Council archive · source document
Decision Notice - 010.2007.00001045.001 [As Published] · 132007.1045
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/1045 Date of Decision: 31 October 2007
1. APPLICANT DETAILS
Name: Middap Ditchfield Pty Ltd
Postal address: Cnr Mary & Thomas Streets
NOOSAVILLE QLD 4566
Phone no: 5474 0877 Fax no: 5474 0906
2. PROPERTY DESCRIPTION
Street address: 15 Duke Street Sunshine Beach
Real property Lot 201 RP 48113
description:
3. OWNER DETAILS
Name: Bomerah Qld Pty Ltd
Postal address: PO Box 9
NOOSA HEADS QLD 4567
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Material Change of Use Multiple Housing Type 2 Duplex No Yes
6. DECISION DETAILS
Council decided to approve the application and grant a Development Permit, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.
8. SUBMISSIONS
Not Applicable.
9. CONDITIONS
The approval is subject to conditions. Noosa Council’s conditions are attached.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 12
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Works Landscaping, carparking & access, frontage works,
stormwater drainage, site civil works and erosion & sediment
control
11. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
12. ASSESSMENT MANAGER
Name: Noosa Council Signature: Date: 2 November 2007
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 12
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Land Use
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are numbered SD 01A – SD 04A prepared by Middap Ditchfield Pty
Ltd and dated February 2007 and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter.
4. All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the
fencing setback 2 metres. The area of land between the fence and the front property boundary shall be
densely landscaped to screen any fencing from the street.
5. Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use. These landscape plans required
to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be
retained.
6. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
as open structures.
7. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
requirement.
8. Security in the form of a cash bond or trading bank guarantee to the sum of $10 000 must be submitted,
to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
operational works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
9. The requirements of this development approval are to be effected, prior to the use of the premises.
Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
compliance with conditions.
A. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for Building Works.
10. The Development Permit for a material change of use of premises lapses if the use has not happened by
31 October 2011, unless an application to extend the currency is approved by Council.
Building Services
11. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
damage and made safe to the standard required by the regulatory authority;
12. All infrastructure must be disconnected, capped or sealed including:-
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 12
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed to the
standard required by the regulatory authority;
13. All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
must be removed from the building and disposed of in accordance with industry best practice.
14. Waste generated during construction must be stockpiled in a centralised location and covered as required
to prevent material being blown onto adjoining properties including the road reserve or food waste from
generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
or via an approved waste receptacle and collection service. Storage areas are to be located near the
temporary access to the site so that access can be gained with out damage to infrastructure.
15. All building materials containing asbestos products must be disposed on in accordance with industry best
practice.
16. A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel;
17. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.
18. Sediment and erosion control measures must be placed on site prior to the works commencing and shall
be maintained until all works are complete. The erosion and sediment control measures shall be in
accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
Healthy Waterways (copy attached or available at www.healthywaterways.org).
19. All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines.
20. The transportation of all materials to and from the site must be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
shall be covered to prevent materials including dust being windblown from the vehicle.
21. A Waste Management Plan shall be submitted for the demolition to the Land Use Section of Noosa
Council, prior to the development permit for building works being issued. The Plan shall contain the
following information:-
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated volume (m³) On-site *specify Off-site *specify *Specify contractor
materials proposed reuse or contractor & & landfill site
onsite recycling recycling outlet
methods
Excavation material
Green waste
Bricks
Concrete
Timber – please
specify
Plasterboard
Metals – please
specify
Asbestos
Other – please
specify
NOTE: Details of site area to be used for onsite separation, treatment and storage (including weather
protection) shall be provided on the plan drawings accompanying your application.
Land Development
Vehicle Access
22. A vehicular access driveway to serve the development shall be constructed from the Duke Street frontage
of the site with a maximum width of 4.0m.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 12
23. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
without any step or level difference. Should any driveways be constructed to grades that do not comply
with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
24. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the
driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight
line requirements as defined in AS2890.1, section 3.2.4. The applicant shall demonstrate compliance by
illustrating these sight lines on the plans submitted for both Operational Works approval and Building
Works approval.
25. All vehicles shall enter and leave the site in a forward direction.
Car Parking
26. Carparking shall be provided within the site generally as shown on drawing number SD 01A dated 3/8/07
by Middap Ditchfield, except as modified herein.
27. A minimum of 1 uncovered carpark spaces and 2 covered carpark spaces shall be provided on site.
28. At least one open visitor carpark space shall be provided between the building and the front property
boundary of the site in a highly visible location, which shall not be restricted by gates, security screens or
other obstacles. The visitor carspace shall be located clear of the manoeuvring areas required to enter
and exit the carspaces located within the building.
29. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum
head clearance (headroom) at any point of 2.2m.
30. The proposed turning area and visitor carspace shall be setback a minimum of 0.5m from the northern
and southern boundaries of the subject site. This setback shall exclude any overhang from the visitor
carspace.
31. The proposed turning area shall be line-marked and sign posted to indicate that the area is a “Turning
Area Only” and that “No Parking is Permitted”. The type and extent of the linemarking and signage shall
be clearly shown on ay plans submitted for Operational Works approval.
32. All carparking shall be kept and maintained in a condition fit for use.
Frontage Works
33. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Duke Street
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
Grass shall be couch, free of weeds.
34. A new 1.5m wide concrete path shall be constructed along the Duke Street frontage of the site in
accordance with Council’s design standards and to an alignment that protects any significant vegetation
or any underground services.
35. All paths, driveways and parking areas shall be designed and constructed to ensure pedestrian safety
using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the
Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility.
36. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
prior to commencement of the use permitted by this permit.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 12
Roof Water & Stormwater Drainage
37. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 3000 litres per attached dwelling/unit) that is installed to ensure water from the tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All
rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
(QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
for Building Works / Operational Works approval and any overflow shall be directed to the stormwater
drainage system.
38. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
system in Duke Street. Plans of the drainage design shall be prepared by a Registered Professional Civil
Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second.
39. A grated drain shall be provided across the access driveway within the site adjacent to the street
boundary to collect runoff from the manoeuvring area and the access driveway.
40. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
41. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
42. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
43. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
44. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
45. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
served by:
A single Body Corporate water meter to measure the total water consumption (including fire hose reels,
but excluding fire hydrants and fire sprinkler systems), and
Individual water meters to each tenement capable of being separately rated, and
A fire service (fully testable single detector check with metered bypass), where applicable, for flows to fire
hydrants and fire sprinkler systems (excluding fire hose reels).
Earthworks
46. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses.
47. Excavation of the site and the construction of the proposed works shall not have any adverse affects on
the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
Registered Professional Engineer Queensland shall supervise the excavation of the site and the
construction of the new works to determine whether any additional measures are required to protect the
stability of adjoining buildings and/or structures and/or services and/or lands.
48. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that
border the development site. Fences that are affected shall be replaced prior to the Building Certifier
issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on
the plans submitted for Operational Works approval.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 12
49. Earthworks required on site shall be undertaken without the use of vibratory equipment and in a manner
that does not compromise the stability of the site or adversely impact on the adjoining buildings and/or
structures and/or lands.
50. An existing Conditions Survey shall be carried out on adjoining structures and buildings prior to any
construction works taking place on site. If distress already exists, a photographic survey shall be
undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
copy of this report is to be submitted to Council prior to the issue of operational works approval.
51. Certification of the completed works must be provided to Council by the supervising engineer. The
certification shall state that the completed works conform with all aspects of the design and that the
completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
and/or services and/or lands.
Site Stability
52. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
best suited for the proposed development. The recommendations of this report shall be incorporated into
the design and construction of the proposed development.
53. Should the recommendations of the geotechnical report require any part of the works (including
excavation, retaining structures, tie backs etc) to be temporarily or permanently constructed within any
adjoining property a letter of authority from the adjoining property owner shall be submitted to Council
prior to the issue of operational works approval.
Erosion and Sediment Control
54. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
55. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $2,974
PSP16 – Sewerage Headworks Contributions $3,303
PSP17 – Water Supply Headworks Contributions $4,659
PSP20 – Pathway Trunk Network Contributions $669
TOTAL Contribution Amount = $ 11,605
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from June 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council’s Land Development Commercial
& Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the trading bank guarantee will be returned.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 12
General
56. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work:-
Access and/or Carparking.
Site Civil Works.
Stormwater Drainage.
Frontage Works.
Erosion & Sediment Control
Landscaping
57. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. To avoid conflict with
underground pipes or services, all existing and proposed services required by the development shall be
shown on the plans.
58. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
59. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
60. The developer must provide waste storage and disposal facilities, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened from public places
and neighbouring properties.
61. Refuse containers must be provided in accordance with the requirements of the Environmental Protection
(Interim Waste) Regulation 1996 and (Waste Management) Regulation 2000, for the storage and
collection of refuse.
62. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in accordance
with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may
apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made –
From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
No audible noise for pool pumps apply during these hours.
From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
63. Submission of written certification from a suitably qualified person confirming that the noise levels from all
mechanical equipment comply with the cause above when measured at either the residential boundary or
outside the most exposed part of an affected building, whichever is the closest to the equipment.
The assessment and certification is required immediately after installation of the equipment and prior to
any occupation of the building, and in a format approved by Council. This assessment must take into
account noise from any other fixed equipment on the property e.g. swimming pool pump, heating/cooling
equipment, etc that may increase the overall noise level emitted.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 12
Advice: It is highly recommended that the person you engage to certify the installation is involved at the
plan development stage so they can recommend where this equipment is best located. They can also
advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more
costly to try and deal with noise problems after everything is built.
64. Noise from building works associated with residential development shall comply with the following –
64.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
64.2. All reasonable measures are taken to minimise noise emissions.
64.3. Not permitted on Sunday or public holidays.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 12
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The applicant is advised that development contributions and infrastructure charges applicable to this
development approval have been based on the following Uses Class/ Uses and applicable quantities:-
Existing Development Approved Development
Existing Use Class / Approved Use Class /
Existing Quantity Approved Quantity
Use Use
Multiple Housing - Type
Detached House 1 Dwelling 2 x 3 Bedroom Units
2 – Duplex
2. The applicant is informed that approval of this development application will trigger an Infrastructure
Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
amount of $1,036 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
June 2007 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with
Chapter 5 of the Integrated Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable method of
payment for development contributions conditioned in this permit or for infrastructure charge notices
issued separately.
4. Digital detailed designs including drawings, calculations, etc, shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works. In
this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
conjunction with any application for Operational Works. The design shall be in accordance with Council’s
Planning Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks.
5. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).
6. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
obtaining a Development Permit for Building Works.
7. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as amended)
and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the dwelling to the
pool enclosure is not permitted.
8. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.
9. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
works must be submitted to Council with the lodgement of any application for operational works over the
site.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 11
NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 12
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to
against the part of the approval that represents the
development applications
concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
(2) The appeal must be started within 20 business approval resulted from a development application
(superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day
if it were an application under a superseded planning
the decision notice or negotiated decision notice is
scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact
started at any time after the last day the decision on
assessment and code assessment, appeal rights for
the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Page 12
NOOSA COUNCIL IDAS Development Application Decision Notice 12 of 12
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
Used in these records
Decision Notice - 010.2007.00001045.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.