TOWN PLANNING » DEVELOPMENT MANAGEMENT

DEVELOPMENT APPLICATION
MATERIAL CHANGE OF USE
(DWELLING HOUSE INCLUDING
DOMESTIC OUTBUILDINGS - HORSE
ARENA, STABLES AND GYM) AND
ASSOCIATED OPERATIONAL WORKS

111 LUKES ROAD,
COOROY MOUNTAIN
LOT 2 RP214048

   
 

MAKI N G ata el
COMPLEX mee
D EVE LO Pp M E NT FEBRUARY 2026

SI M P LE O/T) mi X= BayAt sop ROE)
Full text of the other 28 pages

Page 2

Project Team

       Specialty                   Consultancy                         Key Contact

     Town Planning              Adapt Development            Liam Pinese
                                Management Pty Ltd           [email protected]

         Design                Skale Building Design         Ben Thornton
                                                             [email protected]

        Engineer             SCG Consulting Engineers        Tom Harrington
                                                             [email protected]

      Geotechnical                    Tectonic               Robert Gibb
                                                             [email protected]

    Civil Engineering        SCG Consulting Engineers        Tom Harrington
                                                             [email protected]

 Soil / effluent disposal   Australian Soil Investigations   Wade Holmes
                                                             [email protected]




                                                                                                2

Page 3

CONTENTS
1.0 SUMMARY​                                             4
   1.1 EXECUTIVE SUMMARY​                                 4
   1.2 DEVELOPMENT APPLICATION DETAILS​                   4
   1.3 PLANNING INSTRUMENT DETAILS​                       4
   1.4 REFERRAL AGENCIES​                                 5
   1.5 PRE-LODGEMENT MEETING​                             5
2.0 SITE DETAILS​                                        6
   2.1 SITE DESCRIPTION​                                  6
3.0 PROPOSED DEVELOPMENT DETAILS​                        7
   3.1 BUILT FORM AND SITE LAYOUT​                        7
   3.2 LANDSCAPING​                                       7
   3.3 ACCESS AND PARKING​                                7
   3.4 EARTHWORKS / SLOPE STABILITY​                      8
   3.5 INFRASTRUCTURE AND SERVICES​                       8
4.0 STATE PLANNING INTERESTS​                            9
   4.1 STATE PLANNING POLICY (SPP)​                       9
   4.2 REGIONAL PLAN​                                     9
   4.3 STATE REFERRAL​                                    9
   4.4 STATE DEVELOPMENT ASSESSMENT PROVISIONS (SDAP)​    9
   4.5 SCHEDULE 10 AND 11 OF THE PLANNING REGULATION​     9
5.0 PLANNING ASSESSMENT​                                 10
   5.1 PROPOSED USE​                                     10
   5.2 TABLE OF ASSESSMENT​                              11
   5.3 RURAL ZONE CODE​                                  11
   5.4 PLANNING SCHEME OVERLAYS​                         12
6.0 SUPPORTING INFORMATION​                              15
7.0 CONCLUSION​                                          17




                                                         3

Page 4

1.0​SUMMARY
1.1 EXECUTIVE SUMMARY

The subject land is located at 111 Lukes Road, Cooroy Mountain. The applicant is applying for a
Development Permit for a Material Change of Use and Operational Works to establish a Dwelling
house. The subject land is located in the Rural zone. The site currently contains an existing dwelling
house and associated structures, which will be demolished in order to establish the proposed
development. The existing studio located in the north-western of the site will be retained and
unchanged.

This application is for a Dwelling House only. The proposed stables and horse arena, defined under
the Planning Scheme as Animal Keeping, will form domestic outbuildings associated with the
proposed dwelling house.

The applicant has consulted experts in design, geotechnical, effluent disposal and civil engineering.
Specialist reports and plans are attached and confirm that the proposed development complies with
local planning scheme codes and State regulations, with suitable alternative solutions provided,
where required, to satisfy all performance-based outcomes being sought.

1.2 DEVELOPMENT APPLICATION DETAILS

 Proposed Development:             Dwelling House
 Type of approval sought:          Development Permit for Material Change of Use and Operational
                                   Works
 Site Address:                     111 Lukes Road, Cooroy Mountain
 Real Property Description:        Lot 2 RP214048
 Site Area:                        367,879.53m2
 Assessment Manager:               Noosa Council
 Owner Details:                    J. Blake
 Applicant Details:                J. Blake

1.3 PLANNING INSTRUMENT DETAILS

 Planning Scheme:                  Noosa Plan 2020 (Amendment 2, 26 September 2025)
 Zone:                             Rural
 Level of Assessment:              Code Assessable
 Applicable Overlays:                  ●​ Agricultural Land (Agricultural Land Conservation Area)
                                       ●​ Biodiversity,   Waterways        and   Wetlands     (MSES
                                          Environmental Values; Area of Biodiversity Significance;
                                          Waterways; MSES Regulated Vegetation - intersecting a
                                          watercourse; MSES Regulated Vegetation - Category R
                                          GBR riverine; Riparian Buffer Area)
                                       ●​ Bushfire Hazard (High Potential Bushfire Intensity;
                                          Medium Potential Bushfire Intensity; Potential Impact
                                          Buffer)
                                       ●​ Flood Hazard (Waterways)
                                       ●​ Landslide Hazard (High Hazard Area; Moderate Hazard
                                          Area)
                                       ●​ Regional Infrastructure (Water Resource Catchment;
                                          Water Supply Buffer)


                                                                                                    4

Page 5

1.4 REFERRAL AGENCIES

 State Assessment       Referral   Not applicable
 Agency:
 Advice Agency:                    Not applicable

1.5 PRE-LODGEMENT MEETING

No Prelodgement Meeting was held or required with Council or SARA for this application.




                                                                                          5

Page 6

2.0​SITE DETAILS
2.1 SITE DESCRIPTION

The subject land is legally described as Lot 2 RP214048, situated at 111 Lukes Road, Cooroy
Mountain, and has a total site area of 36.787953ha.

     Site Characteristic                                     Description
 Existing land use:               The site is currently occupied by a dwelling house and associated
                                  structures, which will be retained as part of the proposed
                                  development. The existing studio located in the north-western of
                                  the site will be retained.
 Parking and access:              There is an existing access point to Lukes Road. Access to the site
                                  will be maintained. A new internal driveway is proposed to service
                                  the proposed new Dwelling House.
 Topography:                      Steep and Undulating.
 Infrastructure:                  Water and sewer are not available to the property. On-site effluent
                                  disposal and water tanks will be provided to service the proposed
                                  development. The site can be connected to electrical and
                                  telecommunications services.




               Figure 1: Aerial photo of site (Noose Council Mapping, accessed October 2025)




                                                                                                   6

Page 7

3.0​PROPOSED DEVELOPMENT DETAILS
This application seeks a Development Permit for a Material Change of Use of premises and
Operational Works to establish a Dwelling House in accordance with the attached proposal plans and
specialist documentation. The proposal also seeks to demolish the existing shed, dwelling and pool.
The proposed stables and horse arena, defined under the Planning Scheme as Animal Keeping, an
accepted rural use and will form domestic outbuildings associated with the proposed Dwelling House.

3.1 BUILT FORM AND SITE LAYOUT

The development proposes a single storey residential dwelling located in the south-western corner of
the site. The design comprises a five bay garage and buggy store, entry, foyer, laundry/mud room,
scullery, kitchen, sitting, dining, lounge, powder room, rumpus and games, outdoor cooking, outdoor
terrace, 4 bedrooms each with ensuites and walk in robes, pool and pool deck area, the master suite
with ensuite, dressing room and study/library.

Additionally a separate gym space is proposed with a sauna, steam room, bathroom and shower
facilities, workout area and outdoor sitting is proposed in a separate building located to the east of
the dwelling.

All buildings will contribute to <1% site cover. The proposed gross floor area is 877.74m2, which is
broken down as follows:

    ●​ New dwelling house: 782.3m2.
    ●​ Gym: 95.44m2.
    ●​ Additional floor areas not contributing to gross floor area includes the garages (167.06m2)
       and external living/porch (71.12m2).
    ●​ The studio in the north east corner of the site will remain unchanged.

Building materials and finishes are shown in the attached Elevation Plans and perspective images.
Elevations incorporate a mix of building materials and finishes to provide visual interest that is
reflective of the locality, and include rendered finishes, feature stonework, glass, vertical screens and
Colorbond roofing. Refer to elevation and perspective plans.

3.2 LANDSCAPING

As indicated on the Site Plan, some vegetation will be removed to accommodate the proposed
development. New landscaping will be introduced to enhance the proposed development.

3.3 ACCESS AND PARKING

The existing driveway access will be maintained, and a new driveway is proposed to link to the
existing driveway and provide improved access to the new Dwelling House. Refer to the attached
Engineering Plans for details.

Table 9.4.1.4 of the Driveways and Parking code requires 2 spaces for a Dwelling House. The
proposed new Dwelling House contains five garage spaces plus a covered space for a buggy, which
exceeds the minimum required car parking rate.




                                                                                                       7

Page 8

3.4 EARTHWORKS / SLOPE STABILITY

Engineering Plans have been prepared which details the proposed earthworks associated with the
proposed development. The proposal is supported by the attached Slope Stability Assessment, which
confirms low risk of slope instability. Refer to documentation for finer details.

3.5 INFRASTRUCTURE AND SERVICES

Waste collection will be provided as per previous arrangements.      The site can be connected to
electrical and telecommunications.

Water tanks will be required to service the development, and can be conditioned.

A Site and Soil Evaluation Report has been prepared by Australian Soil Investigations. An Advanced
Secondary Wastewater Treatment System is proposed for treatment of effluent. A pressurised
sub-surface reticulated irrigation system is proposed for disposal of the treated effluent within the
nominated Land Application Area (LAA). The LAA has an area of 320m2, and is located to the north of
the proposed gym. Refer to report for details.




                                                                                                   8

Page 9

4.0​STATE PLANNING INTERESTS
The Planning Regulation 2017 prescribes the relevant Assessment Benchmarks and process of
planning instruments and development applications. The following Assessment Benchmarks have
been considered in this application and are discussed in further detail below in the following sections:

    ●​   State Planning Policy (SPP);
    ●​   South East Queensland (SEQ) Regional Plan;
    ●​   State referral requirements;
    ●​   State development assessment provisions (SDAP); and
    ●​   Schedules 10 and 11 of the Planning Regulation.

4.1 STATE PLANNING POLICY (SPP)

Part E of the State Planning Policy provides a comprehensive review of the State interests, the related
policies and assessment benchmarks under five broad themes. Section 2.1 of the Noosa Planning
Scheme confirms it integrates the provisions of the State Planning Policy into the Planning Scheme.
No further assessment is required.

4.2 REGIONAL PLAN

Section 2.2 of the Noosa Planning Scheme confirms it appropriately advances the SEQ Regional Plan.
No further assessment is required. The subject site is ideally located within the Regional Landscape
and Rural Production Area under the SEQ Regional Plan.

4.3 STATE REFERRAL

Referral to State Assessment Referral Agency (SARA) is not required.

4.4 STATE DEVELOPMENT ASSESSMENT PROVISIONS (SDAP)

State Development Assessment Provisions (SDAP) includes a series of benchmarks in which SARA will
use to assess an application. In accordance with section 4.3 above, referral is not required.

4.5 SCHEDULE 10 AND 11 OF THE PLANNING REGULATION

A review of Schedule 10 of the Planning Regulation confirms that the proposed development is not
prohibited development. A review of Schedule 11 of the Planning Regulation provides assessment
benchmarks in relation to koala habitat in the SEQ Region where for development on premises in a
koala priority area not interfering with koala habitat and for development in an identified koala
broad-hectare area. The site is not mapped as containing koala habitat/broad hectare area and the
assessment benchmarks are therefore not applicable to this development.




                                                                                                      9

Page 10

5.0​PLANNING ASSESSMENT
Under the Noosa Plan 2020, the site is within the Rural Zone. Refer to the zoning map extract below
in Figure 3.




                  Figure 3: Zone Map Extract (Noosa Mapping, accessed October 2025)


5.1 PROPOSED USE

Under the Noosa Planning Scheme, the proposed development is defined as:

Dwelling house -
  ​ means a residential use of premises involving—
  ​ a. 1 dwelling and any domestic outbuildings associated with the dwelling; or
  ​ b. 2 dwellings, 1 of which is a secondary dwelling, and any domestic outbuildings associated
       with either dwelling.
  ​ Does not include the following examples:
  ​ Caretaker’s accommodation, dual occupancy, rooming accommodation, short-term
       accommodation, student accommodation, multiple dwelling

Comment: The proposal is considered in accordance with the above definition, which is a consistent
land use on the subject site. The proposed will also be used for Animal Husbandry with domestic
outbuildings proposed associated with the dwelling house to support the continued rural use of the
subject site.




                                                                                               10

Page 11

5.2 TABLE OF ASSESSMENT

Under the relevant table of assessment for the Rural Zone, the proposed development is subject to
code assessment. The proposed development is required to be assessed against the following codes:

    ●​   Rural zone code;
    ●​   Low density housing code;
    ●​   Biodiversity, waterways and wetlands overlay code;
    ●​   Bushfire hazard overlay code;
    ●​   Flood hazard overlay code;
    ●​   Landslide hazard overlay code;
    ●​   Regional infrastructure overlay code.

The proposal has been assessed against the Acceptable Outcomes and Performance Outcomes of the
above codes in Attachment A, and is considered compliant. Where the proposal does not comply
with an Acceptable Outcome, alternative solutions to satisfy the corresponding Performance Outcome
have been provided. Elements of the code which are not applicable to the subject site or proposed
development have been removed from the tables below.

5.3 RURAL ZONE CODE

A review of the Rural zone code has been undertaken. Refer to attached code assessment. The
proposed development meets the purpose, overall outcomes and the relevant acceptable outcomes of
the code. The proposal complies with, can comply with or can be conditioned to comply with all of
the relevant code requirements with the exception of the acceptable outcomes below:

     Performance Outcome                      Acceptable Outcome                         Response

 PO7      Buildings    and      other    AO7.3 With the exception of Class   The proposed gross floor area is
 structures:                             10 buildings or structures used     877.74m2 including dwelling and
                                         exclusively for a rural activity,   gym. Other ancillary structures are
     (a)​ are low rise;                  individual buildings or roofed      Class 10.
     (b)​ minimise the appearance        structures do not exceed 500m2
          of bulk to adjacent            gross floor area.                   The proposal presents as low rise
          properties, roads or other                                         (single storey) built form with a
          areas in the vicinity of the                                       height of less than 8 metres. The
          site; and                                                          proposal is setback approximately
     (c)​ respect the scale of                                               117.1m from the Lukes Road
          surrounding      vegetation                                        frontage,      minimising       the
          and              maximises                                         appearance of bulk to the street.
          opportunities to retain
          existing vegetation on                                             The proposal is located within a
          site.                                                              predominantly cleared area on the
                                                                             site, and is located a sufficient
                                                                             distance       from       mapped
                                                                             environmental constraints. Minimal
                                                                             vegetation will be removed, and
                                                                             this can be offset with the new
                                                                             planting of native species to suit
                                                                             and enhance the proposed built
                                                                             form.

                                                                             The    proposal   is    considered
                                                                             compliant with PO7.




                                                                                                             11

Page 12

5.4 PLANNING SCHEME OVERLAYS
The below table addresses the applicable overlays relating to the development site:


                      Overlay                                           Comment

                                        Agricultural Land

                                                      The proposal is located within a mapped
                                                      agricultural land conservation area. The
                                                      proposal considers the other mapped
                                                      overlays and seeks to avoid these. The siting
                                                      of the proposed dwelling will be in a similar
                                                      alignment to the existing dwelling house in
                                                      an area outside of mapped ecological and
                                                      landslide constraints. It is intended to
                                                      undertake Animal Keeping (horse stables and
                                                      arena), in addition to the ongoing cattle
                                                      grazing on the land which is an acceptable
                                                      land use within the rural zone.



                            Biodiversity, Waterways and Wetlands

                                                      The proposal results in minimal vegetation
                                                      clearing, however, the proposed vegetation
                                                      clearing is not mapped as containing
                                                      biodiversity significance or on land identified
                                                      as a riparian buffer area. As per the Site Plan,
                                                      the proposal (with the exception of the
                                                      existing driveway) is located outside of the
                                                      mapped riparian buffer area.




                                                                                                    12

Page 13

Bushfire Hazard

           The proposal has sufficient area to
           accommodate suitably sized water tanks for
           fire fighting purposes. A driveway extension
           is proposed to achieve suitable access to the
           proposed dwelling that will be able to
           accommodate a fire fighting appliance.




 Flood Hazard

           The proposal is located a suitable distance
           from mapped waterways.




Landslide Hazard

           The site is mapped as containing a high and
           moderate hazard area. The proposal is
           located outside of mapped areas. Despite
           this,   earthworks    are     required   to
           accommodate the proposal as detailed on the
           Engineering    Plans.  A Slope Stability
           Assessment has also been prepared to
           support the proposal.




                                                      13

Page 14

Regional Infrastructure

              A Site and Soil Evaluation Report has been
              prepared by Australian Soil Investigations. An
              Advanced Secondary Wastewater Treatment
              System is proposed for treatment of effluent.
              A     pressurised    sub-surface    reticulated
              irrigation system is proposed for disposal of
              the treated effluent within the nominated
              Land Application Area (LAA). The LAA has an
              area of 320m2, and is located to the north of
              the proposed gym. Refer to report for details.




                                                           14

Page 15

6.0​SUPPORTING INFORMATION
The following section provides a summary of the supporting information relating to the proposed
development:

                                 Documentation for Approval

  Plan No.      Rev    Plan Title                                                          Date

   2403-02     DA01    Location Plan, prepared by Skale Building Design                   01/02/26

   2403-03     DA01    Site Plan prepared by Skale Building Design                        01/02/26

   2403-04     DA01    Floor Plan (Dwelling), prepared by Skale Building Design           01/02/26

   2403-05     DA01    Floor Plan (Dwelling), prepared by Skale Building Design           01/02/26

   2403-06     DA01    Floor and Roof Plan (Gym), prepared by Skale Building Design       01/02/26

   2403-07     DA01    Floor and Roof Plan (Stables), prepared by Skale Building          01/02/26
                       Design

   2403-08     DA01    Roof Plan (Dwelling), prepared by Skale Building Design            01/02/26

   2403-09     DA01    Roof Plan (Dwelling), prepared by Skale Building Design            01/02/26

   2403-10     DA01    Elevations (Dwelling), prepared by Skale Building Design           01/02/26

   2403-11     DA01    Elevations (Stables and Gym), prepared by Skale Building           01/02/26
                       Design

   2403-12     DA01    Floor Areas, prepared by Skale Building Design                     01/02/26

   2403-13     DA01    Perspectives, prepared by Skale Building Design                    01/02/26

 26020-001       0     Slope Stability Assessment, prepared by Tectonic                   13/02/26

  250385(S)      -     Soil Test Report, prepared by Australian Soil Investigations       23/01/26

  250385(A)      -     Site and Soil     Evaluation,   prepared    by   Australian Soil   23/01/26
                       Investigations

   0577-CS       -     Cover Sheet, prepared by SCG Consulting Engineers                  Feb 2026

  0577-CN        -     Construction Notes, prepared by SCG Consulting Engineers           Feb 2026

 0577-OW1.1      -     Existing Survey and Services, prepared by SCG Consulting           Feb 2026
                       Engineers

 0577-OW2.1      -     Silt and Sediment Erosion, prepared by SCG Consulting              Feb 2026
                       Engineers

 0577-OW3.1      -     Earthworks Part 1, prepared by SCG Consulting Engineers            Feb 2026

 0577-OW3.2      -     Earthworks Part 2, prepared by SCG Consulting Engineers            Feb 2026


                                                                                                15

Page 16

0577-OW3.3   -   Earthworks Sections, prepared by SCG Consulting Engineers   Feb 2026

0577-OW4.1   -   Driveway Levels 1, prepared by SCG Consulting Engineers     Feb 2026

0577-OW4.2   -   Driveway Levels 2, prepared by SCG Consulting Engineers     Feb 2026

0577-OW4.3   -   Driveway Jointing 1, prepared by SCG Consulting Engineers   Feb 2026

0577-OW4.4   -   Driveway Jointing 2, prepared by SCG Consulting Engineers   Feb 2026

0577-OW4.5   -   Driveway Details, prepared by SCG Consulting Engineers      Feb 2026

0577-0W5.1   -   Vehicle Maneuvering, prepared by SCG Consulting Engineers   Feb 2026




                                                                                   16

Page 17

7.0​CONCLUSION
This Town Planning Assessment Report has been prepared on behalf of J. Blake to support a
Development Application for a Material Change of Use of premises to establish a Dwelling House, in
respect of land at 111 Lukes Road, Cooroy Mountain (Lot 2 RP214048).

The site is included under the Noosa Planning Scheme within the Rural zone. Within the Rural zone,
the proposed development is a consistent land use, and is subject to a Code Assessable application.

The proposal is considered consistent with relevant State planning provisions and demonstrates
compliance with the applicable local planning provisions. Any planning scheme non-compliances have
been satisfactorily discussed and justified in the planning assessment section of this report via
suitable alternate solutions in accordance with the higher order performance outcomes of the
relevant codes.

Approval of the proposed development is warranted subject to relevant and reasonable conditions.




                                                                                                   17

Page 18

ADAPT

ATTACHMENT A
CODE ASSESSMENT

18

Page 19

Rural Zone Code
Performance Outcome                 Acceptable Outcome                      Response

Built form                          AO7.1 Buildings are no more than The proposal is single storey.
                                    two storeys in height.
Building height and scale
PO7      Buildings       and   other AO7.2 With the exception of Class The proposal does not exceed
structures:                           10 buildings or structures used 8m in height.
    (d)​ are low rise;                exclusively for a rural activity,
    (e)​ minimise the appearance of buildings and structures are no
         bulk to adjacent properties, more than 8 metres in building
         roads or other areas in the height providing that they may be
         vicinity of the site; and    up to 9 metres where the pitched
                                      roof but no other part of the
    (f)​ respect      the    scale of
                                      building or structure exceeds 8
         surrounding vegetation and
                                      metres.
         maximises opportunities to
         retain existing vegetation Alternative provision to the QDC
         on site.
                                    AO7.3 With the exception of Class Alternate solution
                                    10 buildings or structures used Refer to report.
                                    exclusively for a rural activity,
                                    individual buildings or roofed
                                    structures do not exceed 500m2
                                    gross floor area.

                                    AO7.4 Class 10 buildings used Complies
                                    exclusively for the purpose of
                                    animal husbandry, aquaculture,
                                    cropping, intensive animal industry,
                                    intensive horticulture or rural
                                    industry do not exceed 12 metres in
                                    height.

                                    AO7.5 A structure, not constituting Complies
                                    a building, used exclusively for the
                                    purpose of animal husbandry,
                                    aquaculture, cropping, intensive
                                    animal       industry,     intensive
                                    horticulture or rural industry does
                                    not exceed 15 metres in height.

                                    AO7.6 The exposed portion of the Complies.
                                    external elevation of the building
                                    cannot exceed the respective
                                    building heights in AO7.1, AO7.2,
                                    AO7.3, AO7.4 and AO7.5 above and
                                    do not appear to exceed more than
                                    two storeys when viewed externally
                                    from any elevation.
                                    Editor's note—refer to figure AP3-13A




                                                                                             19

Page 20

Setbacks                             AO8.3 With the exception of a Complies
PO8 Notwithstanding that intensive roadside      stall,   buildings    and
rural activities may need greater    structures  associated  with   a rural
separation distances, buildings and activity or industrial activity are set
other structures are appropriately back 20 metres from a road reserve
sited and designed to:               or 40 metres from any part of the
                                     major road network.
    (a)​ avoid environmental harm
         or nuisance to sensitive
         land      uses,   including AO8.4        In addition to the The proposal is setback >10m
         adverse      impacts     on circumstances of AO8.1, to AO8.3 from all boundaries and is
         amenity values, over and above, buildings and structures located outside the riparian
         above       what      could meet the following minimum buffer area.
         reasonably be expected in boundary setbacks:
         the rural zone;                (a)​ 20 metres from a property
     (b)​ avoid adverse impact on                   boundary of adjoining land in
          ecologically    important                 the           Environmental
          areas including National                  management               and
          Parks, watercourses, and                  conservation zone, unless
          wetlands;                                 such land is in private
     (c)​ mitigate risks associated                 ownership;
          with the use of chemicals             (b)​ a distance greater than the
          or air pollutants; and                     width of the riparian buffer
     (d)​ avoid conflict with rural                  area shown on Biodiversity,
          uses and activities on                     Waterways     and   Wetland
          adjoining properties.                      Overlay maps;
                                                (c)​ 10 metres from        a   road
Editor's note- For uses that are subject to          frontage; and
impact assessment, required setback and         (d)​ 10 metres from the side and
separation distances will vary with the scale        rear boundaries or 6 metres
and type of rural activity. Relevant factors
that will be taken into account when                 where the lot area does not
determining appropriate distances include            exceed 1 hectare, with the
the type and scale of buildings and                  exception that if the height of
structures proposed, the use of buildings            the building or structure
and structures, construction methods, level
of containment and ventilation, potential
                                                     exceeds 9 metres the setback
noise, odour or air pollutant nuisance,              to    the side and rear
topography, climatic variables, existing             boundaries is equal to twice
vegetation between land uses, and a range            its height in metres.
of management practices that can be
employed to mitigate off-site impacts.

PO10 Development does not AO10 Safe vehicular access is No change is proposed to
compromise the safety, capacity or provided to and from the site existing          arrangements.     A
operation of the road network.     without adversely impacting on the driveway  extension is proposed
                                   safety of the road network.        to service the new built form.

Environment,   heritage         and AO11.1 Development does not Can comply - to be conditioned.
scenic amenity                       result in sediment, soil or other
PO11 Development does not have material including building materials
a significant adverse impact on the or waste products being released
natural values of the site including into the road reserve, stormwater
through:                             drains, waterways or adjacent
                                     properties.
  (a)​ loss of biodiversity values,
       fauna    habitat   and fish
       passage;                      AO11.2 Natural Vegetation is Most vegetation can be retained


                                                                                             20

Page 21

 (b)​ changes to natural drainage; retained wherever possible.              except for a small number of
 (c)​ disturbance to any wetland                                            trees, which are nominated on
      systems;                                                              the Site Plan. New landscaping
                                                                            can be provided to offset the
 (d)​ erosion and the transport of                                          loss as required.
      sediments off site (including
      pollutants      and       other
      contaminants which would AO11.3 Where                  there is a Not applicable.
      affect    the    capacity    of nominated   building envelope on the
      agricultural lands);            lot, clearing  of  native  vegetation
                                      and building works do not extend
 (e)​ worsening of landslide or fire beyond the building envelope,
      risk;                           except for the purposes of a
 (f)​ on-site effluent disposal;      driveway access.
 (g)​ creation of dust and air
      pollutants;
 (h)​ disturbance of buildings and
      features, including natural
      features, of cultural heritage
      significance.

PO12 Development and associated AO12 Development and associated Can comply - Refer attached
site works do not directly, indirectly site works, including filling and engineering plans from SCG.
or cumulatively cause adverse excavation are designed and
impacts        external     to     the constructed to ensure overland flow
development site by:                   and/or flooding is not worsened,
     (a)​ causing ponding of water; impeded, or otherwise diverted to
                                       adversely affect other properties.
     (b)​ increasing flooding, which
          adversely affects the safety
          or use of any land
          upstream and downstream;
   (c)​ adversely affecting the flow
        of water in any overland
        flow path.

Scenic amenity                     AO13        Development on land Not applicable.
PO13 Development does not          adjoining  the major road network,
detract from the scenic amenity of Lake  Macdonald   or the Noosa River
the hinterland as experienced from system  minimises  visual impacts on
the major road network or          the scenic  amenity   of the roadway
waterways.                         or waterway   by:
                                       (a)​ sensitive siting and design
                                            of buildings, structures,
                                            driveways and works;
                                       (b)​ retaining            existing
                                            vegetation;
                                       (c)​ incorporating    landscape
                                            treatments    to    visually
                                            screen      and      soften
                                            development; and
                                       (d)​ incorporating       building
                                            materials    and    external
                                            finishes that are compatible
                                            with    the site’s visual


                                                                                                 21

Page 22

                                                character      and    landscape
                                                setting.

                                       Editor’s Note— Residential buildings should
                                       be predominantly finished in colours and
                                       materials that blend well with the colours
                                       and hues of the surrounding vegetation and
                                       landscape without causing glare or
                                       reflection.
                                       For agricultural buildings, colours and
                                       textures that blend with the natural setting
                                       are preferred however if not practical,
                                       buildings should at least be well maintained
                                       and/or visually screened.

Sloping sites and ridgelines          AO15.1 To protect scenic amenity The proposal is located outside
                                      and other landscape qualities, of mapped areas.
PO15 The landscape character and
                                      buildings, structures and associated
visual amenity quality of hill slopes
                                      accessways are not constructed on
and ridgelines are retained and
                                      land with a slope greater than 25%.
buildings and structures:
   (a)​ are visually responsive to AO15.2 On sloping sites or on The proposal is located outside
        the natural topography of ridgelines at the uppermost edge of of mapped areas.
        the site, sitting within the a hill slope:
        landscape      rather   than      (a)​ roof lines are generally
        dominating it;                         parallel with contours of the
   (b)​ step down slopes or use                 land;
        suspended             floor        (b)​ roofs do not exceed a pitch
        construction,    minimising             of 15 degrees; and
        cut and fill and avoiding
        benching of the site;              (c)​ buildings do not protrude
                                                above the height of
   (c)​ allow for retention of                  prevailing vegetation.
        natural vegetation that Editor's note- refer to Figure 6.9.1A and
        assists in screening or Figure 6.9.1B. and Figure AP3-3B.
        visually         softening
        development; and                                                       The proposed earthworks will
                                    AO15.3 Cut or fill is less than 1.5
                                                                               exceed 1.5m within existing
   (d)​ incorporate      materials, metres in depth relative to the
                                                                               ground level. However, these
        finishes and colours that natural ground surface.
                                                                               earthworks       are    specifically
        complement the natural
                                                                               designed   to  return  the land to
        setting and integrate with Editor’s Note— On visually prominent hill
                                    slopes or ridgelines residential buildings its natural profile by focusing on
        the landscape and skyline. should be predominantly finished in colours
                                                                               the areas that were originally
                                    and materials that blend well with the filled,      associated with the
                                    colours and hues of the surrounding
                                    vegetation and landscape without causing   former   house.    Please refer to
                                    glare or reflection. Broad expanses of a   the  attached    SCG   Engineering
                                    single colour are less desirable and where Plans for details.
                                       possible should be broken up by other
                                       colours or design elements. Shades in the
                                       violet, blue, green and yellow-green side of
                                       the spectrum, as well as greys or browns,
                                       should be appropriate with whites or bright
                                       colours restricted to trimmings.
                                       For agricultural buildings, colours and
                                       textures that blend with the natural setting
                                       are preferred however if not practical,
                                       buildings should at least be well maintained
                                       and/or visually screened.




                                                                                                         22

Page 23

Low Density Housing Code
Performance Outcome                      Acceptable Outcome                               Response

Effects of use                     AO2.1 Any part of a removal home Not applicable. A removal
Removal homes                      that is affected by termite attack, home is not proposed.
                                   borers,    dry   rot   or   severe
PO2 A removal home—                weathering or is damaged as a
   (a)​ does not have an adverse consequence of relocation, is
        impact on the amenity of repaired or replaced using new or
        the       premises      or sound second-hand materials.
        surrounding premises; and
   (b)​ maintains the safety       of
                                         AO2.2 Where located within the
        people and property.                                               Not applicable.
                                         urban boundary, external surfaces
                                         of the building are cleaned and
                                         painted.

                                         Editor’s Note— the urban boundary is
                                         indicated on the zone maps contained within
                                         Schedule 2.


                                         Editor’s Note— applicants will be required
                                         to pay a performance bond to Council before
                                         final building approval is granted. The bond
                                         is held by Council until all external building
                                         works are completed to a satisfactory level,
                                         usually within a 12 to 24 month time frame.

Housing choice                           AO3 A secondary dwelling:                        Not proposed.
PO3 A secondary dwelling:                     (a)​ has a maximum gross floor
   (a)​ forms part of a dwelling                   area of 65m²;
        house and is not subdivided           (b)​ has no more              than     2
        from the balance of the                    bedrooms;
        dwelling house;                       (c)​ is not used for short-term
   (b)​ is small and subordinate to                accommodation or home
        the balance of the dwelling                based    business   (home
        house;                                     hosted accommodation);
   (c)​ contributes   to    housing           (d)​ does not occur on any
        choice    for    permanent                 property covered by a
        residents and is not let to                Building Unit Plan; and
        short term guests;                    (e)​ does not occur on a
   (d)​ protects the low density                   property    that    already
        residential, rural residential             contains a dual occupancy
        or rural character of the                  or secondary dwelling.
        zone;
   (e)​ does not occur on a
        property covered by a
        Building Unit Plan or any
        property already containing
        more than one dwelling;
   (f)​ is      accompanied        by
        sufficient car parking.



                                                                                                          23

Page 24

Building design and services          AO5.1 If located within the urban Not applicable.
Service and utilities                 boundary, the dwelling is connected
                                      to    reticulated  water     supply,
PO5 Development is provided with: sewerage, stormwater drainage and
   (a)​ a level of infrastructure and telecommunications infrastructure
        services that is appropriate networks (where available to the
        to its setting and sufficient lot).
        for the intended use;
    (b)​ an effluent treatment and Editor’s Note—the urban boundary is
         disposal system that does indicated on the zone maps contained within
         not have an adverse effect Schedule 2.
         on ecologically important
         areas or water quality; and
                                       AO5.2 Where          there is no
    (c)​ adequate      onsite   water reticulated water supply, the Can be conditioned to comply.
         storage to support the premises is serviced with a
         efficient use of water and is rainwater tank with the following
         adequate for everyday use minimum water supply capacity:
         of the occupants.
                                           (a)​ for dwellings with no more
                                                than 3 bedrooms – 45,000
                                                litres; or
                                            (b)​ for dwellings of more than
                                                 3 bedrooms or where
                                                 including    a   secondary
                                                 dwelling on the same
                                                 premises – 60,000 litres.


                                       AO5.3 If located on a lot where Refer to Site and          Soil
                                       reticulated    sewerage     is   not Evaluation Report.
                                       available to the lot, the dwelling is
                                       connected to an on-site effluent
                                       treatment and disposal system.

Landscaping                        AO6 Soft landscaping is provided This requirement        can    be
PO6 Buildings and structures allow and retained to a minimum of 20% achieved.
for sufficient space for outdoor of the site area.
activities,  garden    areas    and
screening to surrounding land uses.

Car parking                   AO7 Car parking is provided in Allowance for 6 cars can be
PO7 Sufficient car parking is accordance with Table 9.4.1.4 of provided within the garages.
provided to accommodate the the Driveways and parking code.
number of vehicles likely to use the
site.                                Editor's note— while the planning scheme
                                       does not require car parking spaces to be
                                       covered, the desire to retrospectively cover a
                                       parking space is not supported if site cover
                                       and setback provisions are not met.




                                                                                            24

Page 25

Driveway and crossover                  AO8.1 Driveways and crossovers Refer to Engineering Plans.
Editor’s Note—In addition to the following are designed to comply with
benchmarks for accepted development Council's            standard     drawings
subject to requirements for driveway and RS-049,       RS-050, RS-056 and
crossovers, approval is required from Council
to construct or modify all crossovers.
                                              addendum as applicable.

Access Design
PO8 The design, management and AO8.2 Where a footpath exists, the No footpath exists.
maintenance   of   the  access driveway meets the road reserve at
facilitates:                   the level of the existing footpath.

    (a)​ safe and convenient use for
         vehicles, pedestrians and AO8.3 Driveways                  within      the Refer to Engineering Plans.
         cyclists;                   property:
    (b)​ vehicles negotiating without       (a)​ have a maximum gradient
         contacting the driveway or              of 20% and vertical curves
         crossover surface; and                  to ensure no scraping for a
    (c)​ stormwater         disposal             standard vehicle; or
         without    any    negative         (b)​ have a maximum gradient
         impacts on the surrounding              of 25% provided–
         area.                              (c)​ the length of the driveway
                                                 steeper than 20% does not
                                                 exceed 6 metres; and
                                            (d)​ there is a change in
                                                 gradient not less than 2
                                                 metres in length and not
                                                 greater than 12:5% at the
                                                 ends of the 25% section of
                                                 the driveway.

PO9 The driveway and crossover AO9 The driveway and crossover is                       No alteration to the road
design avoids using structures designed      without      significant                  reserve will be required. The
within the road reserve.       alteration to the existing road                         proposal seeks to reutilise the
                               reserve whereby the finished                            existing crossover, and seeks
                               surface level of the driveway is                        to     provide   a     driveway
                               consistent in height with the                           extension internally to connect
                               existing height of the road reserve.                    to the proposed dwelling.

                                        Editor’s Note—Should the design not
                                        comply with the standard drawings,
                                        including any cut or fill within the road
                                        reserve, an operational works application to
                                        Council for a non-standard driveway is
                                        required.

Protection of infrastructure          AO12 Driveways are located not Complies.
PO12 Driveways do not damage or less        than     1.0    metre from
interfere with the location, function stormwater infrastructure.
of,    or    access     to    Council
infrastructure.                         Editor’s Note—If the driveway covers or is
                                        within     1.0    metre    of    stormwater
                                        infrastructure,   an    operational   works
                                        application to Council for a non-standard
                                        driveway is required.




                                                                                                              25

Page 26

Streetscape and        effect  on AO14.1 Only one driveway and Complies.
traffic network                    crossover is provided.
PO13 The visual impact of AO14.2 Where the premises has Not applicable.
driveways on the streetscape and frontage to more than one formed
surrounding area is minimised and and sealed road and the roads have
significant adverse impacts on the differing orders in the Road
traffic network are avoided.       Hierarchy,    the   driveway   and
                                   cross-over is provided on the
                                   frontage with the lower order.


                                       AO14.3 For corner lots, driveways Not applicable.
                                       and crossovers are located in
                                       accordance with Council's standard
                                       drawings.

                                                                          No change to the existing
                                       AO14.4 If in the Rural zone or
                                                                          driveway  crossover     is
                                       Rural    Residential zone,     the
                                                                          proposed.
                                       driveway and cross-over is located
                                       to provide minimum safe sight
                                       distances in accordance with
                                       Austroads.

                                       Editor's Note - An operational works
                                       application is required for a second driveway.

Bushfire Hazard Management       AO15 Within a bushfire hazard This requirement             can   be
PO15 Where located in a Bushfire area where there is no reticulated conditioned.
Hazard Area as shown on the water supply, the premises has:
Bushfire Hazard Overlay Map in              (a)​ an       accessible   dam,
Schedule 2 and not in a water                    swimming pool or water
service area, an adequate, reliable,             tank        available   for
safely located and freely accessible             firefighting purposes with
water supply is provided for fire                an onsite water volume of
fighting purposes, which is in                   not less than 5,000 litres;
addition to day to day water supply.             and
                                            (b)​ a water supply outlet pipe
                                                 50 millimetres in diameter
                                                 and fitted with a standard
                                                 fire     brigade     fitting
                                                 connected to the water
                                                 supply (other than where
                                                 the water supply is in a
                                                 swimming pool or dam).

                                       Editor’s Note — Water supply capacity for
                                       firefighting purposes is in addition to water
                                       supply capacity for household use.

Flood Hazards                      AO16.1 Where the development is Not applicable.
PO16 Development is designed located in the Flood Hazard Area as
and sited to ensure risk to people shown on Flood Hazard Overlay
and property from flooding is Map in Schedule 2, the finished
                                   floor level of habitable rooms is at

                                                                                            26

Page 27

avoided or minimised.                 least 300 millimetres above the
                                      Defined flood event (DFE).


                                      OR


                                      AO16.2 Where the DFE has not
                                      been modelled for the area, the Not applicable.
                                      finished floor level of habitable
                                      rooms is at least 500 millimetres
                                      above the highest recorded flood.

                                      Editor's Note—The QDC mandatory
                                      provisions MP3.5 also apply to the
                                      construction of buildings in flood hazard
                                      areas.

Major Electricity Infrastructure AO18.1 Development including any Not applicable.
& Substations                    sensitive land uses is at least:
PO18 Development is sufficiently           (a)​ 50    metres     from        a
separated from major electricity                transmission substation;
infrastructure and substations to          (b)​ 10 metres from any other
minimise the likelihood of nuisance             substation; and
or complaint.
                                           (c)​ 30    metres      from   a
                                                transmission line easement.


                                      AO18.2 Habitable buildings are not
                                      located within an easement for a
                                      distribution line.

PO20        Wherever       practicable AO20 Where adjoining substations Not applicable.
habitable buildings are orientated to or major electricity infrastructure,
avoid direct overlooking of major habitable buildings are orientated
electricity     infrastructure      or so that the majority of outdoor
substations.                           living areas and windows of
                                       habitable rooms face away from the
                                       infrastructure.

Earthworks and Drainage                AO21        Filling    other    than Can comply with PO21 - Refer
PO21 Earthworks and drainage           accessways:                          to Earthworks Plans.
operational works do not directly,         (a)​ does not extend more than
indirectly or cumulatively cause                the equivalent of 1.5
adverse impacts external to the                 metres within the urban
development site by:                            area boundary and 3m for
     (a)​ causing ponding of water              rural areas, measured from
          on the site or nearby land;           the outer walls of the main
                                                building;
     (b)​ increasing flooding, which
          adversely affects the safety     (b)​ is limited to a maximum of
          or use of any land                    500m2; and
          upstream and downstream;         (c)​ does not impact on the
     (c)​ adversely affecting the flow          local drainage of adjoining
          of water in any overland              properties.
        flow path; and


                                                                                                27

Page 28

     (d)​ adversely    affecting the
          privacy or visual amenity of
          surrounding property.

Editor's Note—Development should ensure
that filling does not impact on the amenity
and usability of neighbouring properties
(including loss of privacy caused by relative
level changes) or offsite drainage.

Landslide Hazard Area              AO22.1 Development, including                               The proposal is located
PO22 Development maintains the associated access, is not located on                            outside of mapped areas,
safety of people, property and land identified as a landslide hazard                           however, some earthworks are
hazardous materials stored in bulk area on a Landslide Hazard Overlay                          proposed. A Slope Stability
from the risk of landslide.        Map or areas with 15% slope or                              Assessment      has    been
                                   greater, as determined by a                                 prepared to address the
                                   site-specific slope-analysis                                proposed development and
                                                                                               associated earthworks.
                                                Editor's Note—A site- specific geotechnical
                                                assessment may be used to demonstrate
                                                that although the proposed development is
                                                shown on the Landslide Hazard Overlay as
                                                being in the moderate, high or very high
                                                landslide hazard area, the landslide risk is
                                                low or very low.


                                                OR


                                                AO22.2          A     site-specific
                                                                                    Refer  to   Slope               Stability
                                                geotechnical    assessment       is
                                                                                    Assessment.
                                                prepared     by   a     registered
                                                professional engineer to certify
                                                that:
                                                     (a)​ the stability of the site,
                                                          including          associated
                                                          buildings                and
                                                          infrastructure,     will   be
                                                          maintained and operational
                                                          for    the    life   of   the
                                                          development;
                                                     (b)​ the site is not subject to
                                                          the risk of landslide activity
                                                          originating from other land,
                                                          including land above the
                                                          site; and
                                                     (c)​ development of the site will
                                                          not increase the risk of
                                                          landslide activity on other
                                                          land.

                                                Editor's Note— PSP8 Natural Hazards
                                                provides further guidance on assessing
                                                landslide hazard.
                                                                                               Refer   to   Slope   Stability
                                                AO22.3       Any    specific measures

                                                                                                                    28

Page 29

identified in a site specific Assessment.
geotechnical      assessment    for
stabilising the site or development
are to be fully implemented.




                                            29

Used in these records

About this file

File size
8.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Assessment Report (3).pdf · 8.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.