrangement. Figure 3 below demonstrates the proposed arrangement detailing the proposed arrangement. Due to site topography that falls from north (front) to south (rear), the proposed infrastructure requires charged lines. As per the Civil Engineering Plans (Attachment 1) the proposed arrangement removes the existing 3000lt detention tank and existing outlet pipe that discharges stormwater to 61-63 Wade Street, Tewantin. The proposed arrangement contains a slow release pipe and level spreader to ensure captive stormwater can be released post rain events. As demonstrated in Figure 3 below, the development will discharge stormwater via two (2) kerb adapters within Gympie Street. Figure 3 Extract of Stormwater Plan (Source: Lyndsay Consulting)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original