Concept - Construction and Tree Management Plan Date Issued 18 December 2025 Document Revision Number 03 Project Number AP241011 Document Prepared by Caroline Dann (Aspect APM) Matthew Duncan (Consult Arborist) Simon Lynch (MRP Hydraulic & Fire Consultants) Document Reviewer Zain Thorp (Architectural methodology - Aspect APM) Dave Cox (Site & Construction methodology - Aspect APM) Ecology Reviewer Justin Watson (Gondwana Ecology Group) Construction and Tree Management Plan - REV03 Page of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 39 (of 40)
Page 2
Contents 1. SUBJECT LAND AND PROJECT DESCRIPTION ................................................................................................................... 2 2. PURPOSE ................................................................................................................................................................................ 3 3. MANAGEMENT PLAN STRUCTURE ...................................................................................................................................... 4 4. PRE-CONSTRUCTION ............................................................................................................................................................ 6 4.1. Tree Protection Measures ........................................................................................................................................................ 6 4.2. Construction Contract ............................................................................................................................................................... 6 4.3. Collaboration and Education..................................................................................................................................................... 6 4.4. Site Readiness ......................................................................................................................................................................... 7 4.5. Site Setup and Preparation:...................................................................................................................................................... 8 5. CONSTRUCTION ................................................................................................................................................................... 10 5.1. Construction Sequencing:....................................................................................................................................................... 10 5.2. Cabin Construction Methodology:........................................................................................................................................... 11 6. POST-CONSTRUCTION ........................................................................................................................................................ 15 6.1. Site Demobilisation ................................................................................................................................................................. 15 6.2. Environmental Rehabilitation and Landscaping...................................................................................................................... 15 6.3. Post Construction Arborist Report .......................................................................................................................................... 15 6.4. Hand-Over Documentation ..................................................................................................................................................... 15 7. ONGOING TASKS ................................................................................................................................................................. 16 7.1. Collaboration: ......................................................................................................................................................................... 16 7.2. Exclusion Zones: .................................................................................................................................................................... 16 7.3. Site Vegetation Monitoring:..................................................................................................................................................... 16 7.4. Weed & Rehab Management: ................................................................................................................................................ 16 7.5. Environmental Protection Measures: ...................................................................................................................................... 16 ATTACHMENT A – RACV APPROVED PROJECT PLAN................................................................................................................ 17 ATTACHMENT B – TREE RETENTION PLAN ................................................................................................................................. 18 ATTACHMENT C – TREE PROTECTION PROCEDURES .............................................................................................................. 19 ATTACHMENT D - CONCEPT CONSTRUCTION MANAGEMENT PLANS .................................................................................... 20 ATTACHMENT E – HYDRAULIC AND FIRE SERVICES CONCEPT DRAWINGS .......................................................................... 21 Construction and Tree Management Plan - REV03 Page 5 of 45
Page 3
1.6 SUBJECT LAND AND PROJECT DESCRIPTION
The subject land is located at 94 & 142 Noosa Drive, Noosa Heads. This is properly described as Lot 0 on SP203417, Lot
3 on SP126203, Lot 203 on SP267424, Lot 0 on SP203415, and Lot 200 on SP267421 and is part of the existing RACV
resort landholding. The proposed development is largely located on Lot 3 and encompasses some 0.55ha, all within the
current tourist zone.
RACV intend to develop the land for tourist accommodation as a 15 “eco-style” cabins amongst the retained trees and
replanted/rehabilitated vegetation. Cabins and pathways are to be raised above ground level to minimise impact and
facilitate the ecological outcome.
Figure 1: Approved Site Plan (21-0910_A10-01 P)
A copy of the approved Site Plan is provided in ATTACHMENT A
6
Construction and Tree Management Plan - REV03 Page 4 of 45
Page 4
2.6 PURPOSE
The purpose of this document is to demonstrate how the development will be constructed on the site while protecting and
retaining the trees shown on the Site Plan – Tree Retention vs Removal Plan (as amended under condition 44 of the
Judgment made 1 September 2025). Further, without any development affecting the environmental values within the
Environmental Management and Conservation Zone. The Construction and Tree Management Plan is to be implemented
to enable the proposed environmental covenant area consistent with the Amended Referral Agency Response, dated 22
July 2025 and including the Rehabilitation Works Package and the associated conditions of approval (refer
ATTACHMENT B).
The finalised version of the Construction and Tree Management Plan is to be provided to Noosa Council prior to the issue
of a development permit for operational works, as amended by the conditions of the development approval.
Figure 2: Amended Tree Retention Vs Removal Plan Issue JJ
An updated (November 2025) arborist report (25_11_19_AR_RACV_RACV v NSC_Tree Retention Review_V11) was
prepared to re-assess tree health and retention status as required by condition 44(b) of the development approval. The
Amended Site Plan – Tree Retention vs Removal Plan, version JJ, has been prepared subsequent to the updated tree
health assessment undertaken by Consult Arborist.
Measures to ensure the necessary protection of the nominated trees and vegetation are described herein and in further
detail in the Tree Protection Procedures material in ATTACHMENT C.
Construction and Tree Management Plan - REV03 Page 7 of 45
Page 5
3.6 MANAGEMENT PLAN STRUCTURE
This Construction and Tree Management Plan outlines a comprehensive approach to the construction and development
of the proposed RACV project, prioritizing the preservation of the site's natural environment, minimizing ecological impact
and protecting individual trees of value as required by the development approval.
The report is a collaborative effort between Aspect Architects & Project Managers and Consult Arborist, incorporating
expertise from various disciplines, including ecology, arboriculture, construction management, and engineering.
Gondwana Ecology Group have provided a review from an ecological perspective, and MRP Hydraulic and Fire services
Consultants have provided information on the proposed construction methodology for the provision of water, sewer and
fire services.
Key strategies include careful site planning, staged construction, specialised construction techniques and the
implementation of stringent environmental protection measures. By staging the construction into three phases, and
facilitating the use of smaller, less disruptive construction equipment and construction works, the overall impact on the
site will be reduced considerably. In addition, this staged process with smaller construction areas and specialised building
techniques allows for better onsite environmental controls.
The project works have been separated into (1) PRE-CONSTRCTION, (2) CONSTRUCTION, and (3) POST
CONSTRUCTION. A series of ONGOING TASKS (i.e. to ensure compliance and tree protection) occurs throughout all
three stages.
PRE-CONSTRUCTION
Tree Protection Measures
Construction Contract
Collaboration and Education
Site Readiness
Site Set-up and Preparation
CONSTRUCTION
Overall Project Construction Sequencing/Stage of Works
Cabin Construction Methodology
POST- CONSTRUCTION
Site Demobilisation
Rehabilitation and Landscaping
Post Construction Arborist Report
Hand-Over Documentation
The ONGOING TASKS include:
Collaboration
Construction and Tree Management Plan - REV03 Page 8 of 45
Page 6
Maintenance of Exclusion Zones Site Vegetation Monitoring Weed & Rehab Management Environmental Protection Measures Monitored Access to the Exclusion Zones This document should be read in conjunction with the accompanying attachments: ATTACHMENT A – Project Plan (Court Approved Plan) ATTACHMENT B – Tree Retention Plan ATTACHMENT C – Tree Protection Procedures ATTACHMENT D – Concept Construction Management plans ATTACHMENT E – Hydraulic and Fire Services Concept Drawings Construction and Tree Management Plan - REV03 Page 9 of 45
Page 7
4.6 PRE-CONSTRUCTION
4.1. Tree Protection Measures
A site survey and the site configuration, with an assessment of the trees have been undertaken including the
trees which require further consideration as explained under the updated Arborist Tree Retention Review by
Consult Arborist dated 24 November 2025, Version 11.
The information in this report and associated attachments form the basis of the Tree Protection Procedures and
can be used in conjunction with guidelines laid out in the Australian Standard, AS4970–2009 Protection of Trees
on Development Sites, industry best practices and experiences from the Project Arborist.
Refer to procedures in ATTACHMENT C.
4.2. Construction Contract
Construction Contract: The final approved Construction and Tree Management Plan will form part of the
Conditions of Contract between RACV and the Principal Contractor, requiring the Principal Contractor to comply
with all aspects of the Management Plan. The Principal Contractor will be supervised by RACVs Project
Manager to closely monitor and review work on site progressively throughout the contraction phase.
Contractual penalties will apply and be used where necessary to ensure compliance.
Dilapidation Report: The Principal Contractor will be required to complete a detailed dilapidation report prior to
commencing work on site to comprehensively photograph and catalogue every aspect of the site to be retained
and protected, as well as the immediate zones surrounding the site, this report will be referenced throughout the
construction phase to ensure compliance with every aspect of the Management Plan.
4.3. Collaboration and Education
A collaborative approach between all involved parties is central to the overall success of this proposed project.
Collaboration and Education of the entire project construction team prior to site commencement:
A pre-construction meeting facilitated by the Project Manager will be held with all relevant parties, including
the project arborist, project ecologist, main contractor, and architect, to discuss the project plan and identify
potential challenges. This will include a review of the conditions of approval and the expert reports to
assess existing conditions, potential hazards, and optimization opportunities, ultimately establishing safe
and efficient access routes that minimize environmental disturbance.
Regular meetings are to be facilitated by the Project Manager involving the architect, contractor, and
project arborist - these will be held to ensure all aspects of site readiness are carefully considered and
implemented with minimal impact on the retained trees.
Site Inductions:
ALL workforces on the site are to understand site priorities and be made aware of the Construction and
Tree Management Plan prior to commencing work.
All vegetation tree identification methods and examples will be explained and demonstrated to the project
construction team, ensuring specific site knowledge.
Site orientation for all personnel prior to working on the project.
This education and collaboration are to be ongoing for the duration of all works on site:
This approach will continue into the Construction and Post-Construction stages with educational briefings
to all who attend site – it will be the contractor's responsibility to ensure this is included in all site inductions.
Construction and Tree Management Plan - REV03 Page of 45
Page 8
A designated onsite foreman/supervisor from the construction company is to ensure that the Construction
and Tree Management Plan is adhered to for the construction of the project and maintain regular
communication with the Project Arborist. Daily responsibility for tree protection is that of the site
manager/contractor.
4.4. Site Readiness
This section outlines the crucial preparatory steps undertaken before construction commences to ensure a smooth,
efficient, and environmentally responsible project. These measures prioritize a light touch on the ground and the
protection of the existing trees while facilitating the construction of the cabins. Refer also to information and procedures
as outlined in ATTACHMENT C.
Clearing the site
Clearing the site of obstructions will be done selectively, minimizing unnecessary removal of vegetation.
Removal will comply with environmental regulations and permits.
The Frangipani Vine has spread extensively across the site, negatively affecting both vegetation and
tree health. This dense growth has increasingly impacted numerous trees, leading to significant damage
and, in some cases, tree mortality. To address this issue, a vegetation management proposal has been
put forth, which includes controlling and eradicating the vine and other weeds. This task is essential for
maintaining the health of the native trees and will follow the guidelines outlined in the Weed
Management Plan (RACV Noosa, July 2024).
The details of the locations of the trees and required works recorded Site Plan - Tree Retention and
Removal Plan, Revision JJ are used in this document.
Tree Removal and Management Identification:
The Project Arborist is to identify trees allocated for removal due to design conflict and any remaining
undesirable weed species.
Similarly, the Project Arborist will identify trees that will require pruning to assist with project design
conflict and/or would benefit from general pruning to improve the form or structure of retained trees and
site safety.
Establishing Tree Protection and Exclusion Zones
Prior to any works commencing on the site, the Exclusion Zones shall be established as guided by the
Australian Standard, AS 4970–2009, industry best practices and the experience of the project arborist.
The location of fencing/flagging is to be agreed upon with the project arborist and will follow guidelines
set out in ATTACHMENT C and the section on Tree Protection Fencing.
Given the high number of trees designated for retention, the traditional approach of establishing a Tree
Protection Zone (TPZ) will be modified. Instead, the project will be constructed within a designated TPZ,
with clearly defined construction and activity areas, as well as Exclusion Zones, to prioritize the care of
the retained trees. Construction access routes will be strategically created, primarily along the
alignments of proposed raised boardwalks, the car park area, vacant site areas, and the locations of the
cabins.
The entire site will function as a TPZ, ensuring that site design, construction access, and methods
minimize disturbance during the construction phase. A high level of arborist supervision and guidance
will be maintained throughout the construction and preparation phases. Design features for the units and
required infrastructure have been carefully considered to facilitate coexistence with the trees.
Construction and Tree Management Plan - REV03 Page of 45
Page 9
In terms of tree removal, only the trees identified on the tree removal and tree retention plans are to be
removed. The focus is on those trees deemed of lesser value, thereby reducing the number of higher-
value trees that need to be removed in accordance with the approval, once obtained. The project will
benefit from ongoing arborist guidance throughout the construction process to support the protection of
the trees identified to be retained.
Install tree protection management - this includes ground protection along the boardwalk design and
flagging ‘No-Go’ / Exclusion Zones / TPZs. These will predominately be around the cabin sites – Refer to
ATTACHMENT C.
Tree Protection Fencing
Due to the nature of the site, standard Tree Protection Fencing will not be achievable throughout the
site. The typical steel mesh panels are not suitable to create the Exclusion Zones.
Refer to ATTACHMENT C - Tree Protection Fencing for additional detailed information.
These protection measures will be established by the contractor with guidance from the project arborist.
Fencing the site
Temporary fencing and signage will be erected to delineate the construction site and protect the
surrounding environment, particularly the sensitive ecological areas that have been identified. Refer to
ATTACHMENT D. for the location of proposed fencing. This fence is shown as an indicative line,
however, in reality, the fence will have an organic format as it moves between vegetation and tree
locations.
As with all elements that impact any existing site conditions, the Arborist will be in attendance when the
site fence is located.
Inspection and Signoff
Site inspection of individual tree/vegetation and construction fencing to be undertaken by the site
manager/contractor, project arborist, and project ecologist prior to any site construction activities (other
than those identified above).
Signoff notification (in writing) to be provided by the project ecologist in addition to the arborist signoff
confirming the tree protection requirements are as per ATTACHMENT C.
4.5. Site Setup and Preparation:
Site Mobilisation:
Establish Contractor Site Facilities at the northern carpark, cabins 1, 12 &13 and 14 & 15 locations – refer
to, ATTACHMENT D. These will include prefabricated offices, amenities, material laydown areas and the
potential of shared facilities with the RACV Resort, including parking for contractors.
Temporary utilities such as water, electricity, and sanitation will be installed in designated areas to ensure
minimal disruption to the natural surroundings. These site facilities will be carefully positioned to minimize
their footprint and located within designated areas for future accommodation units.
Designated pathways and Temporary Construction Access zones will be used for movement around the
site to limit ground disturbance.
Ground protection measures, such as geotextiles, mulch, and track mats, will be employed to prevent soil
compaction and erosion.
Construction and Tree Management Plan - REV03 Page of 45
Page 10
Site Access for vehicles – a Traffic Management Plan will be established by the contractor and project
team to coordinate the delivery processes for materials as well as the daily operational workings of the
site, including sub-contractor parking either on or off the site, with a shuttle bus service being provided
where necessary.
Waste Management Practices: Waste management facilities will be conveniently located away from
sensitive vegetation and watercourses. A regular schedule for waste collection and disposal will be
implemented to avoid accumulation, with recycling encouraged to reduce landfill waste. Clearly marked
waste storage areas will facilitate effective waste segregation. These will be located to the north of the
carpark closest to the main road entry for easy access.
Ablution Facilities: In addition to the main site set-up and the semi-permanent ablution facilities located
there, Mobile/Temporary ablution facilities will be strategically placed within the footprint of Cabins 12 &13,
ensuring easy access for servicing and for construction workers to limit pedestrian movement across the
site. It is envisaged that these could be on small self-supporting trailers to reduce the ground surface
touching and for easy removal/maintenance. These portable amenities will be available throughout the
project, regardless of the number of workers on site.
Laydown Areas:
The establishment of well-defined laydown areas is crucial for efficient construction and minimizing
environmental impact, careful planning is therefore required.
The proposed carpark area at the northern end of the site offers a suitable location for primary delivery
and laydown areas due to its ample space. The edge of this area adjacent to retained trees will require
ground protection and/or exclusion from material storage.
The footprint for Cabins 12-15 may offer additional laydown areas for materials delivered on-site due to its
proximity to access roads. However, coordination with the existing RACV Resort may be required to avoid
disrupting visitor access, which can be managed.
Laydown areas will be strategically located to ensure efficient construction operations whilst minimizing
environmental impact. Refer to ATTACHMENT D for proposed locations.
Several key considerations for managing laydown areas effectively include the below – these will be part
of the main contractor's site management planning:
o Clearly defined boundaries
o Ground protection measures adjacent to retained trees (physical surface treatments, geotextiles,
mulch)
o Efficient material organization
o Designated waste storage areas with regular removal schedules
o Safety measures (signage, lighting, barriers)
o Environmental protection (avoiding spills, leaks, and littering)
6
Construction and Tree Management Plan - REV03 Page of 45
Page 11
Establish Site Access Routes:
The project team are to establish controlled access routes into the site for material deliveries as well as
contractors and sub-contractor vehicles.
The creation of dedicated and delineated access pathways for the construction equipment and materials
are to be established and mulched 200-300mm in depth to protect the ground from compaction where
suitable. On completion of the project, the mulch can be carefully spread by hand and used within the
landscaping. Physical surface treatments including track mats and suspended platforms are to be laid over
areas where surface roots are exposed and likely to be impacted pre-construction. Additional protection
measures, including ground and trunk protection are to be used where deemed necessary as the project
progresses.
Boardwalk “corridors” will be utilized as construction access circulation routes to minimize ground
disturbance and protect sensitive areas.
Temporary Construction and Ground Protection Zones have been identified adjacent to the cabins – refer
to ATTACHMENT D – these are to facilitate temporary access and scaffolding for cabin construction
works.
Clearing of Cabin Footprint:
With guidance from the project arborist, the contractor, and the project manager, the site will be pegged-
out and the cabin locations set up.
Grading and leveling the site to achieve the desired elevations and slopes will be carried out while
minimizing soil disturbance and erosion. The cabins will be designed to ensure that the requirement for
minimal site leveling in minimal.
Temporary fencing and signage will be erected to delineate the construction site and protect the
surrounding environment, as outlined in earlier sections Site Readiness and Site Set-up and Preparation.
5.6 CONSTRUCTION
5.1. Construction Sequencing:
To facilitate minimal impact to the site during construction works, a staged approach is to be adopted for construction
sequencing of the overall cabin works. By separating the construction into smaller components, it is envisaged the use of
reduced construction teams and construction machinery. Some of the cabin sites/footprints can be used as working areas
for set-down and circulation.
Stage 1 Construction (Cabins 2 to 9) – Refer ATTACHMENT D
Site preparation – as per the pre-construction stages outlined in earlier sections - Site Readiness and Site
Set-up and Preparation.
The cabin construction sequencing will follow the methodology outlined in the next section Cabin
Construction Methodology.
Stage 1 will focus on the construction of the contractors site facilities and Cabins 2&3, 4&5, 6&7, 8&9.
Construction will centre on cabin earthworks, foundations, structural framing, roofing and cladding, with
some works to the cabin services.
Throughout the construction process, regular monitoring and adjustments will be made to ensure
compliance with the Tree Management Plan and environmental guidelines as previously identified and
detailed.
Construction and Tree Management Plan - REV03 Page 5 of 45
Page 12
Stage 2 Construction (Cabins 1, 10 &11, 12-15) – Refer ATTACHMENT D
Following the completion of Stage 1, construction will shift to Stage 2.
Stage 2 includes: Cabins 1, 10 & 11, 12 & 13, 14 & 15. This stage will also include the completion of the
boardwalks and interior fit outs for the Stage 1 cabins.
This phase will involve similar steps as Stage 1, including earthworks, foundations, structural framing,
roofing and cladding, plus the addition of interior fit-outs, services and boardwalk construction.
Throughout the construction process, regular monitoring and adjustments will be made to ensure
compliance and the tree protection measures and environmental guidelines as previously identified and
detailed.
Stage 3 Construction (Carpark and Boardwalks) – Refer ATTACHMENT D
Following the completion of Stage 1 & Stage 2, construction will shift to Stage 3
Stage 3 includes:
o Boardwalks to the remaining cabins, car parking and access routes.
o Removal of Temporary utilities and the connection of permanent services to the council systems.
o Final Commissioning of all cabins and handover procedures.
This phase will also include the demobilisation of construction site facilities and site
rectification/rehabilitation - as detailed in the section Post Construction.
5.2. Cabin Construction Methodology:
General Earthworks and Excavation:
Excavation will be limited to the necessary extent, focusing on areas where foundation elements are to be
placed.
In sensitive areas, hand excavation will be used to minimize soil disturbance and root damage. Where
mechanical excavation is required, low-impact machinery will be used, and ground protection measures
will be implemented.
Refer to ATTACHMENT C - Work Methodologies Adjacent Trees for detailed information on:
o General Excavation Methodologies
o Post Hole Dig Works Methodology
Excavated soil will be stockpiled in designated areas, away from sensitive vegetation and watercourses.
Whenever feasible, excavated soil will be reused on-site to minimize the need for imported fill. Soil
stabilization techniques will be implemented to prevent erosion and promote vegetation growth.
Effective stormwater management measures, such as silt fences, sediment traps, and swales, will be
implemented to control runoff and prevent sedimentation.
Regular monitoring of water quality will be conducted to ensure compliance with environmental
regulations.
Foundations:
As part of the project design process, a light touch on the ground is the intention, which has driven the
construction methodology and the proposed cabin designs.
It is proposed that a prefabricated steel support sub-frame on pier foundations (either bored piers or screw
piers, whichever is deemed the least invasive at each location required) be used to construct the cabins
within a few meters of retained trees without overly compromising the tree root systems or the ground in
Construction and Tree Management Plan - REV03 Page 55 of 45
Page 13
which they are growing. A lightweight Post and Rail structural prefabricated steel framework allows for the
location of the foundations to move in two directions along the frame, allowing for flexibility on site and the
ability to adapt to any tree root systems. This method is used extensively in modular construction. The
structural engineer will work closely with the architect and the arborist to establish the foundation system
most suitable at each location.
Refer to ATTACHMENT C for detailed information on footing excavation methodologies.
Concrete works to footings will be carried out with a strong focus on environmental sustainability and
minimizing impact on the site's sensitive ecosystems. Environmental Sustainability can be achieved by
several methods including:
o A reduced water-cement ratio subject to structural engineering requirements.
o Supplementary Cementitious Materials (SCMs) could be incorporated to reduce the amount of
cement required and improve concrete properties; and
o Recycled concrete aggregates can be used to reduce the demand for natural aggregates and
minimize waste.
Concrete will be pumped to the cabin footings from the main site laydown areas. This will minimize the
number of concrete trucks, reducing noise and emissions. Low impact curing methods, such as water
curing or membrane curing, can be used to conserve water and reduce environmental impact.
To protect fauna and flora, strict measures are to be implemented by the main contractor to prevent
concrete spills and leaks.
Regular cleaning of equipment and work areas will be required to minimize the risk of concrete
contamination.
Buffer zones are to be established by the Project Arborist and Contractor around sensitive vegetation to
protect it from concrete splashes and spills.
Erosion and sediment control measures will be required to prevent concrete-laden runoff from entering
water bodies.
Structural Framework:
The intention is to use lightweight prefabricated structural steel framing that will be assembled on site – a
Post and Rail structural prefabricated framework.
Steel framing can be designed and manufactured in set lengths, allowing for easier site delivery and
flexibility for installation in restricted spaces.
Temporary scaffolding and small construction equipment may be required for this initial steel erection.
This can be carefully planned and monitored as required per cabin build.
The final structural methodology will be worked up by a qualified structural engineer during the detail
design stage. Continual collaboration with the architects and arborist will ensure a fit-for-purpose outcome
that responds to all site constraints and requirements.
Cladding and Roofing:
To minimize the environmental impact during roofing and cladding works, a modular construction
approach, where feasible, will be employed. Prefabricated panels can be manufactured off-site and
transported to the site using smaller, less disruptive vehicles.
Bushfire requirements will be required to be factored into the final roofing and cladding construction
methodologies in accordance with the approved Bushfire Management and Mitigation Plan and to be
considered under the Development Permit for Building Works.
Manual handling will be prioritized to reduce site disruption, noise pollution and vibration.
Construction and Tree Management Plan - REV03 Page 54 of 45
Page 14
Lightweight scaffolding systems will be utilized to facilitate the installation of roofing and cladding materials.
These systems will be designed to minimize ground disturbance and potential damage to tree roots.
Additionally, careful planning will be undertaken to ensure that scaffolding erection and dismantling
activities do not interfere with the protected tree zones.
Where possible, prefinished panels/cladding will be used, therefore reducing the need for additional on-
site finishing works. Material selections will ensure lifecycle durability, minimising the need for
maintenance and replacement. Material fixing methods will also be considered to minimise installation
time and loose fixing elements.
Regular monitoring and inspections will be conducted to ensure that the roofing and cladding works adhere
to the project's environmental objectives and comply with relevant building codes and regulations.
Boardwalks:
The connecting raised walkways serve to move people through the site during and post-construction. They
provide a key form of site access.
The raised walkways and support sub-frames on flexible pier foundations or spider footings will be used
to minimize disturbance to the tree root systems and surrounding soil. Services will be suspended
whenever possible to avoid excavation.
The boardwalk decking will be selected from recycled materials with low VOC, lifecycle warranties and
durability, limiting replacement requirements. Integrated fixings can be specified to reduce loose fixing
elements.
These raised boardwalks are to be constructed with the project arborist on site to oversee the installation
of the footings as per the Post-hole Dig Works Methodology (ATTACHMENT C).
The commencement of the construction of a boardwalk could be considered as each cabin is nearing
structural completion, to allow off-the-ground personnel access for the internal fit-out.
Internal Fit-out:
To ensure minimal impact on the environment and efficient project delivery, a comprehensive plan for
internal fit-out works will be developed in conjunction with the overall construction schedule. This plan will
account for the staged construction approach and the sequential completion of boardwalks.
It is anticipated that the full internal fit-out works for each cabin will be completed once the boardwalks are
in place. By completing the boardwalks, the fit-out trades will have unhindered access to the site and the
environmental impacts will be minimal.
All large items, baths, toilets, cabinetry, fixtures, etc. could be delivered to site prior as part of the main
building material deliveries and stored in designated lay-down areas.
To reduce waste generation, prefabricated components and prefinished modular systems will be
considered where feasible. The selection of materials and finishes will prioritize sustainability, energy
efficiency, and low VOC emissions.
Services – Fire protection systems, Electrical, Plumbing and Drainage
Services where possible, are devised to avoid excavation and will be suspended under the dwelling
framework and raised access walkways. The raised access walkways will interconnect and service the
units commencing at the car parking area on the northern side adjacent to the existing resort and access
roadway. Refer to the Hydraulic Review for a detailed outline of the proposed services methodology.
Construction and Tree Management Plan - REV03 Page 57 of 45
Page 15
Hydraulic Review (MRP Hydraulic and Fire services Consultants)
This section outlines methods for achieving sanitary drainage and firefighting water supply services to the
proposed 15 Eco Cabins whilst mitigating the impact on tree roots and ground level flora and fauna. Options
presented are based on high level review and assessment of existing and proposed conditions. Finite detailing
will evolve through the typical Building and Plumbing Permit approval design development process in
consultation with relevant parties including, but not limited to, the Building Certifier and Queensland Fire
Department (QFD).
General: Fifteen - Class 3 - Eco Cabins for visitor accommodation are proposed within the precinct. All
class three buildings are less than 500m2 and therefore do not trigger the need for Special Fire Services
in accordance with NCC2022 E1D1 – Fire Hydrants. The extent to which each building is fire separated
in accordance with the NCC provisions will need to be reviewed and confirmed in consultation with the
building certifier during the detailed design / BA phase.
Brigade Access to Water Supply: The private 100mm water reticulation main within the site supplies
domestic drinking water and brigade access to the water supply. An existing Dual Pillar (feed) hydrant is
provided in connection with the private reticulation main near the proposed Eco Cabin development. A
new dual pillar hydrant will be extended to the northern corner of the carpark from the existing private
water main for the purpose of providing brigade access to water supply in accordance with the ‘QFES
Fire Hydrant and Vehicle Access Guidelines for Residential, Commercial and Industrial Lots’. The
attached drawing H-101 (refer to ATTACHEMNET E) provides indicative concept planning for Brigade
Access to Water Supply. This drawing shows the brigade appliance parked on a hardstand within 90m of
the entry door to the most remote cabins. As a minimum, the new dual pillar hydrant will be capable of
delivering 10 l/s flow at 200 kPa residual pressure.
Sanitary Drainage: Survey plans indicate an existing sanitary inspection chamber exists near the Eco
Cabin development. Survey levels demonstrate a chamber depth of 2240mm. Proposed Eco Cabins and
walkways are elevated at high level above natural ground. There is ample opportunity to suspend
elevated sanitary drainage, on grade , from the floor framing and supporting structures below the cabins
and boardwalks. Subject to any final built form constraints, the alternative would be to install a compact
proprietary macerator pump, in duplicate, for every two cabins also considered in the preliminary design.
The attached drawings H-102 (refer to ATTACHEMNET E) provides indicative concept planning for
sanitary drainage and includes a mix of in-ground and elevated sanitary drainage, plus compact packaged
pump stations and rising mains.
MRP Consultants have confirmed the existing provisioned 150mm sanitary drain is suitably sized to
accommodate the fixture unit loading from the additional 15 cabins.
Conclusion: Based on the above, it is confirmed that a compliant firefighting water supply and sanitary
drainage can be provided without significant impact to the vegetation and trees identified for protection.
The hydraulic drawings for construction are included in ATTACHMENT E.
6
Construction and Tree Management Plan - REV03 Page 58 of 45
Page 16
6.6 POST-CONSTRUCTION
6.1. Site Demobilisation
Post Stage 3 Carpark and Road completion, the remaining Site Set-up and Contractors' facilities will be
removed from the site, this could include the removal of:
o Construction site offices and amenities.
o Laydown Areas.
o Site Fencing; and
o Tree Protection Fencing.
Removal of all temporary utilities and the connection of permanent services to council systems.
6.2. Environmental Rehabilitation and Landscaping
Post site demobilisation, the rehabilitation of all impacted areas to be completed.
Guidance will be available from the project arborist and ecologist.
All works are to be completed as detailed by the site-based rehabilitation and landscaping plans.
Monitoring and reporting by contractors and the project ecologist regarding the rehabilitation progress.
6.3. Post Construction Arborist Report
A Post Construction Arborist Report will be prepared by the Project Arborist for the retained trees. A Visual
Tree Assessment will be carried out detailing each tree's condition and vigour, damage or disturbance
which may have occurred, and remedial works undertaken.
The Project Arborist may at any time implement new or additional procedures as may be required for the
site in the best interest of the trees and the development as a whole.
6.4. Hand-Over Documentation
After the final inspection, a Certification of Compliance shall be supplied by the Project Arborist for the
retained trees along with any monitoring or deviation documentation as required.
Detailed instructional information will be handed over to the resort management team to ensure the
ongoing site maintenance and protection measures.
This will then be included in the RACV Resort’s current and ongoing tree maintenance strategy including
the Native Foresters’ Weed & Rehabilitation Management Plan.
Construction and Tree Management Plan - REV03 Page 59 of 45
Page 17
7.6 ONGOING TASKS
These tasks are identified as ongoing through all stages - PRE-CONSTRUCTION, CONSTRUCTION, and POST-
CONSTRUCTION.
7.1. Collaboration:
Throughout the project process, close collaboration will be maintained between the project manager, architect,
contractor, project arborist, and project ecologist. Regular site meetings will ensure construction processes and
facilities are located and constructed with minimal impact on the retained trees and ecology.
7.2. Exclusion Zones:
Access to the Exclusion Zones is prohibited or restricted to those with permission. The site project arborist is
required to attend the site when works are to be undertaken that may affect trees or their roots which are being
protected. The project arborist shall oversee, advise and assist as and where required. Details of any works
carried out are to be recorded by the project arborist and made available upon request and or in accordance with
the approval conditions. If access is required within the Exclusion Zones, the project arborist is required to be
informed and actions agreed upon and permission gained before access.
7.3. Site Vegetation Monitoring:
Site monitoring and auditing will be conducted throughout the construction timeframe. The project arborist will
conduct regular site visits and maintain communication with the contractor to ensure proper tree protection
measures are being implemented and maintained.
7.4. Weed & Rehab Management:
Continue weed management and begin rehabilitation works around completed cabin sites.
Regular inspections conducted by the project ecologist.
7.5. Environmental Protection Measures:
These measures will focus on preserving the natural environment, protecting sensitive ecosystems, and
complying with local environmental regulations.
Erosion and sediment control measures, such as silt fences, sediment traps, and temporary revegetation, will be
implemented to prevent soil erosion and water pollution.
Stormwater runoff will be managed to prevent erosion and pollution of nearby water bodies.
A waste management plan will be implemented to minimize waste generation and promote recycling and proper
disposal.
Construction and Tree Management Plan - REV03 Page 5 of 45
Page 18
ATTACHMENT A – RACV APPROVED PROJECT PLAN Construction and Tree Management Plan - REV03 Page 5 of 45
Page 19
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
B 24/10/22 DA RFI ZT
C 28/10/22 DA RFI ZT
D 10/11/22 DA RFI ZT
E 15/11/122 RFI ZT
F 02/12/22 RFI ZT
G 05/12/22 RFI ZT
H 18/05/23 RFI RESPONSE TB
I 30/06/23 RESPONSE TO 2ND RFI ZT
J 20/07/23 BIO-RETENTION UPDATE ZT
K 22/08/24 DA PACKAGE ZT
L 23/08/24 DA PACKAGE ZT
/27 M
N
03/09/24
06/09/24
DA PACKAGE
DA PACKAGE
ZT
ZT
O 30/04/25 DA PACKAGE ZT
P 15/05/25 DA PACKAGE UPDATE JM
&$53$5.6
&$%,1
P:,'(%86+),5($66(7
3527(&7,21=21( (07;
(07%
%,25(7(17,21 &$%,16
/27
%8
,/'
,1*
6(
7 %$
&.
&$%,16 &$%,16
(07$
&$%,16
&$%,16
&$%,16
/(*(1'
(;,67,1*75((6
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
&$%,16
%8,/',1*'(6,*1(56
$662&,$7,21
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
%8 IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
,/
',
1* CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
6 COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
(7
%$ DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
& NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
. PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
@
142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
DRAWING TITLE
'$,668(
SITE PLAN
DATE SCALE @ A1 DRAWN CHECKED
1
15/05/25 1 : 250 ZT CD
DRAWING No. ISSUE
210910_ A10-01 P
15
[OCR of page images]
IMPORTANT.
ae
fy i
-
\ I x a
i
ee
AUN
~ |
\23
Ly
=
Beene EN CABINS 14.6 19
"ABIN 1]
CABINS 2 & 3} c y
CABINS 10 & 11}
CABINS 48.5
SS
[CABINS 2g
LEGEND
ASPECT
TOOWOOMBA | RISEANE| NOCLOOLABA
‘wun aspecapet
AB OT Te ME ACNOTY 76948
ona 87
e
EXISTING TREES
°
CABINS 657]
[RACV NOOSA RESORT - ECO
he RESORT
IROYAL AUTOMOBILE CLUB OF
4 lvicTORIA
142 NOOSA DRIVE, NOOSA HEADS
lou 4867
sme PLAN
“4 7 ae SEER aan DET
jsioszs1:250 ZT _ cD
l2109 1 Pp
DA ISSUE
1250
————————
on? ts eo 2
Page 20
ATTACHMENT B – TREE RETENTION vs TREE REMOVAL PLAN 6 Construction and Tree Management Plan - REV03 Page 5 of 45
Page 21
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
P 29/07/24 SITE PLAN REVISION ZT
Q 31/07/24 SITE PLAN REVISION ZT
R 5/08/24 SITE PLAN REVISION ZT
S 16/08/24 BIO BASIN REV ZT
T 19/08/24 SITE PLAN REVISION ZT
U 20/08/24 SITE PLAN REVISION ZT
V 22/08/24 DA PACKAGE ZT
W 23/08/24 DA PACKAGE ZT
X 03/09/24 DA PACKAGE ZT
S Y 06/09/24 DA PACKAGE ZT
Z 7/10/24 JER 1 ZT
AA 18/03/25 REVISION ZT
BB 2/04/25 REVISION ZT
CC 3/04/25 MEDIATION REVISION ZT
S DD 30/04/25 DA PACKAGE ZT
EE 08/05/25 DA PACKAGE UPDATE KP
FF 09/05/25 DA PACKAGE UPDATE JM
LOT 203 GG
HH
15/05/25
5/11/25
DA PACKAGE UPDATE
TREE RETENTION UPDATES
JM
ZT
S
II 24/11/25 SITE PLAN UPDATE ZT
JJ 2/12/25 SITE PLAN UPDATE ZT
S
10000
S
CABIN 1 S
(OVER)
10m WIDE BUSHFIRE ASSET S
PROTECTION ZONE
LEGEND
10000
NON KOALA TREES
KOALA TREES
RETAIN BIO-RETENTION CABINS 14 & 15
REMOVE
LOT 3
BU 600
ILD 0
ING
SE
TB
10000 AC
K
UNSUITABLE - RETAIN
CABINS 2 & 3 CABINS 12 & 13 2500
UNSUITABLE - REMOVE
APP
ALL SURVEYED TREES ON SITE (242)
RO
10000
X. L
0
2 50
OC
TREES RETAINED (139)
ATI
ON
CABINS 10 & 11
OF
TREES REMOVED (103)
ZO
NE
LIN
CABINS 4 & 5
E
KOALA TREES ON SITE (123)
KOALA TREES RETAINED (85)
KOALA TREES REMOVED (37)
TREE 51 (KOALA TREE) LOST DUE TO SERVERE
CABINS 8 & 9
WEATHER AS ADVISED TO NOOSA COUNCIL.
TOTAL SURVEYED KOALA TREES IN LOCALITY
KOALA TREES RETAINED (>200) TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
NOTES
TREE REMOVAL AND RETENTION UPDATED UNDER BUILDING DESIGNERS
ASSOCIATION
CONDITION 44(B) OF THE JUDGMENT, DATED 1 2 50
0 CABINS 6 & 7 GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SEPTEMBER 2025. SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
BU PERMISSION OF ASPECT .
IL 60
D IN 00 PROJECT
G
SE RACV NOOSA RESORT - ECO
TB
AC
K
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
@
142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
DRAWING TITLE
SITE PLAN - TREE RETENTION VS
DA ISSUE
REMOVAL PLAN
N DATE SCALE @ A1 DRAWN CHECKED
2/12/25 1 : 250 ZT CD
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 210910_ A10-07 JJ
Page 22
ATTACHMENT C – TREE PROTECTION PROCEDURES 6 Construction and Tree Management Plan - REV03 Page 5 of 45
Page 23
R AC V N O O S A
T R E E P R OT EC T I O N P R O C E D U R E S
E XECUTIVE S UMMARY
The RACV Noosa development project involves managing site vegetation by controlling invasive
frangipani vines and other weeds to protect the health of native trees and understory plants. The
client wishes to retain a treescape and enhance the understory to complement the natural
environment and guest experience.
Given the high number of trees to be retained, the traditional Tree Protection Zone (TPZ) approach
will be replaced with a strategy where construction occurs within the TPZ of allocated trees.
Defined construction and exclusion zones will be established to prioritize the care of retained
trees. The staged construction access will mainly follow the proposed raised boardwalk
alignments and cabin footprint areas from the rear to the front of the site. Throughout the
construction and preparation phases, there will be close supervision by a project arborist to
minimize disturbance to the trees.
The design focuses on a "light touch" approach. Dwellings will be built on pier foundations,
keeping the ground disturbance minimal and to minimise harm to tree root systems. Services will
be designed to avoid excavation and will be suspended under the dwellings and raised walkways.
The raised walkways will connect the units and start at the car parking area, providing access
while avoiding root zones. Support posts for the walkways will be flexible to allow for structural
root protection, with guidance from the arborist.
Design features for the units and required infrastructure have been considered for living amongst
the trees. These Tree Protection Procedures are to guide the construction team at the various
stages while the project progresses.
ABN: 68 153 548 531 | [email protected] | 0450 355 770
Page 24
1 B ACKGROUND
The original RACV Noosa development site surveys were undertaken between 2019 and 2022 to
record the trees in consideration of the proposed tourist accommodation project. Reviews of the
Health and Structure of trees were untaken by Consult Arborist in conjunction with Dr Justin
Watson on multiple occasions during June and July of 2024. A basic visual assessment was
undertaken from ground level with reasonable access available to most areas of the site and
trees.
To gain an accurate understanding of the treescape on the site, the detailed tree surveys involved
an assessment of each tree recorded from a ground level. The following data was recorded:
• Botanical Name & Common Name,
• Age Class,
• Health,
• Structure,
• Approximate size in meters - Height, Crown Spread, DBH at 1.4m
• Retention Value - awarded based on health, condition, age, and importance to the local
environmental community with a focus on consideration of Koalas.
• Comments were recorded relating to observations noted at the time of the inspection
including notes regarding the invasive Frangipani Vine, Chonemorpha fragrans, spreading
across the site and growing into many of the trees.
The trees are tagged and clearly numbered. CadCon surveyors accurately plotted the locations
of each tree at the project outset so that detailed plans with each tree's position could be
considered as part of the design.
The forest is a living entity that changes from day to day, and the status and condition of trees will
naturally alter over time, these elements need to be regularly reviewed to determine their ability
to continue to function as a safe, viable tree. The dominant species onsite is the Swamp
Mahogany, Eucalyptus robusta, which has a naturally regenerative canopy making it a suitable
species for this style of project. Canopy management will be required to facilitate the construction
and may be recommended at times to alleviate risk and/or manage the health of the tree.
The data recorded was compiled in updatable spreadsheets for analysis, 24_08_22_TREE
DATA_RACV_RevU_Plus_BioBF.xls. Koala trees were identified under the guidance of Dr William
Ellis and was recorded based on species only. The data gathered was used to provide the
necessary information to guide the Arborist Reports and advice and assist with the development
of the plans.
24_11_22_RACV Noosa_Tree Protection Procedures Page 2 of 11
Page 25
2 T REE P ROTEC TION G UIDELINES With the entire site being considered as a Tree Protection Zone, protection measures are to be put in place across the site. The information below is guided by the AS4970-2009 Protection of trees on development sites, industry best practices, and experience. It is designed to provide direction and information regarding the tree protection requirements. This advice is subject to change due to site conditions and the Project Arborist will advise of the best practices required onsite when the necessary site requirements have been confirmed. The information within these procedures is holistic for the site and can be incorporated into the different stages and/or locations of the project as required. It must be noted that trees are dynamic living organisms that respond to changes in their environs; repeat assessments are key to maintaining tree vitality, structural integrity, and reducing any potential risk that may arise. As such input and cooperation with the Project Arborist is essential as their environment changes. The successful retention of the trees will be bettered by the education and cooperation of all parties of the construction team during the build and the presence of the Project Arborist on site to assist and advise on tree protection or management before, during, and after, the construction phase for all works adjacent retained trees. ALL workers on the site are to be made aware of the Tree Protection Procedures and any site- specific safety measures by the main contractor prior to commencing works. 2.1 PRE-CONSTRUCTION A designated onsite foreman/supervisor from the construction company is to ensure that the Construction and Tree Management Plan is adhered to throughout the life of the project and maintain regular communication with the Project Arborist. Prior to any works commencing on the site, the Exclusion Zones shall be established as per the Construction and Tree Management Plan. The location of fencing/flagging is to be agreed with the Project Arborist and will follow guidelines set out in the section on Tree Protection Fencing. The creation of dedicated and delineated access pathways for the construction equipment and materials are to be established using Temporary Ground Protection procedures. Additional protection measures, including ground and trunk protection, are to be used where deemed necessary as the project progresses. 2.2 DURING CONSTRUCTION Access to the Exclusion Zones is prohibited or restricted to those with permission. The Project Arborist is required to attend the site when works are to be undertaken that may affect retained trees or their roots. The Project Arborist shall oversee, advise, and assist as and when 24_11_22_RACV Noosa_Tree Protection Procedures Page 3 of 11
Page 26
required. Details of any works carried out are to be recorded by the Project Arborist and made available upon request. If access is required within the Exclusion Zones, the designated person from the construction company is required to inform the Project Arborist and have the actions and permission agreed before entering. Any damage which is caused to the trees shall be reckoned to have been caused by the doer and they shall be liable for rectification. Where works are to be undertaken adjacent to retained trees the Project Arborist is to supervise and advise. Any machinery required by the site is to access the site on dedicated access routes as per the Construction and Tree Management Plan. Machinery is to be as small and lightweight as possible. 2.3 POST CONSTRUCTION A Post Construction Arborist Report will be prepared by the Project Arborist for the retained trees. A Visual Tree Assessment will be carried out detailing each tree's condition and vigour, damage or disturbance which may have occurred, and remedial works undertaken, in line with the approval conditions. After the final inspection, a Certification of Compliance shall be supplied along with any monitoring and/or deviation documentation as required. The Project Arborist may at any time implement new or additional procedures as may be required for the site in the best interest of the trees and the development as a whole. 24_11_22_RACV Noosa_Tree Protection Procedures Page 4 of 11
Page 27
3 T REE R EMOVAL AND C ANOPY M ANAGEMENT P ROCEDURES
To ensure retained trees are protected during the required tree removal and canopy management
operations, the following recommendations should be followed:
• Each individual tree for removal will be clearly marked by the Project Arborist with flagging
prior to commencement.
• The Project Arborist is to attend the tree works pre-start to provide guidance on the removal
operation with the nominated contractor.
• Trees are to be cross-checked against the Tree Retention and Removal Plan to ensure the
correct trees are removed.
• All tree removals and pruning are to be undertaken by qualified and experienced arborists,
both climbing and EWP where suitable.
• Cabin sites and boardwalk routes to be used for site access.
• Works to commence at the car park area located at the northern end of the site. This area is
to be used to process the tree material.
• No machinery is to be used to push over trees. Small machinery, if possible, can access
areas to remove timber and branches. Ground protection is to be used in non-Cabin site
areas, or close to retained trees.
• Trees are to be felled/dismantled away from retained trees and vegetation to avoid
unnecessary damage.
• If required due to direct conflict with construction, stumps are to be ground out to the required
depth.
• Retained trees on the edge of the final clearing limits and/or adjacent to future infrastructure
are to be assessed on the grounds of health and safety with additional tree works undertaken
as recommended by the Project Arborist. These works may include selective pruning,
removal of dead/defective branches targeting occupied areas and general pruning to promote
tree form and retention. All canopy management works are to be performed by suitably
qualified and experienced arborists.
• Tree removal and canopy management are to be undertaken in accordance with the relevant
ecology and fauna assessments and the presence of a qualified Fauna Spotter-Catcher.
• Any tree works required are to be guided by the concepts in Australian Standards AS 4373-
2007 Pruning of Amenity Trees, shall be supervised by the AQF level 5 suitably experienced
Project Arborist.
3.1 CANOPY MANAGEMENT
Canopy management requirements are assessed for each tree based on its age, condition, form,
and position within a site. Canopy management for mature and advanced aged trees can be
targeted at pruning to prevent hazards or reduce risk to an acceptable level whilst promoting a
sustainable future canopy and form or management of the natural environment adjacent
infrastructure and/or public amenity areas. It can also be undertaken to assist in the promotion of
new growth within the desired canopy form.
24_11_22_RACV Noosa_Tree Protection Procedures Page 5 of 11
Page 28
Suitable pruning techniques can be advised, including:
• The selective reduction of longer lateral branches to reduce end weight and length while
creating future growth points to sustain canopy growth and assist with natural canopy
retrenchment.
• Weight or sail reduction on defective branches or stems to suitable points rather than total
removal.
• The retention of longer stubs rather than collar cuts to promote response growth from
epicormic shoots.
• Mitigation of hazardous deadwood with minimal pruning or a reduction of weight to
preserve hollow sections or create habitat rather than the total removal of the branch.
The prominent tree species that will be adjacent to the new Eco Resort area at RACV Noosa is
the Eucalyptus robusta, Swamp mahogany. This species is, as its name suggests, robust, strong
and adaptable to pruning due to its naturally regenerative nature, particularly after storm events
or bushfires. Pruning of this species can stimulate this robust natural response. An example of
this regenerative response is illustrated in the records held by Consult Arborist for Tree 8 at RACV
Noosa. Tree 8, an advanced-aged tree that had survived multiple storm events was again badly
damaged during a storm event in spring of 2021. The engaged tree contractor undertook extreme
works to make safe the tree in the immediate aftermath. The tree has since been allowed to
naturally regenerate without interference and has created a new canopy which has allowed the
tree to be retained as a viable entity. The retention of Tree 8 rather than its immediate removal
was due to the commitment put in place by RACV to monitor the tree and undertake future works
as and when required.
Figure 1: January 2022 Figure 2: May 2024
24_11_22_RACV Noosa_Tree Protection Procedures Page 6 of 11
Page 29
4 T REE P ROTEC TION F ENCING Due to the nature of the RACV Noosa site, standard Tree Protection Fencing (TPF) will not be achievable throughout the site. The typical steel mesh panels are not suitable to create the Exclusion Zones internally but may be used for site perimeter fencing that can be incorporated into the tree Exclusion Zone setout. Exclusion Zone fencing is to consist of 1m high fabric orange mesh barrier fencing with star pickets with end caps as support, spaced at 4 – 5m and attached with zip ties in a fauna-friendly manner. Flagging is to be used on areas away from the site to demarcate 'no-go zones'. The photographs below show alternative options that are considered suitable. When the access and construction requirements have been established, the exclusion zones can be positioned for the trees to be retained and the alignment of the TPF can be determined. The TPF is required to be installed in the presence and under the guidance of the Project Arborist prior to any construction works commencing on the site and should remain intact until the completion of all works. As the entire site is considered a protected zone the TPF will be erected in a non-standard alignment with additional measures installed. Ground protection is to be installed specific to requirements. Trunk and branch protection, to prevent direct contact with the tree’s branch, trunk and/or buttress roots should be installed. This can comprise Geo fab or 20mm thick hessian and wooden battens strapped/taped to the tree’s trunk with a skirt over the buttress roots. These protection measures will be established between the construction company and the Project Arborist. 4.1 RESTRICTED ACTIVITIES WITHIN THE EXCLUSION ZONES Restricted activities within the Exclusion Zones that would cause harm to the retained trees include, but are not limited to: • Any non-approved construction works. • Any non-approved excavation or cultivation of the ground. • Any non-approved storage. • Preparation of chemicals, including cement products. • Parking of vehicles and plants. • Refuelling. • Dumping of waste. • Wash down and cleaning of equipment. • Placement of Fill. • Lighting fires. • Any non-approved soil level changes. • Temporary or permanent installation of utilities and signs. • Physical damage to the tree. 24_11_22_RACV Noosa_Tree Protection Procedures Page 7 of 11
Page 30
Figure 3: Fauna-friendly TPZ fencing in a natural area
Figure 4: Temporary exclusion zone Figure 5: Example of trunk protection
Figure 6: Tree Protection through natural bushland to create accessways
24_11_22_RACV Noosa_Tree Protection Procedures Page 8 of 11
Page 31
5 T EMPOR ARY G ROUND P ROTEC TION
Where access over the TPZ area is required during construction, site preparation is crucial to
minimise damage and disturbance to the ground in which the roots of the trees are growing.
These measures aim to reduce the compaction and disturbance to the soil, spreading the load of
machinery and preventing wheel/track ruts from site machinery. There is a range of measures
and materials that can be used to achieve this. The level of ground protection required is
determined by the load, actions, and frequency of access for works to be undertaken.
• 200mm of forest mulch placed over root zones where occasional, light access only is to
occur.
• Geotextile membrane can be laid on the surface with aggregate place on top to create
light vehicle access.
• Suitably thick rumble boards (e.g. pine sleepers) of a can be strapped together and laid
over the aggregate for additional load bearing capacity.
• For light rubber track/wheeled vehicles and or heavy pedestrian use, ground protection
mats are considered suitable.
• These temporary measures can be wholly removed when access is no longer required.
• The mulch can be reused and spread throughout the site.
Figure 7: Light vehicle ground protection Figure 8: Trak Mats, Image from
www.shorehire.com.au website
24_11_22_RACV Noosa_Tree Protection Procedures Page 9 of 11
Page 32
6 W ORK M ETHODOLOGIES A DJACENT T REES
Due to the restrictive nature of the site, a variety of methods and processes will need to be
incorporated into the project to ensure the retention and protection of the trees. The following are
examples and explanations of methodologies and processes that can be implemented when
working near retained trees.
As the construction methodology is to use support style structures and use the lay of the land,
excavation is expected to be minimal.
6.1 GENERAL EXCAVATION METHODOLOGIES
Excavations are predicted to be kept to a minimum. When excavations are necessary to improve
the levels for cabin constructions and the carpark and are being undertaken within a tree's root
zone, all necessary precautions are to be adhered to. The Project Arborist will advise on the
progression of the works and undertake root pruning as required.
• When using a mechanical excavator ground protection is necessary to minimise
compaction and damage to the surrounding ground.
• Spoil can be carefully extracted with a combination of a small bucket and ripper.
• General excavation is to be undertaken, when possible, with the bucket positioned
perpendicular to the tree, and the spoil dug away from the tree, this helps to minimise
roots being accidentally torn or fractured.
• Where possible, create a preliminary excavation and/or post-holes at the outer edges of
the required cut line using a Hydro-vacuum excavator. Roots found can be cleanly cut by
the Project Arborist. Once the preliminary cut line is completed excavation of the remaining
area outside the cut line can be dug using the appropriate attachment with all due care
and attention to the adjacent protected trees.
• Roots deemed to be pruned and removed are to be carefully cut using a sharp saw and/or
secateurs. Root removal is carried out by the Project Arborist on a root-by-root basis taking
into consideration the type of tree, distance from the cut to the tree, and the size and
number of roots found.
• Retained exposed roots are to be covered with hessian and if pedestrian or machine
access is required suitable ground protection should be used.
• Where possible excavations creating bare ground should be covered with the appropriate
material.
24_11_22_RACV Noosa_Tree Protection Procedures Page 10 of 11
Page 33
6.2 POST-HOLE DIG WORKS METHODOLOGY
• The Project Arborist is to be onsite to oversee and guide all works adjacent retained trees.
• A hydro-vacuum excavator (sucker truck) will create an exploratory post-hole to
approximately 1m inside the TPZ of retained trees to determine the presence of tree roots.
• Large roots over 100mm will be retained wherever possible with the post-hole relocated.
• Where roots between 50-100mm in diameter are located, the Project Arborist will assess
them on an individual and species basis and determine if relocating the hole is required
or if it is suitable for the Project Arborist to prune.
• Uncovered roots under 50mm in diameter will be cleanly cut by the Project Arborist.
• Once the positioning of the post-hole is confirmed, an auger can be used to remove the
remaining spoil to depth as the presence of roots below this level is unlikely.
• The excavator operating the augur is to be sat on protected ground to reduce ground
compaction. A combination of a larger machine with greater reach and a smaller mini
excavator (under 3.5 ton) can be used as appropriate.
• Pole-hole spoil is to be removed from the site.
• Turning and screwing of machinery tracks and wheels are to be kept to a minimum.
• The site is to be left clean of construction waste and the mulch and spoil are to be evenly
spread or removed as directed.
24_11_22_RACV Noosa_Tree Protection Procedures Page 11 of 11
Page 34
ATTACHMENT D - CONSTRUCTION MANAGEMENT PLANS Construction and Tree Management Plan - REV03 Page 4 of 45
Page 35
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 07/11/24 CONSTRUCTION STAGING JM
B 5/11/25 TREE RETENTION UPDATES ZT
C 17/11/25 TREE RETENTION UPDATES ZT
D 3/02/26 COUNCIL RFI ZT
S
S
LOT 203 SITE
S
ENTRY/EXIT
SITE TRAFFIC CONTROL
S
S
CONSTRUCTION &
SITE SETUP AREA S
TEMPORARY REMOVAL OF CENTRAL
10m WIDE BUSHFIRE ASSET S ROAD ISLAND FOR CONSTRUCTION
PROTECTION ZONE VEHICLE ACCESS
LEGEND
KOALA TREES
LOT 3 CONSTRUCTION
NON KOALA TREES
LAY DOWN AREA BU 600
RETAINED TREES ILD
ING
SE
0
TB
AC
K
TBC* CABINS 2 & 3
TEMPORARY
AMENITIES
TREES WITH EXTRA
PROTECTION ENVIRONMENTAL EXCLUSION ZONE FENCE
INDICATIVE LOCATION PROJECT ARBORIST /
APP
MEASURES ECOLOGIST TO DETERMINE
RO
(GREEN DASH)
X. L
OC
UNSUITABLE -
ATI
RETAINED TREES
ON
OF
NOTES
ZO
NE
LIN
PERIMETER SITE FENCE CABINS 4 & 5
TBC* - RETAINED WHERE POSSIBLE. SUBJECT TO
E
(BLUE)
DETAILED DESIGN AND ARBORIST ADVICE.
SITE FENCE
CONSTRUCTION SETUP AREA
MATERIAL LAY DOWN AREA CABINS 8 & 9
CONSTRUCTION ZONES
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
COMPLETED AREA
BUILDING DESIGNERS
ASSOCIATION
CABINS 6 & 7 GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
TEMPORARY CONSTRUCTION AMENITITES SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
TEMPORARY CONSTRUCTION ACCESS BU PERMISSION OF ASPECT .
IL 60
& GROUND PROTECTION ZONES D IN 00 PROJECT
G
SE RACV NOOSA RESORT - ECO
TB
AC
K
RESORT
FOR
INDICATIVE CONSTRUCTION SITE FENCING ROYAL AUTOMOBILE CLUB OF
VICTORIA
@
ENVIRONMENTAL EXCLUSION ZONE FENCE
INDICATIVE LOCATION PROJECT 142 NOOSA DRIVE, NOOSA HEADS
ARBORIST / ECOLOGIST TO DETERMINE QLD 4567
STAGE 1 CONSTRUCTION - INDICATIVE DRAWING TITLE
CONSTRUCTION MANAGMENT PLAN CONSTRUCTION METHODOLOGY
DA ISSUE
PLAN - STAGE 1
N DATE SCALE @ A1 DRAWN CHECKED
3/02/26 1 : 250 ZT CD
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 250907_ A10-20 D
Page 36
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 07/11/24 CONSTRUCTION STAGING JM
B 5/11/25 TREE RETENTION UPDATES ZT
C 17/11/25 TREE RETENTION UPDATES ZT
S
S
LOT 203 SITE
S
ENTRY/EXIT
SITE TRAFFIC CONTROL
CONSTRUCTION & S
SITE SETUP AREA
S
REDUCED SITE SETUP & LAY
DOWN AREA
CABIN 1 S
TEMPORARY REMOVAL OF CENTRAL
10m WIDE BUSHFIRE ASSET S ROAD ISLAND FOR CONSTRUCTION
PROTECTION ZONE VEHICLE ACCESS
MATERIAL LAY DOWN CABINS 14 & 15
AREA PER CABIN BUILD
LEGEND
KOALA TREES
LOT 3
NON KOALA TREES
BU 600
RETAINED TREES ILD
ING
SE
0
TB
AC
K
TBC* CABINS 2 & 3 CABINS 12 & 13
TREES WITH EXTRA
PROTECTION ENVIRONMENTAL EXCLUSION ZONE FENCE
INDICATIVE LOCATION PROJECT ARBORIST /
APP
MEASURES ECOLOGIST TO DETERMINE
RO
(GREEN DASH)
X. L
OC
UNSUITABLE -
ATI
RETAINED TREES
ON
CABINS 10 & 11
OF
NOTES
ZO
NE
LIN
TBC* - RETAINED WHERE POSSIBLE. SUBJECT TO PERIMETER SITE FENCE CABINS 4 & 5
E
(BLUE)
DETAILED DESIGN AND ARBORIST ADVICE.
CONSTRUCTION SETUP AREA
SITE FENCE
COMPLETE WORKS TO RAISED
MATERIAL LAY DOWN AREA CABINS 8 & 9 WALKWAYS & SERVICES
CONSTRUCTION ZONES
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
COMPLETED AREA
BUILDING DESIGNERS
ASSOCIATION
CABINS 6 & 7 GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
TEMPORARY CONSTRUCTION AMENITITES SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
COMPLETED EXTERIOR CABINS WITH IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
INTERNAL WORKS IN PROGRESS CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
TEMPORARY CONSTRUCTION ACCESS BU PERMISSION OF ASPECT .
& GROUND PROTECTION ZONES IL 60
D IN 00 PROJECT
G
SE RACV NOOSA RESORT - ECO
TB
AC
K
RESORT
FOR
INDICATIVE CONSTRUCTION SITE FENCING ROYAL AUTOMOBILE CLUB OF
VICTORIA
ENVIRONMENTAL EXCLUSION ZONE FENCE @
INDICATIVE LOCATION PROJECT 142 NOOSA DRIVE, NOOSA HEADS
ARBORIST / ECOLOGIST TO DETERMINE QLD 4567
STAGE 2 CONSTRUCTION - INDICATIVE DRAWING TITLE
CONSTRUCTION MANAGMENT PLAN CONSTRUCTION METHODOLOGY
DA ISSUE
PLAN - STAGE 2
N DATE SCALE @ A1 DRAWN CHECKED
17/11/25 1 : 250 ZT CD
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 210910_ A10-21 C
Page 37
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 07/11/24 CONSTRUCTION STAGING JM
B 5/11/25 TREE RETENTION UPDATES ZT
C 17/11/25 TREE RETENTION UPDATES ZT
S
S
LOT 203 SITE
S
ENTRY/EXIT
COMPLETE CAR PARKING
S & RAISED WALKWAYS
S
COMPLETE WORKS TO RAISED
CABIN 1 WALKWAYS & SERVICES
S
REINSTATE CENTRAL ROAD
10m WIDE BUSHFIRE ASSET S
PROTECTION ZONE
ISLAND WITH NEW LANDSCAPING
COMPLETE BIO- CABINS 14 & 15
RETENTION
LEGEND
KOALA TREES
LOT 3
NON KOALA TREES
BU 600
RETAINED TREES ILD
ING
SE
0
TB
AC
K
TBC* CABINS 2 & 3 CABINS 12 & 13
TREES WITH EXTRA
PROTECTION
APP
MEASURES
RO
X. L
OC
UNSUITABLE - REMOVE ENVIRONMENTAL EXCLUSION
ATI
ZONE FENCE & REHABILITATE ALL AREAS
RETAINED TREES
ON
CABINS 10 & 11
OF
NOTES
ZO
NE
LIN
TBC* - RETAINED WHERE POSSIBLE. SUBJECT TO REMOVE PERIMETER SITE FENCING & CABINS 4 & 5
REHABILITATE ALL AREAS E
DETAILED DESIGN AND ARBORIST ADVICE.
CABINS 8 & 9
CONSTRUCTION SETUP AREA
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
MATERIAL LAY DOWN AREA ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
BUILDING DESIGNERS
ASSOCIATION
CONSTRUCTION ZONES
CABINS 6 & 7 GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
COMPLETED AREA CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
BU PERMISSION OF ASPECT .
IL 60
D IN 00 PROJECT
G
SE RACV NOOSA RESORT - ECO
TEMPORARY CONSTRUCTION AMENITITES TB
AC
K
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
@
TEMPORARY CONSTRUCTION ACCESS
& GROUND PROTECTION ZONES
142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
STAGE 3 CONSTRUCTION - INDICATIVE DRAWING TITLE
CONSTRUCTION MANAGMENT PLAN CONSTRUCTION METHODOLOGY
DA ISSUE
INDICATIVE CONSTRUCTION SITE FENCING
PLAN - STAGE 3
N DATE SCALE @ A1 DRAWN CHECKED
ENVIRONMENTAL EXCLUSION ZONE FENCE 17/11/25 1 : 250 ZT CD
INDICATIVE LOCATION PROJECT DRAWING No. ISSUE
1:250
ARBORIST / ECOLOGIST TO DETERMINE 0 2 4 6 8 10 20 210910_ A10-22 C
Page 38
ATTACHMENT E – HYDRAULIC AND FIRE SERVICES CONCEPT DRAWINGS Construction and Tree Management Plan - REV03 Page 45 of 45
Page 39
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 07/11/24 CONSTRUCTION STAGING JM
S
PROPOSED NEW DUAL
PILLAR HYDRANT
S
EXISITNG FIRE
LOT 203 SITE
HYDRANT
S
ENTRY/EXIT
m
m
W
. 47 COMPLETE CAR PARKING
3
, 57 E E S & RAISED WALKWAYS
13 AD NC
IG IA
BR PPL
A
W
S
COMPLETE WORKS TO RAISED
CABIN 1 WALKWAYS & SERVICES
EXISITNG 100 mm WATER
7 mm
S
SUPPLY CONNECTION
W
10m WIDE BUSHFIRE ASSET S ASSEMBLY TO SITE. REFER
67.3
PROTECTION ZONE INSERT.
89,9
1
W 50 mm
W
COMPLETE BIO- CABINS 14 & 15 W
RETENTION W
EXISITNG FIRE
LEGEND HYDRANT
KOALA TREES
LOT 3
NON KOALA TREES
eFH EXISTING UTILITY
262.36 sq m
W
PROVIDER SEWER
RETAINED TREES BU
ILD
ING
600
0
PUMP STATION
SE
TB
AC
CABINS 2 & 3 K
TBC* CABINS 12 & 13
AIN W
KM
UNSUITABLE -
UN
RETAINED TREES
W
TR
APP
mm
RO
375
X. L
W
OC
NOTES REMOVE TREE PROTECTION ZONE
ATI
FENCING & REHABILITATE ALL AREAS
ON
SITE
CABINS 10 & 11
OF
TREE HEALTH ASSESSMENT (BY ARBORIST) UPDATED
W
ENTRY
ZO
AT REQUEST OF KOALA AND ECOLOGY EXPERTS . 129.37 sq m
NE
LIN
REMOVE PERIMETER SITE FENCING &
E
CABINS 4 & 5
W
UPDATED LAYOUT OF CABINS BASED ON REHABILITATE ALL AREAS
RECOMMENDATIONS FROM JERS AND UPDATED TREE
HEALTH ASSESSMENT.
W
RED DASH INICATES FIRE HOSE
TBC* - RETAINED WHERE POSSIBLE. SUBJECT TO PATH OF TRAVEL WITIHIN 90M
BETWEEN BRIGADE APPLIANCE AND
W
DETAILED DESIGN AND ARBORIST ADVICE. ENTRY OF MOST REMOTE CABIN.
CABINS 8 & 9
CONSTRUCTION SITE FENCING
W
CONSTRUCTION SETUP AREA INSERT: WATER
TREE PROTECTION FENCING
CONNECTION AT
W
BOUNDARY (EXTRACT TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
MATERIAL LAY DOWN AREA FROM HISTORICAL ABN 96 071 786 948 ACN 071 786 948
W
BOAQ 4487
DESIGN DOCUMENTS)
W
BUILDING DESIGNERS
ASSOCIATION
CONSTRUCTION ZONES
CABINS 6 & 7 GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
W
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
H-101 - FIRE HYDANT SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
COMPLETED AREA COVER CONCEPT
W
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
BU
PLAN. DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
IL 60
DI
W
PROJECT
NG 00
SE RACV NOOSA RESORT - ECO
TEMPORARY AMENITITES TB CONSULTANT: MRP HYDRAULIC CONSULTANTS
AC
K CONTACT: SIMON LYNCH
RESORT
FOR
W
DIRECTOR
TELEPHONE: (07) 5443 1000 ROYAL AUTOMOBILE CLUB OF
1/47- 49 OWEN CREEK ROAD, VICTORIA
CONCEPT DESIGN
@
3m WIDE CONSTRUCTION VEHICLE ZONE FOREST GLEN, QLD, 4556
W
142 NOOSA DRIVE, NOOSA HEADS
DATE: 12/11/2024 QLD 4567
STAGE 3 CONSTRUCTION - PROPOSED eFH DRAWING TITLE
TEMPORARY CONSTRUCTION ACCESS STAGING CONSTRUCTION METHODOLOGY
PLAN - STAGE 3
W
N DATE SCALE @ A1 DRAWN CHECKED
07/11/24 1 : 250 JM CD
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 21-0910_ A10-22 A
The text continues on page 40.
Used in these records
About this file
- File size
- 10.8 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.