Original source · versioned page text
2020-07-13 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 JULY 2020
Page 10 of 33
GENERAL COMMITTEE MEETING AGENDA 13 JULY 2020
ATTACHMENT 2
UNITE & RECOVER ($2M ALLOCATION)
Boreen Point Campground amenities refurbishment, tank replacement 410,000
and groundwater treatment upgrade
Eenie Creek Road pedestrian bridge refurbishment 100,000
Lifeguard Tower renewals - Noosa West, Noosa Main Beach and 57,000
Sunshine Beach
Noosa Heads Sunshine Beach Road pathway lighting upgrade 150,000
(Transit Centre to Bicentennial Drive)
Noosa Regional Gallery refurbishment of foyer and amenities pe
Noosa Triathion Club clubroom alterations
Peregian Beach Boardwalk renewal (north of tower to access 57) Se
Playground renewals - Seagull Playground and Lake Macdonald 170,000
Playground
Public amenities renewals - Shire wide 220,000 o
Sunshine Beach Skate Park new shade structure 150,000
The J seating refurbishment 100,000 -
Tinbeerwah Hall cladding and roof renewals pm
United Synergies new amenities (laundry, shower and toilet facilities) 60,000
for at risk, vulnerable and homeless
Notes
1. Refer separate schedule for detailed breakdown
Page 10 of 33See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.