Original source · versioned page text
2020-07-13 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 JULY 2020
Page 7 of 33
GENERAL COMMITTEE MEETING AGENDA 13 JULY 2020
ATTACHMENT 1
WORKS FOR QUEENSLAND ($1.8M ALLOCATION)
Additional crisis accommodation for women and children leaving 250,000
domestic violence situations
(SHINE houses run by Salvation Army)
Community Halls and facilities maintenance - Shire wide 250,000 7
Cooroy Butter Factory (The Pottery Studio) security fence 10,000 pe
Cooroy Camphor Laurel Timber Initiative amenities replacement | 30.000)
Electrical Distribution Board renewals - Shire wide | 60.000)
Environmental Conservation Projects on Council Land/Reserves - 220,000
Shire wide
Noosaville Wallace Park pathways renewals 119,000 S|
Pathway Renewal Program - Shire wide | $82,000)
Pomona Memorial School of Arts Hall amenities upgrade 264,000 S|
Sunrise Beach Sobraon Street slope stabilisation | 128,000)
Tewantin Sports Complex building repair works 150,000
(former Navy Cadets Building)
Notes
1. Refer separate schedule for detailed breakdown
2. Funded from State W4Q ($125k) and Federal Local Rds ($790k)
Page 7 of 33See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.