Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Approval Package

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                                                                                                                                     Comment [DSP]: Page: 1
                                                 Form 6 – Negotiated Decision Notice                                                 Insert name and address of agency.
                                                                                                                                     Comment [DSP]: Page: 1
                                                 INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
                                                                                                                                     If refused, delete the section headed
                                                                                                                                     Referral Agencies
                                                                                                                                      Referral Agency         Address
            File No:       23116 DA            Date of Decision:         12 August 2004
                                                                                                                                     Comment [DSP]: Page: 1
                                                                                                                                     Insert Designer’s Name, Plan No. and
           1.       APPLICANT DETAILS                                                                                                Date of Plan.
                                                                                                                                     Comment [DSP]: Page: 1
            Name:                 SETTLERS COVE DEVELOPMENT PTY LTD
                                                                                                                                     Insert Yes or No in each column
            Postal address:       C/- RUSSELL RYTER - RYTER PLANNING PO BOX 5872 MAROOCHYDORE QLD 4558                               adjacent to each category.

            Phone no:             5479.4442                  Fax no:       5479.4447           Mobile:     0418 729707

           2.       PROPERTY DESCRIPTION

            Street address:       NONE SERENITY CLOSE

            Suburb/locality       NOOSA HEADS

            Real property         4SP100064 PARISH WEYBA COUNTY MARCH
            description:

           3.       OWNER DETAILS

            Name:                 R F THOMPSON PTY LTD

            Postal address:       UNIT 2 42 DUPORTH AV MAROOCHYDORE QLD                               Postcode:    4558

           4.       REFERRAL AGENCIES

            Referral Agency               Address                                                     Basis

            Nil

           5.       APPLICATION TYPE

            Development                               Development Details                    Preliminary          Development
                                                                                              Approval               Permit

            Material Change of Use                    33 Dwelling Houses & Open                  NO                    YES
                                                      Space

            Lot Reconfiguration                       33 Residential Allotments plus             NO                    YES
                                                      park

           6.       DECISION DETAILS

           Council on 27 November 2003 decided to approve the application and grant a Development Permit, subject to
           conditions.
           In relation to representations made about the conditions of approval, Council on 12 August 2004 resolved to: -
           A.     Approve a change to Conditions 1, 2, 4, 7, 9, 14, 17.1, 17.2, 17.3, 18, 19, 20, 21, 22, 23, 24, 32, 33, 36, 42,
                  43, 48, 49, 52, 55, 56, 57, 60, 63, 65, 68, 73, 75, 79, 80, 81, 82, 84, 86, 87, 88.3, 92, 97, 135, 142, 146, 147
                  and 148;
           B.     Delete conditions 16, 25, 65.3, 93, 94, 95, 96, 126, 127, and 144;
           C.     Include one additional condition;
           D.     Refuse to change conditions 12, 16, 20, 22.3, 40, 85.2, 85.3, 88, 98, 105, 121, and 146 for the following
                  reasons:-




                                                                                                                                     Print Date: 26 February 2020, 3:13 PM
Log in to download the original file

Approval Package.pdf · 280 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 25 pages

Page 2

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                            2


                     Condition 12

                     The works proposed as part of this approval are significant and include major earthworks construction of
                     significant services as well as requiring vegetation protection. The $250,000.00 is considered reasonable
                     based on the scope of these works and could be progressively reduced as the works are completed. As this
                     is a sensitive site with a range of detailed conditions all securities should be in place prior to release of any
                     operational works approvals. This ensures works do not commence without the securities in place. The
                     security bond however will be returned in stages as works are completed.

                     Condition 16
                     It is not agreed to change the title of the Retained and Enhanced Vegetation area, as it is important future
                     residents, owners and mangers understand that this area has very important conservation and waterways
                     protection functions. The title ‘Retained and Enhanced Vegetation’ infers nothing about the special
                     environmental and conservation values of these areas.

                     Condition 20
                     The proposed covenant does not satisfactorily address and provide for the protection of the Private Open
                     Space Conservation & Waterways Protection area’s environmental values, with amendments required.
                     Condition 22.3
                     The fence is critical to the proper management and protection of these important areas in perpetuity. The
                     fence is intended to prevent future owners from extending their ‘horticultural landscapes’ into these areas of
                     native bushland.
                     Condition 40

                     Wallum froglets are only surviving in those parts of the wetlands where nutrients and pH are low. The parts
                     affected by impacts form ‘external catchments’ are no longer Wallum froglet habitat. The intent of this
                     condition is to ensure that this development does not adversely affect the remaining areas of Wallum Froglet
                     habitat
                     Condition 85.2

                     The proposed change is not supported as this monitoring is considered low cost and can be read by a field
                     multi-meter.

                     Condition 85.3

                     The proposed change is not supported, as this monitoring is considered to be standard monitoring
                     requirements. Sewerage lines on site can overflow, and excess nutrient runoff\ can lead to algal blooms.

                     Condition 98

                     The applicants traffic engineer, Council’s traffic engineer, and Land Development staff all agree that it is
                     necessary to close off Banksia Avenue as a result of the proposed development.

                     It is also considered necessary to provide a turnaround facility as the closure of Banksia Avenue will prevent
                     vehicles within Grant Street from being able to head south. That is, entry onto Noosa Drive from Katharina
                     Street will be limited to left turn only (north), and entry onto Noosa Drive via Banksia Avenue - Jan Street -
                     Coral Tree Avenue (where vehicles can currently turn right to head south) will be closed off. Accordingly, it is
                     paramount that this turning facility be provided so that traffic can gain access back onto Noosa Drive where
                     they can turn right at the existing roundabout.
                     In terms of utilising moneys contributed by the applicant in the past – this money has already been spent in
                     accordance with the rezoning approval that the money was required under. That is, the applicant paid the
                     money in order for the land to be rezoned and gazetted to Residential B (now referred to as the Residential
                     High Density Zone) and Council carried out upgrading works in both Banksia Avenue and in Grant Street in
                     preparation for the intended development at that time. The fact that the applicant did not proceed with the
                     development is irrelevant as both parties complied with the condition – one rezoning the land, the other
                     improving the roads.
                     Condition 105
                     The bond of $50,000 is considered reasonable considering the extent of damage that could occur to
                     Council’s roads and the cost to repair any damage.



               H o:\database\onestop\decision.doc


                                                                                                                  Print Date: 26 February 2020, 3:13 PM

Page 3

Noosa Council documents




           NOOSA COUNCIL IDAS Development Application Decision Notice                                                               3


                  Condition 121
                                                                                                                                          Comment [DSP]: Page: 2
            Although it is agreed that no headworks contributions should be paid for the Residential High Density component               Type name of officer signing
                of the development (23118DA) - as this was paid in May 1982 as part of rezoning that portion of the land - it
                is not agreed to change this condition as no contributions have ever been received over this component of
                the site. That is, the old rezoning approval and contributions paid under that approval did not relate to this
                component of the site, they related to the Residential High Density component only.

                 Condition 146
                 The wording as it currently stands is correct and the condition should not be changed.

           7.        APPLICABLE CODES

           The developer must comply with the following codes for self-assessable development related to the development
           approved under this Development Permit:-
           Not applicable.

           8.        SUBMISSIONS

           Thirteen (13) properly made Submissions were received.

           9.        CONDITIONS

           The approval is subject to conditions. Noosa Council’s conditions are attached

           10.       FURTHER DEVELOPMENT PERMITS REQUIRED

               Type of Development Permit required                  Subject of the required Development Permit

                                                                    Access and/or carparking, Site Civil Works, Roadworks,
               Development Permit for Operational Works             Stormwater Drainage, Frontage works (including path
                                                                    construction), Sewer reticulation including new mains,
                                                                    relocations, diversions, pump stations and rising mains, Water
                                                                    reticulation, Site Filling, Excavation of materials to fill another
                                                                    site, Landscaping, Ecological Restoration.

           11.       RIGHTS OF APPEAL

           Rights of appeal in relation to this application are attached.

           12.       ASSESSMENT MANAGER

               Name:       Noosa Council                Signature:                                          Date:    20/08/04




           DECISION NOTICE HISTORY
           •     Original Decision Notice 27/11/03.
           •     Negotiated Decision Notice with amendment to
                 Conditions 1, 2, 4, 7, 9, 14, 17.1, 17.2, 17.3, 18, 19,
                 20, 21, 22, 23, 24, 32, 33, 36, 42, 43, 48, 49, 52, 55,
                 56, 57, 60, 63, 65, 68, 73, 75, 79, 80, 81, 82, 84, 86,
                 87, 88.3, 92, 97, 135, 142, 146, 147 and 148, and
                 deletion of conditions 16, 25, 65.3, 93, 94, 95, 96,
                 126, 127, and 144 and inclusion of one additional
                 condition          12           August           2004.




           H o:\database\onestop\decision.doc




                                                                                                                                          Print Date: 26 February 2020, 3:13 PM

Page 4

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                  4




                                                          Noosa Council Conditions
                                                          INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


                         Material Change of Use
                         Land Use

                         1.        Development undertaken in accordance with this approval must generally comply with the approved
                                   plans of development. The approved plans are numbered 1128 RSU OA Amendment A dated 23
                                   July 2004 and 881128/C dated 23 July 2004 all prepared by Ken Hicks & Associates and as may
                                   be amended by these conditions.

                         2.        All development of the site including dwelling houses, outbuildings and swimming pools shall be
                                   contained in the areas detailed as ‘Selective Clearing’ and not encroach into any areas detailed
                                   ‘Retained and Enhanced Vegetation Areas’ on the Vegetation Clearing Plan dated 23 July 2004.

                         3.        All dwelling houses shall not exceed 8 metres in height or 2 storeys from both natural and finished
                                   ground level as defined by the Planning Scheme. Earthworks shall be minimised and the design of
                                   the dwelling houses shall be sympathetic to the topography of the site. A preference shall be given
                                   to elevated lightweight construction.

                         4.        Each dwelling house shall have no more than 1 access driveway within the road reserve and
                                   through the Retained and Enhanced Vegetation not exceeding 4 metres in width and shall be
                                   constructed in accordance with Council’s engineering standards. To this end, the location of all
                                   driveways will have regard to any significant vegetation to the reasonable satisfaction of the
                                   Manager Land Development.

                         5.        Prior to the issue of a development permit for building works, the applicant/owner of any allotment
                                   is to seek the advice from a suitably qualified and experienced geotechnical engineer about slope
                                   stability. To this end, the applicant/owner shall comply with all recommendations as detailed by the
                                   engineer to ensure the risk of landslip is minimised and that erosion and sedimentation measures
                                   are addressed accordingly.

                         6.        The development must be undertaken and operated in a manner that causes no detrimental effect
                                   upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting
                                   nuisance or other emissions.

                         7.        Any fencing provided in conjunction with the development is to be contained within the ‘Selective
                                   Clearing’ area and clear of any ‘Retained & Enhanced Vegetation’ areas as nominated on the
                                   Vegetation Clearing Plan dated 23 July 2004 other than the acoustic fencing required for Lots 24-33
                                   adjacent to Noosa Drive.

                         8.        Where ENERGEX require provision of a pad mounted transformer, together with access, it is to be
                                   located on site and not within landscaped areas.

                         9.        Existing trees on the site and within road reserves are to be retained, except where required to be
                                   removed due to building operations, requirements of the Bushfire Management Plan and the
                                   Ecological Restoration Plan, or the conduct of the approved use. The 2 old eucalypt trees within the
                                   Banksia Avenue road reserve shall be retained and protected. The applicant is required to confirm
                                   the location of these trees with the Manager – Environmental Services prior to the commencement
                                   of any works.

                         10.       Any advertising sign or device is to comply with the provisions of Council's policies on advertising.

                         11.       All manholes, inspection pits and grates are to be raised to finished surface levels and kept free of
                                   cover and be visible at all times to ensure prompt access in case of emergency.




               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 5

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                5


                         12.       Security in the form of a cash bond or trading bank guarantee to the sum of $250,000 must be
                                   submitted, to secure performance of all conditions of this approval, prior to the issue of a
                                   Development Permit for Operational works. The cash bond or trading bank guarantee will be
                                   returned on performance of the conditions of approval less any costs incurred by Council in respect
                                   of enforcing performance of this permit.

                         13.       The requirements of this development approval are to be effected, prior to the use of the premises.
                                   Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to
                                   effect compliance with conditions.
                         Currency

                         14.       This Development Permit for a material change of use and reconfiguring a lot lapses if the
                                   reconfiguration has not been completed by 12 August 2008, during which time all conditions must
                                   have been complied with, operational works completed, and the Plan of Survey lodged with the
                                   Council for endorsement.

                         Environmental Health

                         15.       The area is in close proximity to vector breeding areas and the following conditions are required.

                                   15.1      All windows and doors of any dwelling constructed on the land shall be screened with
                                             mosquito-proof gauze not coarser then 1mm aperture to prevent the ingress of mosquitoes
                                             and midges.

                                   15.2      A notation shall be added to Council’s records whereby any applicant undertaking a
                                             health/property search is advised that this premises is located near major breeding areas of
                                             Mosquitoes and Biting Midge and may be subject to associated problems.

                         Environmental

                         16.       Deleted.

                         17.       The development over the subject site shall comply with the following:

                                   17.1      All necessary stormwater, erosion and sediment and water quality management and control
                                             devices shall be located within the development precinct. That is, areas shown as ‘Selective
                                             Clearing’ on the Vegetation Clearing Plan dated 23 July 2004.

                                   17.2      No development (other than approved fire breaks, any 4 metre wide driveway accesses and
                                             access paths and connections for services) shall be undertaken within areas of ‘Retained
                                             and Enhanced Vegetation’ shown on the Vegetation Clearing Plan dated 23 July 2004. The
                                             access paths to the fire trail apply to Lots 1-12 & 15 only and shall be aligned to avoid any
                                             significant vegetation, generally follow the route of the service connections, be constructed
                                             of pervious materials and be located to the reasonable satisfaction of the Manager Land
                                             Use. No access paths are permitted through the ‘Retained and Enhanced Vegetation’ of
                                             Lots 24-33.

                                   17.3      No clearing or removal of native vegetation (other than that specified in the Ecological
                                             Restoration Plan, the Fire Management Plan, the 4 metre wide driveway accesses, and
                                             service connections) shall be undertaken within areas of ‘Retained and Enhanced
                                             Vegetation’ shown on the Vegetation Clearing Plan dated 23 July 2004.

                                   17.4      The clearing of vegetation for the purpose of providing firebreaks shall not exceed 5 metres
                                             in width unless otherwise stated in an approved Fire Management Plan.

                         Management Plans

                         18.       The Applicant shall prepare various management plans that relate to the design, construction and
                                   operational phases of the development. These plans are to be prepared by appropriately qualified
                                   persons to the reasonable satisfaction of Council prior to any further approvals being issued, unless
                                   any other condition herein or in a subsequent development permit require otherwise.




               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 6

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                6


                                   The plans are to address specific matters detailed in the conditions of this approval. The plans to
                                   be submitted include:

                                   •         Environmental Management Plan

                                   •         Ecological Restoration Plan and Specifications

                                   •         Fauna Management Plan

                                   •         Landscape Master Plan

                                   •         Fire Management Plan

                                   •         Construction Management Plan (including Traffic Management Plan)

                                   •         Sediment and Erosion Control Plan

                                   •         Stormwater and Water Quality Management Plan

                                   •         Acid Sulphate Soils Management Plan

                         Fees Payable

                         19.       The Applicant shall pay Council all reasonable costs for the assessment of the management plans
                                   and also the costs associated with ensuring the development complies with the requirements of this
                                   approval. These costs shall be limited to a maximum of $30,000 including the cost of external
                                   consultants should they be required.
                                   The further approvals required to allow development to occur shall be subject to the fees contained
                                   in Council’s Fees and Charges Schedule.

                         Environmental Covenant

                         20.       An environmental covenant as defined by Part 6, Division 4A of the Land Title Act 1994, shall be
                                   registered in favour of Council on the title of any allotment having an area described by metes and
                                   bounds on Drawing No. 881128/C dated 23 July 2004, described as Private Open Space
                                   Conservation & Waterway Protection areas.

                         21.       The environmental covenant referred to in condition 20, shall cater for the requirements of the
                                   conditions of approval by protecting vegetation described as the ‘Retained and Enhanced
                                   Vegetation’ as shown on the Vegetation Clearing Plan dated 23 July 2004. The environmental
                                   covenants will allow for private driveways to be constructed (as detailed in condition 4) and access
                                   paths from Banksia Avenue to service allotments 1 to 14, access paths from the fire trial to service
                                   allotments 1-12 & 15 and connections to services.
                         Private Open Space for Conservation & Waterways Protection

                         22.       The area of the site known as the ‘Private Open Space for Conservation & Waterway Protection’
                                   area on Drawing No. 881128/C dated 23 July 2004, titled ‘Metes & Bounds Plan for Private Open
                                   Space for Conservation and Waterways Protection on Residential Single Unit (RSU)’, shall be:
                                   22.1        Managed to protect and reinforce its environmental values, particularly its Koala habitat
                                               and corridor values, Glossy Black Cockatoo habitat values, scenic amenity values and
                                               water quality protection function.
                                   22.2        Managed and maintained in accordance with the approved Environmental Management
                                               Plan, Fauna Management Plan, Fire Management Plans and Ecological Restoration Plan.
                                   22.3        Separated from the selective clearing area by a fence at least 1.2 metres in height (other
                                               than the 4 metre wide strip adjacent lots 1 to 14 and Banksia Avenue).. A gate may be
                                               permitted in the fence for access purposes pursuant to condition 17.2.
                                   22.4        Maintained by the owner.




               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 7

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                  7


                                   22.5        Protected from infrastructure, tracks, drainage, water control devices, etc. or other
                                               development, other than
                                               22.5.1       for lots 1 –15, a 4 m wide driveway access, an access path from Banksia
                                                            Avenue (Lots 1-14 only), an access path from the fire trail (Lots 1-12 & 15)
                                                            services and connections for services;
                                               22.5.2       for lots 24–33 a 2 m high acoustic fence on their boundary with Noosa Drive.

                                   22.6      Protected so that native trees and vegetation are not removed, pruned, lopped, damaged or
                                             otherwise adversely affected without written approval from Council’s Manager –
                                             Environmental Services (other than specified in the Ecological Restoration Plan and the Fire
                                             Management Plan, and as required for a 4 m wide driveway access, an access path,
                                             services and service connections to Lots 1–15 and the construction of a 2 m high acoustic
                                             fence on the Noosa Drive boundary of Lots 24 –33.

                         Public Parkland

                         23.       All lands described as ‘Park’ (excluding the Public Esplanade area) on the Vegetation Clearing Plan
                                   dated 23 July 2004 shall be dedicated to the State for park purposes pursuant to the Land Act at
                                   the time of reconfiguration.

                         24.       Prior to the dedication of any land to Council, or the State, the applicant shall ensure that:

                                   24.1      All the relevant specified actions in the Fire Management Plan and Fauna Management Plan
                                             are undertaken and completed.

                                   24.2      All environmental weeds shall be removed or treated and their reoccurrence controlled as
                                             per condition 41.

                                   24.3      All rubbish shall be removed.
                         Conservation Management Plan for the Conservation Land

                         25.       Deleted.
                         Vegetation Removal, Disposal and Protection in Development Precincts

                         26.       Vegetation protection, removal and disposal within the development precincts shall be undertaken
                                   in general accordance with the Fauna Management Plan by James Warren & Associates (dated
                                   May 2003) and the Vegetation Management Plan by Greening Australia (dated May 2003).

                         27.       Vegetation removal, tree felling and lopping shall be undertaken in an environmentally sensitive
                                   manner to avoid damaging surrounding vegetation, trees and habitat.

                         28.       Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos, possums). If
                                   wildlife species are present, the tree shall not be felled or lopped until the wildlife has left the tree.

                         29.       All cleared vegetation shall be suitably processed or removed from the site by a method approved
                                   by Council.

                         30.       Environmental weed species cleared from the site shall not be mulched. Vegetation material from
                                   environmental weed species shall be removed from the site and disposed of in a Council approved
                                   refuse tip.

                         31.       Burning off is not considered an acceptable means of disposal and is not to take place.

                         32.       During construction, the boundaries of areas of retained and protected vegetation of and adjoining
                                   the site shall be clearly marked for the purpose of preventing access into these areas thereby
                                   protecting the vegetation and habitat values.

                         33.       All underground services, drainage, footpaths, bikepaths, roads and other works shall be located to
                                   minimize adverse impacts on retained vegetation, particularly their root system.




               H o:\database\onestop\decision.doc


                                                                                                                        Print Date: 26 February 2020, 3:13 PM

Page 8

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                 8


                         34.       Vegetation and individual trees retained in development precincts shall be healthy and vigorous
                                   with an expected life span of at least 50 years. A risk assessment by a qualified arborist shall be
                                   undertaken on all individual trees and stands of vegetation to be retained within development
                                   precincts. An arborist’s written report shall be included in the relevant Operational Works
                                   applications.
                         Koalas and Koala Habitat Protection

                         35.       Koalas and their habitat require special protection and particular consideration shall be given to:

                                   35.1      The protection and restoration of koala habitat, habitat linkages and corridors on the site as
                                             shown on Figure 7 by Environmental Science and Services, dated October 2003.

                                   35.2      The protection and restoration of existing and new vegetation to facilitate Koala movement
                                             throughout the entire site.

                                   35.3      The protection of Koalas during the construction and operation phases of the development.

                                   35.4      The planting of additional koala food and habitat tree species as part of the landscaping in
                                             the development precincts.

                         36.       Known Koala habitat trees within development precincts shall be protected, unless specific
                                   approval exists for their removal or lopping or their removal or lopping would be necessary as the
                                   result of approved operational or building works.

                         37.       Rehabilitation/re-establishment of the Koala habitat and habitat links shown in Figure 7 by
                                   Environment Science & Services dated October 2003 within the site shall be given priority in the
                                   Ecological Restoration Plan and the Landscape Master Plan.

                         38.       All swimming pools provided for by any development shall have a rope installed to allow Koalas to
                                   exit the pool.
                         Glossy Black Cockatoos and their protection

                         39.       Glossy Black Cockatoos and their habitats require special protection and particular consideration
                                   shall be given to:

                                   39.1      The protection and restoration of Glossy Black Cockatoo habitat on the site.

                                   39.2      The protection of Glossy Black Cockatoos during the construction and operation phases of
                                             the development.

                                   39.3      The planting of additional Glossy Black Cockatoo food and habitat tree species as part of
                                             the landscaping in the development precincts.

                                   39.4      Rehabilitation/re-establishment of Glossy Black Cockatoo habitat within the development
                                             precincts shall be given priority in the Landscape Master Plan.

                                   39.5      Nesting boxes for cockatoos shall be installed on trees.
                         Wallum Froglets and their Protection

                         40.       Wallum Froglets and their habitat shall be protected. Particular attention shall be given to:

                                   40.1      The maintenance and protection of their prime habitat areas (eg. the wet heath, melaleuca
                                             wetlands and swamp mahogany wetland).

                                   40.2      Maintaining the low nutrient status of these habitats (eg. total nitrogen 0.34 mg/l and total
                                             phosphorous 0.035 mg/l).

                                   40.3      Maintaining the low pH environment of these habitats (eg. pH 3-5).




               H o:\database\onestop\decision.doc


                                                                                                                       Print Date: 26 February 2020, 3:13 PM

Page 9

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                 9


                                   40.4      Maintaining the structure and floristics and the plant communities that are habitat for
                                             Wallum Froglets.

                                   40.5      Maintaining and protecting the natural hydrological regimes and ecological processes that
                                             maintain the plant communities that are habitat for Wallum Froglets.

                                   40.6      The above information shall be incorporated into the various management plans required by
                                             this approval.
                         Weed and Pest Species Control

                         41.       Weed control shall be undertaken in general accordance with the Vegetation Analysis Report,
                                   dated December 2002, prepared by Greening Australia.

                         42.       All plants listed as environmental weeds by the Queensland Herbarium or listed as Undesirable
                                   Plant Species by Noosa Council shall be removed and/or treated as per condition 41 prior to
                                   reconfiguration.

                         43.       Prior to entering the site or the adjoining site, all construction machinery and vehicles shall be
                                   washed down to remove soil that may contain weed seeds, soil pathogens and pest species.

                         44.       All nursery stock shall be weed, pest and disease free and certified as such by the supplier. The
                                   certificates are to be obtained prior to the commencement of any landscaping works on site and
                                   shall be made available to Council upon request.

                         45.       All mulch produced on site by mulching cleared vegetation and trees shall specifically exclude
                                   material (particularly seeds) from environmental weed species (eg. lantana, asparagus and
                                   umbrella trees).

                         46.       Soil disturbance shall be kept to a minimum to avoid weed proliferation.

                         47.       The eradication and control of environmental weeds will be an integral part of both the Ecological
                                   Restoration Plan and the Landscape Master Plan. Vegetation used in restoration work and
                                   landscaping shall exclude environmental weed species.
                         Ecological Restoration Plan and Specifications

                         48.       An Ecological Restoration Plan and Specifications shall be prepared for the site by a specialist
                                   restoration ecologist, to the reasonable satisfaction of the Council. The applicant shall implement
                                   the Plan and Specifications. It shall identify all the areas designated as ‘retained and enhanced’
                                   vegetation within the site that require ecological restoration and specify actions and works
                                   necessary to result in robust, self-sustaining viable plant communities and habitat. (Note: The
                                   dense she-oak and wattle areas are a stalled seral stage of a Eucalyptus and Callitris open forest.
                                   These areas need special management to ‘kick-start’ the natural regeneration processes and
                                   enable the vegetation to develop into self-sustaining open forests. It is not just a matter of
                                   removing weeds and planting some trees.). The following, inter alia, shall be addressed and
                                   included in the Plan and Specifications:

                                   48.1      Document the current status of the areas requiring ecological restoration in terms of
                                             structure, floristics, missing elements, health, vigour, etc.

                                   48.2      Formulate structural and floristic models for the plant communities requiring ecological
                                             restoration.

                                   48.3      Specify the required works and actions for each area in terms of:

                                            ◊       site preparation (this may include thinning, removal of dense leaf litter, weed removal
                                                    and control, etc.),

                                            ◊       establishment of the missing floristic and structural elements,

                                            ◊       habitat creation and reinforcement for native fauna and reinforcement of habitat
                                                    linkages and corridors,




               H o:\database\onestop\decision.doc


                                                                                                                       Print Date: 26 February 2020, 3:13 PM

Page 10

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                10


                                            ◊       creating opportunities for regeneration from the seed bed, natural recruitment and
                                                    the establishment of wildlings,

                                            ◊       planting and mulching procedures,

                                            ◊       fertilizing procedures noting the low nutrient status of these ecosystems,

                                            ◊       watering procedures,

                                            ◊       protection from wildfire, particularly during the establishment phase,

                                            ◊       erosion and sediment control,

                                            ◊       on-going maintenance,

                                            ◊       environmental safeguards, and

                                            ◊       incorporation of the relevant requirements of all the management plans required by
                                                    this approval, particularly the Fauna Management Plan, Fire Management Plan, the
                                                    Environmental Management Plan.

                         49.       The Ecological Restoration Plan and Specifications shall include all parts of the site designated as
                                   ‘Retained and Enhanced Vegetation’ and the Road Reserve adjacent to Banksia Ave and Noosa
                                   Drive. This area is shown in green on the Vegetation Clearing Plan dated 23 July 2004.

                         50.       All the relevant ecological restoration works and actions shall be undertaken by the Applicant and
                                   completed prior to title being transferred from the owner to any of the future designated owners (eg.
                                   Council or the owners of the various individual allotments).
                         Fauna Management Plan

                         51.       A Fauna Management Plan shall be prepared to the reasonable satisfaction of the Council. The
                                   Fauna Management Plan shall be generally in accordance with James Warren’s & Associates
                                   Fauna Management Plan dated May 2003.

                         52.       The Fauna Management Plan shall specify the numbers and types of forage and habitat trees
                                   (particularly for Koalas and Glossy Black Cockatoos) to be planted in the ‘retained and enhanced’
                                   vegetation areas shown on the Vegetation Clearing Plan dated 23 July 2004 in the site. Particular
                                   attention shall be paid to the following areas:

                                   52.1      The Koala habitat connection across the wetland between the Residential High Density
                                             Development and the Residential Single Dwelling Development.

                                   52.2      The Eucalypts robusta koala habitat and corridor particularly adjacent to Residential Single
                                             Dwelling Development, allotments 1 to 7.

                                   52.3      Planting of Allocasuarina littoralis (for Glossy Black Cockatoos) also appropriate hollow
                                             developing trees throughout all areas of retained vegetation and areas to be rehabilitated.

                                   52.4      This information shall be included in the Ecological Restoration Specifications.

                         53.       Nesting boxes of a range of sizes shall be installed in nominated trees. The number, type, size,
                                   location and purpose of the nesting boxes is to be specified. The manner in which these nesting
                                   boxes are to be maintained shall be specified.

                         54.       The Fauna Management Plan shall specify actions that shall be undertaken to protect the Wallum
                                   Froglet population and its habitat.

                         55.       Consideration shall be given for the facilitation of fauna movement/linkages within an across the
                                   site when designing buildings and roads




               H o:\database\onestop\decision.doc


                                                                                                                        Print Date: 26 February 2020, 3:13 PM

Page 11

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                             11


                         56.       No domestic pets shall be permitted on the subject land during construction. Thereafter,
                                   domestic pets will be allowed with all cats and dogs kept in purpose-built cat or dog runs (eg. large
                                   caged or fenced areas).
                         Landscape Master Plan

                         57.       A Landscape Master Plan shall be prepared, to the reasonable satisfaction of Council, for the areas
                                   shown as ‘Selective Clearing’ on the Vegetation Clearing Plan dated 23 July 2004 and within any
                                   road reserve. It shall incorporate all the relevant requirements of all management plans required by
                                   this approval.

                         58.       The Landscape Master Plan shall detail the planting schemes and shall detail, inter alia:

                                   -      areas of natural vegetation to be retained;

                                   -      site preparation;

                                   -      habitat enhancement for native fauna;

                                   -      weed removal and control;

                                   -      species ‘palettes’ and schedules;

                                   -      planting out procedures and horticultural requirements;

                                   -      mulching procedures;

                                   -      fertilising procedures;

                                   -      irrigation and watering procedures;

                                   -      erosion and sediment control;

                                   -      on-going maintenance;

                                   -      construction materials and details;

                                   -      environmental safeguards.

                         59.       The Landscape Master Plan shall specifically acknowledge the aesthetic values of the site and
                                   demonstrate that they will be maintained and enhanced. In particular special consideration needs
                                   to be given to the integration of roads and pathways into the landscape setting. Landscaped areas
                                   shall be integrated floristically and structurally with the surrounding native vegetation.

                         60.       The owner shall prepare an environmental guideline for lot owners that:
                                   60.1     Explains the intent of the Open Space Conservation & Waterway Protection area and how it
                                            should be maintained and protected.

                                   60.2      Provides a landscape guideline for the balance area, which includes a list of indigenous
                                             plants for planting which will maintain the fauna habitat.

                         61.       The Landscape Master Plan shall address, inter alia, the following issues:

                                   61.1      Enhancement of environmental linkages and corridors.

                                   61.2      Enhancement and establishment of fauna habitat, particularly for Koalas and Glossy Black
                                             Cockatoos.

                                   61.3      Visual screening of buildings and visual integration of the built environment, particularly
                                             along Banksia Avenue.




               H o:\database\onestop\decision.doc


                                                                                                                     Print Date: 26 February 2020, 3:13 PM

Page 12

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                12


                                   61.4      The protection of the 2 old eucalypt trees within the Banksia Avenue road reserve.

                         62.       All detailed landscape plans for road reserve that is submitted for Operational Works approval shall
                                   comply with the Landscape Master Plan.
                         Fire Management Plan

                         63.       A Fire Management Plan shall be prepared for the site to the reasonable satisfaction of the Council
                                   and shall be implemented by the owner.

                         64.       The Fire Management Plan shall address:

                                   64.1      Fire management and protection within the development.

                                   64.2      Bushfire management and control in all the areas of Retained and Enhanced Vegetation.

                         65.       The Bushfire Management component of the Fire Management Plan shall be generally in
                                   accordance with the Bushfire Management Plan prepared by Greening Australia Queensland,
                                   dated May 2003. It shall incorporate recommendations for fuel reduction other than by fire. Further
                                   the Fire Management Plan will address:

                                   65.1      More detail on the treatment of paragrass in the watercourse between the development
                                             parts of the site.

                                   65.2      Provision of some fire hydrants on the proposed firebreaks, if required.

                                   65.3      Deleted.

                                   65.4      Clearing of firebreaks having a maximum width of 5 metres.

                         66.       The Fire Management Plan is to be implemented by the applicant and future owners of the site.

                         67.       The Fire Management Plan shall demonstrate a high level of environmental care and responsibility
                                   and be consistent with best practice for developments of this type in similar environments.

                         68.       A water point (eg. garden tap) shall be provided and located where each property abuts native
                                   bushland.

                         69.       The Fire Management Plan for the developed areas shall address, inter alia, the following:

                                   -      setback zones from retained native vegetation;

                                   -      access between structures and vegetated areas;

                                   -      proposed building construction methods, materials and designs to reduce fire risks;

                                   -      gutter treatments to avoid the collection of leaves and other fire-prone material;

                                   -      location of fire hydrants and water points;

                                   -      access for fire fighters and emergency workers;

                                   -      fire suppression and evacuation procedures;

                                   -      landscaping measures to reduce fire risk;

                                   -      owners and operators training and responsibilities;

                                   -      implementation procedures.

                         70.       The Fire Management Plan shall meet the provisions of the Queensland Fire and Rescue Authority
                                   Act 1990 and shall be endorsed by the Queensland Fire & Rescue Authority.



               H o:\database\onestop\decision.doc


                                                                                                                        Print Date: 26 February 2020, 3:13 PM

Page 13

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                              13


                         71.       The Applicant shall provide a bushfire information kit to purchasers of allotments on the site. The
                                   bushfire information kit shall be submitted to Council for approval as part of the Fire Management
                                   Plan.

                         72.       The Fire Management Plan shall incorporate all the relevant requirements of, and be consistent
                                   with, all the other management plans required by this approval.
                         Environmental Management Plan

                         73.       An Environmental Management Plan (EMP) shall be prepared and implemented to ensure that the
                                   impact of the development on the environment is minimised and that the environmental values of
                                   the site are protected and enhanced. The EMP is to:

                                   73.1      Comply with AS14000.

                                   73.2      Demonstrate a high level of environmental care and responsibility and be consistent with
                                             best practice for developments of this type in similar environments.

                                   73.3      Detail the applicant’s environmental policy and the proposed environmental management
                                             system for the site.

                         74.       The Environmental Management Plan shall specify to the reasonable satisfaction of Council: the
                                   performance targets, including those derived from the conditions and other requirements arising
                                   from legislation and other approvals;

                                   -      how the performance targets are to be achieved;

                                   -      when the performance targets will be satisfied;

                                   -      how performance will be monitored;

                                   -      corrective actions and contingency measures to be undertaken;

                                   -      reporting arrangements (including monthly reports to Council during construction);

                                   -      auditing arrangements;

                                   -      how the requirements are to be incorporated into construction and works contracts;

                                   -      how the developers employees, contractors and the contractor’s employees will be informed
                                          and trained with respect to the environmental protection requirements;

                                   -      enforcement; and

                                   -      penalties for non-compliance.

                         75.       The EMP shall apply to all works and activities on all areas of the site and adjacent road reserves
                                   (eg. all development, jetty construction and operation, etc.).

                         76.       In particular, but without limitation, the EMP shall address the following issues in relation to the
                                   construction and operational phases of the development:

                                   -      legislative compliance;

                                   -      vegetation protection;

                                   -      fauna and fauna habitat protection;

                                   -      aquatic ecosystem protection;

                                   -      weed control;




               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 14

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                    14


                                   -      pest control (particularly mosquitoes)

                                   -      soil erosion and sediment control;

                                   -      water quality protection;

                                   -      groundwater protection;

                                   -      air quality protection;

                                   -      acid sulphate soil management;

                                   -      storage and handling of hazardous substances;

                                   -      noise and vibration management;

                                   -      waste management;

                                   -      cultural heritage management;

                                   -      visual amenity protection;

                                   -      bushfire control;

                                   -      environmental emergencies;

                                   -      community liaison.

                         77.       The Environmental Management Plan shall incorporate the requirement for monthly environmental
                                   compliance monitoring and annual audit reports to be submitted to Council for the construction
                                   stages of the development. The format and content of these reports shall be in hard copy and
                                   digital form, generally in accordance with the following:

                                   77.1      Include tables of the monitoring results (digital form should be in Excel).

                                   77.2      Include individual charts plotting the results for all parameters required in the monitoring.

                                   77.3      Include a brief written discussion of the results and recommend any necessary actions.

                         78.       The Applicant and all future owners of the site shall comply with the EMP.
                         Sediment and Erosion Control Plan

                         79.       Detailed staged Sediment and Erosion Control Plans shall be prepared for the site, to the
                                   reasonable satisfaction of Council and implemented by the owner. The Plans shall be in
                                   accordance with the Institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil
                                   and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that document. The
                                   Sediment and Erosion Control Plans shall cover all development on site (during the construction,
                                   establishment and operational phases), ecological restoration and remediation works. All
                                   recommendations of the Plans shall be implemented.

                         80.       The Sediment and Erosion Control Plans shall also ensure the protection of the areas of ‘Retained
                                   and Enhanced Vegetation’ shown on the Vegetation Clearing Plan dated 23 July 2004 both on and
                                   external to the site, and shall:
                                   -         identify existing erosion problems, and
                                   -         specify appropriate remedial actions.

                         81.       All necessary erosion and sediment control devices shall be incorporated within the development
                                   precincts. That is areas shown as ‘Selective Clearing’ on the Vegetation Clearing Plan dated 23
                                   July 2004.
                         Stormwater and Water Quality Management Plan



               H o:\database\onestop\decision.doc


                                                                                                                           Print Date: 26 February 2020, 3:13 PM

Page 15

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                15


                         82.       A Stormwater and Water Quality Management Plan for the site shall be prepared to the
                                   reasonable satisfaction of the Manager, Land Development and implemented by the owner.

                         83.       The Stormwater and Water Quality Management Plan shall take into account matters specified in
                                   section 19.4 of the Environmental Protection (Water) Policy 1997.

                         84.       Key water quality objectives to be reflected in the Stormwater and Water Quality Management Plan
                                   are for the protection of aquatic ecosystems in the waterways, wetlands and wet heathlands of the
                                   site, areas adjoining the site, and the receiving waters of Noosa Inlet and the Noosa River. The low
                                   nutrient and pH environment of the wetlands and wet heathlands of the site and areas adjoining the
                                   site are the key factors in determining appropriate performance targets. Specifically, water quality
                                   objectives shall include the following performance targets, subject to the constraints of the
                                   catchments external to the site:
                                   -      Total nitrogen levels – 0.34 mg/l
                                   -      Total phosphorous levels – 0.035 mg/l
                                   -      pH – 4 to 5.

                         85.       The Stormwater and Water Quality Management Plan shall comply with and address, inter alia, the
                                   following issues in relation to the construction, establishment and operation phases of the
                                   development:

                                   85.1      All necessary stormwater treatment and water quality devices associated with the
                                             development shall be located within the approved boundaries of the RHD and RSD
                                             development precincts.

                                   85.2      During the construction phase, monthly water quality monitoring and monitoring after
                                             significant rainfall events (at least two per year) shall be undertaken for:

                                             ◊      suspended solids and turbidity,

                                             ◊      temperature,

                                             ◊      salinity,

                                             ◊      total nitrogen,

                                             ◊      total phosphorous,

                                             ◊      pH,

                                             ◊      trash and gross pollutants, and

                                             ◊      dissolved oxygen.

                                   85.3      During the establishment and operation phases, water quality monitoring shall be
                                             undertaken every third month and monitoring after significant rainfall events (at least two per
                                             year) shall be undertaken for:

                                             ◊      total nitrogen,

                                             ◊      total phosphorous,

                                             ◊      suspended solids and turbidity,

                                             ◊      pH,

                                             ◊      salinity,

                                             ◊      temperature,




               H o:\database\onestop\decision.doc


                                                                                                                        Print Date: 26 February 2020, 3:13 PM

Page 16

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                      16


                                             ◊         dissolved oxygen,

                                             ◊         trash and gross pollutants,

                                             ◊         algal count and identification, and

                                             ◊         faecal coliforms.

                         86.       The Developer shall continue this water quality monitoring for a period of 3 years from completion
                                   of the final stage of construction.

                         87.       In addition, the Developer shall undertake inspections for erosion and deposition, the build-up of
                                   trash and gross pollutants, and other water pollution. These inspections will be carried out every
                                   third month as well as after significant rainfall events, for a period of 3 years from completion of the
                                   final stage of construction.

                         88.       An operational phase Water Quality Management Plan shall be prepared to the reasonable
                                   satisfaction of Council and address water quality performance targets, water treatment devices,
                                   water quality maintenance, requirements for stormwater management measures and devices,
                                   contingency measures for aquatic plant growth, loss of vegetation in swales and filter strips,
                                   pollution response and algal blooms. It shall also include a mosquito management strategy. The
                                   plan shall demonstrate compliance with the prescribed water quality objectives.

                                   88.1      Responsibilities shall be clearly delineated.

                                   88.2      Non-compliance with prescribed water quality standards will trigger the implementation of
                                             measures to rectify the problem(s).

                                   88.3      Reports on monitoring, incidents, corrective action and plan updates shall be submitted to
                                             Council every three (3) months with Council being notified if any incident is recorded. These
                                             reports shall include information collected during the monthly monitoring program, shall
                                             highlight any non-standard results, and be submitted in a form acceptable to Council. The
                                             format and content of these reports shall be in hard copy and digital form, generally in
                                             accordance with the following:

                                             ◊      including tables of the monitoring results (digital form should be in Excel);

                                             ◊      include individual charts plotting the results for all parameters required in the monitoring
                                                    (digital form should be in Excel);

                                             ◊      include a brief written discussion of the results and recommend any necessary actions.
                         Water Quality Devices

                         89.       Water quality control devices shall be installed generally in accordance with the Stormwater and
                                   Water Quality Management Plan. Detailed staging plans and specifications, based on and
                                   generally in accordance with the Plan shall be prepared and submitted (after consultation with
                                   officers of the Council) with the relevant applications for operational works.

                         Drainage Works

                         90.       The Developer shall complete the drainage works progressively in conjunction with development of
                                   the site and generally in accordance with the approved Stormwater and Water Quality Management
                                   Plan. Detailed drainage plans and specifications, based on and generally in accordance with the
                                   approved Drainage Plan, the EMP and these Conditions, shall be prepared and submitted (after
                                   consultation with officers of the Council) with the relevant applications for operational works.

                         91.       All drainage works as required by the Drainage Plan shall be provided by the Developer at its own
                                   cost.




               H o:\database\onestop\decision.doc


                                                                                                                             Print Date: 26 February 2020, 3:13 PM

Page 17

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                               17


                         Acid Sulphate Soils Management Plan

                         92.       An Acid Sulphate Soils (ASS) Management Plan shall be provided for any excavation works
                                   undertaken in areas of the site and areas adjoining the site below 5 m AHD. The Management
                                   Plan shall outline all proposed ASS investigation and management procedures, to be undertaken in
                                   accordance with State Planning Policy 2/02 ‘Planning and Managing Development Involving Acid
                                   Sulphate Soils’. The applicant shall implement the Plan.
                         Reconfiguring A Lot

                         Roadworks

                         93.       Deleted.

                         94.       Deleted.

                         95.       Deleted.

                         96.       Deleted.

                         97.       Banksia Avenue shall be widened to a width of 8.0m kerb to kerb with the western side of the road
                                   (fronting the development) being provided with flush kerb. This 8 metre width shall extend south
                                   from (and include the intersection with Jan Street (in the vicinity of proposed Lot 2 & 3) to the point
                                   where Banksia Avenue meets with the new extension road off Banksia Avenue (referred to as
                                   Grosvenor Terrace on the proposal plans) in the vicinity of proposed Lot 15 & 33.

                         98.       Banksia Avenue shall be closed off (at the gully near Council’s Sewerage Pump Station) so that it is
                                   no longer a through road by providing two cul-de-sacs. This will involve providing a northern cul-
                                   de-sac / turning facility (similar to a roundabout) at the intersection with Grant Street (which will be
                                   utilised by traffic on the northern part of Banksia Avenue) and by providing a southern cul-de-sac on
                                   the southern side of this (which will be utilised by traffic on the southern part of Banksia Avenue to
                                   allow vehicles to turn around). Thereby creating an open space area between the two cul-de-sacs.
                                   This work shall include any improvements required to Banksia Avenue in order to complete the
                                   construction of the cul-de-sacs.

                         99.       The property boundaries of the site shall be amended (if required) to accommodate the proposed
                                   cul-de-sacs within the Council road reserve. To this extent the boundaries of the site shall be
                                   setback a minimum of 4 metres from the nominal face of the kerb and the affected land dedicated
                                   as road reserve.

                         100.      A 3 metre wide sealed service road (driveway) shall be constructed from the northern end of the
                                   southern Banksia Avenue cul-de-sac to Council’s Sewerage Pump Station.

                         101.      The short section of Banksia Avenue formed between Jan Street and the new southern Banksia
                                   Avenue cul-de-sac, shall be constructed to an Access Road Standard with a 6 metre wide
                                   pavement kerb to kerb in accordance with Council’s Engineering Design Standards.

                         102.      The new extension road off Banksia Avenue (referred to as Grosvenor Terrace on the proposal
                                   plans) shall be constructed to a minimum width of 6.5 metres kerb to kerb with the pavement design
                                   based on an Access Road standard in accordance with Council’s Engineering Design Standards.

                         103.      Grosvenor Terrace shall be designed to levels that minimise the extent of cut/fill whilst also
                                   minimising the grade of future driveways to individual allotments.

                         104.      As Banksia Avenue is likely to be damaged as a result of developing the site (from a combination of
                                   providing services across the road and heavy construction vehicles) a fresh AC overlay shall be
                                   provided to the road when nearing the completion of the development work.

                         105.      A detailed ‘condition survey’ and photographic record shall be prepared of the existing roads (Coral
                                   Tree Avenue, Jan Street & Banksia Avenue) and submitted to Council for approval prior to any
                                   construction works commencing. This information shall be accompanied by a $50,000 bond to
                                   ensure that the roads are not damaged as a result of construction works.




               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 18

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                              18


                         106.      The proposed names of new roads (public and private) and parks shall be lodged with the
                                   application for a Development Permit for Operational Works.
                                   Names are to be selected from any of the following categories:-

                                   106.1 Easily pronounced words of Murri languages.

                                   106.2 Names or words of local significance or historical interest.

                                   106.3 Flora, fauna, industry, topographical, geological and similar features and terms relative to
                                         the district.

                                   106.4 Surnames of persons of merit or historical significance.          (Personal names should be
                                         avoided.)
                                   Approval will not be given to a name that is the same or similar to the name of another road in the
                                   Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
                                   pronounced, or may cause confusion to emergency services are to be avoided.
                                   All street signs on new roads (public and private) and parks shall be erected prior to works being
                                   accepted on maintenance.

                         Roadworks Contributions

                         107.      A roadworks contribution of $86,431 towards the Coastal Major Road Network (based on 32
                                   additional allotments) shall be paid to the Council prior to obtaining a Development Permit for
                                   Operational Works. This amount will be subject to variations in the Price Index, All Groups Brisbane
                                   from June 2003 until the date of payment.

                         Access Driveways

                         108.      Only one access driveway is permitted to each lot and the maximum width of this access shall be
                                   no greater than 4.0 metres.

                         109.      Individual owners of the proposed lots shall be required to obtain a Development Permit for
                                   Operational Works for Driveway Access and a property note to this effect will be included on
                                   Council’s noting system.

                         110.      The absolute maximum grade for all access driveways is 1 in 5 (20%) and all driveways shall be
                                   designed to transition from the frontage road to the finished level of the allotment within the 6 metre
                                   building setback - to avoid long driveways that need to be either cut or filled in order to reach the
                                   finished level of the allotment.

                         Water Supply

                         111.      Each allotment (including parks) shall be connected to Council’s town water supply and be
                                   constructed in accordance with Council’s standards and requirements at no cost to Council. Any
                                   connection to a water main shall be undertaken by Council.

                         112.      Each water connection to the water reticulation system shall extend to the property boundary and
                                   be metered. All fees for the supply of water meters shall be paid to the Council.

                         113.      Fire hydrants are to be provided throughout the development in accordance with Council
                                   Engineering Design Standards and in accordance with Queensland Fire Service Standards.

                         114.      A new 100∅ water main shall be provided by the applicant along the eastern side of Banksia
                                   Avenue between the existing 100∅ water main located on the southern side of Grant Street (at the
                                   intersection with Banksia Avenue) and the existing 100∅ water main that currently terminates at the
                                   frontage of Lot 68 on RP92518 (#38 Banksia Avenue).

                         115.      The applicant shall construct a new 150∅ water main along the eastern side of Banksia Avenue
                                   extending in a southerly direction from the southern end of the existing 100∅ water main (located to
                                   the frontage of Lot 7 on RP90014, i.e. #14 Banksia Avenue) to the existing 375∅ water main in
                                   Noosa Drive.



               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 19

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                            19


                         116.      A Master Plan of the planned water supply works shall be prepared by the applicant and
                                   submitted to Council with the application for a Development Permit for Operational Works – Water
                                   & Sewerage.

                         117.      The applicant shall liaise with Council’s Water & Sewerage Section in order to prepare water supply
                                   plans and associated documentation.

                         118.      An underground electricity service shall be provided to each lot.
                                   In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
                                   Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
                                   The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
                                   submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
                                   Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council
                                   endorsing the Plan of Survey.
                                   Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
                                   wholly at the applicant’s expense and shall not entail a financial encumbrance on future purchasers
                                   of the proposed lots.
                                   Street lighting and pathway lighting throughout the subdivision shall have a high energy efficient
                                   rating to the reasonable satisfaction of Council.

                         Sewerage Reticulation

                         119.      Each allotment shall be connected to Council’s sewerage reticulation systems and be constructed
                                   in accordance with Council’s standards and requirements at no cost to Council. Connections to
                                   sewer system shall be carried out either by Council or by a Council approved Contractor and at no
                                   cost to Council.

                         120.      Designs for a sewerage system to connect all new lots within the site to Council's existing
                                   sewerage reticulation system shall be to the standards and requirements set out in Council’s
                                   Engineering Design Standards. If the design requires the construction of a pump station and a
                                   rising main, the connection point to Council's existing system will be nominated by the Manager -
                                   Land Development.

                         Headworks

                         121.      Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and
                                   PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions
                                   respectively and at the rates applicable at the time of payment. An estimate only of the contribution
                                   rates as of June 2003 under the current policies is as follows:
                                   Water Supply         $129,918
                                   Sewerage             $ 63,821
                                   TOTAL                $193,739
                                   All headworks contributions must be paid prior to Council endorsing the Plan of Survey. Each
                                   additional residential allotment shall be assessed as a dwelling house.

                         Electricity & Telecommunication

                         122.      An underground electricity service shall be provided to each lot.
                                   In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
                                   Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
                                   The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
                                   submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
                                   Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council
                                   endorsing the Plan of Survey.
                                   Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
                                   wholly at the applicant’s expense and shall not entail a financial encumbrance on future purchasers
                                   of the proposed lots.




               H o:\database\onestop\decision.doc


                                                                                                                    Print Date: 26 February 2020, 3:13 PM

Page 20

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                               20


                                   Street lighting and pathway lighting throughout the subdivision shall be provided in accordance
                                   with Council’s Engineering Design Standards, section 11.3.3 and to the satisfaction of Council.

                         123.      The requirements for TELECOMMUNICATION services shall be satisfied in relation to any existing
                                   services that currently traverse the site and for the provision of new telephone services to the
                                   proposed lots. In this regard written confirmation from an approved telecommunication agency
                                   shall be submitted to the Council prior to Council endorsing the Plan of Survey.

                         Services Generally

                         124.      Detailed design drawings and calculations shall be submitted with an application for a Development
                                   Permit for Operation Works in respect of water, sewer and stormwater works. To avoid conflict with
                                   other underground pipes or services, all existing and proposed services required by the
                                   development shall be shown on the plans.

                         125.      Conduits and kerb markers shall be installed for all necessary service crossings of roads to
                                   Council's satisfaction. An "As Constructed" plan showing the locations of the conduits shall be
                                   submitted to Council prior to acceptance of the works "On Maintenance".

                         126.      Deleted.

                         127.      Deleted.

                         128.      Any alteration of a public utility or other facility necessitated by the development of the land or
                                   associated construction works either internal or external to the site shall be at no cost to Council.

                         Service Easements

                         129.      Registered easements shall be provided on the Plan of Survey over all Council services within
                                   private property, such as water mains, sewerage reticulation pipes and stormwater drainage pipes.

                         130.      Water main easements shall generally be parallel to and centred over the water main and be
                                   equivalent in width to twice the depth to invert level of the main at the deepest point within the
                                   allotment (measured from the finished surface) and be no less than 3.0 metres wide.

                         131.      Sewer easements shall generally be parallel to and centred over the sewer main and be equivalent
                                   in width to twice the depth to invert level of the main at the deepest point within the allotment
                                   (measured from the finished surface) and be no less than 3.0 metres wide.

                         132.      An easement over a stormwater drainage pipe shall be sufficient in width to provide a minimum of
                                   1.5 metres either side of the designed drainage structure and shall have a minimum overall width of
                                   4.0 metres.

                         133.      Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of
                                   Easement shall be submitted to Council for perusal.
                                   Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
                                   Survey.
                                   Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
                                   endorsing of the Plan of Survey.

                         134.      Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor
                                   an appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the
                                   Land Titles Office, the Title Deed and the easement documents will also be lodged and any
                                   additional Titles Office forms or requisitions requiring the consent of Council being attended to
                                   forthwith.

                         Pedestrian Paths / Bike Paths

                         135.      A 2.0 metre wide meandering concrete path shall be constructed along the eastern side of Banksia
                                   Avenue. This path shall commence from Grant Street and continue to the south along the eastern
                                   side of Banksia Avenue, past Jan Street and down to the existing path that currently runs between
                                   the southern end of Banksia Avenue and Noosa Drive.



               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 21

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                                  21


                         136.      A 1.5 metre wide meandering path shall be constructed along the southern and eastern sides of
                                   the new extension to Banksia Avenue (referred to as Grosvenor Terrace) and shall extend to the
                                   narrow strip of road reserve proposed between Lots 23 & 24.

                         137.      In choosing the alignment of these paths care shall be taken to protect any significant vegetation or
                                   any underground services.

                         138.      Pram ramps shall be installed at intersections (and wherever else required) in accordance with
                                   Council’s Standard Drawing 9006.

                         139.      All paths and pram ramps shall be designed and constructed to ensure pedestrian safety using
                                   non-slip materials and to produce an evenly graded surface finish.

                         140.      A Development Permit for Operational Works shall be obtained prior to the commencement of any
                                   works.

                         141.      Where footpaths are located in cut or where site conditions indicate the presence of groundwater in
                                   proximity of the natural ground level, subsoil drains shall be constructed between the back of path
                                   and the property boundary.

                         142.      Prior to works being taken “On Maintenance”, the remainder of the footpath areas shall be topsoiled
                                   and established with couch free of weeds, where consistent with the Landscape Master Plan.

                         143.      The Applicant is advised, that to avoid damage being caused to these paths during the construction
                                   phase Council may consider accepting an Uncompleted Works Bond equal to 150% of the cost of
                                   providing the paths likely in the opinion of Council to be subject to damage from the further
                                   development of the site, in order to enable the Plan of Survey to be endorsed by the Council.

                         144.      Deleted.
                         Contributions to External Major Pathways

                         145.      A pathway contribution of $7,514.56 towards external major pathways, in accordance with Planning
                                   Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to
                                   obtaining a Development Permit for Operational Works. This amount will be subject to variations in
                                   the Price Index, All Groups Brisbane from June 2003 until the date of payment.

                         Earthworks

                         146.      Prior to excavating any material to be used for fill on this site or areas adjoining the site, a
                                   Development Permit for Operational Works shall have been obtained for the site or areas adjoining
                                   the site from which the excavated material is taken. A soil report shall be submitted with the
                                   application certifying that the material is free of acid sulphate soils and other deleterious materials.

                         147.      Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A.
                                   A registered practicing Geotechnical Engineer shall supervise the placement of all fill and shall
                                   certify that all lots/roads have been compacted to the required standard. To this extent Level 1
                                   supervision in accordance with AS3798-1996 is recommended.
                                   Any existing fill on the site or areas adjoining the site that does not comply with Council’s
                                   requirements shall be removed at the direction of the Manager - Land Development prior to
                                   additional filling works commencing.

                         148.      The transportation of all materials to and from the site or areas adjoining the site shall be
                                   undertaken in a manner such that no particulate matter escapes onto a public road. All vehicles
                                   carrying materials either to or from the site shall be covered to prevent materials including dust
                                   being windblown from the vehicle.

                         149.      Following completion of the filling works and prior to endorsement of the Plan of Survey, the
                                   registered practicing Geotechnical Engineer supervising the works shall submit compaction tests
                                   across the entire filled areas and a site classification report for each lot subject to filling. The extent
                                   of fill and each lot site classification shall be shown on a metes and bounds survey plan.




               H o:\database\onestop\decision.doc


                                                                                                                         Print Date: 26 February 2020, 3:13 PM

Page 22

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                               22


                                   An appropriate property notation shall be placed on Council's rates records to advise prospective
                                   purchasers of lots that have been filled that special foundations requirements will apply.

                         Construction Issues

                         150.      A Traffic Management Plan addressing all construction phases is to be prepared by a suitably
                                   qualified traffic engineer and submitted to Council for approval prior to any works commencing on
                                   site.

                                   The report should aim to address every foreseeable problem that is likely to occur during the
                                   construction process and include recommendation on how these can be overcome or minimised.
                                   Further, the report will address the public consultation to be undertaken in order to inform residents
                                   in the immediate vicinity likely in the opinion of Council to be affected by the works. The report shall
                                   be to the reasonable satisfaction of the Manager Land Development.

                         151.      A Construction Management Plan addressing all construction phases shall be prepared and
                                   submitted to Council for approval prior to any works commencing on site.
                         Engineering Issues

                         152.      A suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare
                                   engineering drawings and specifications for stormwater designs and shall be submitted in
                                   conjunction with an application for a Development Permit for Operational Works.

                         153.      All designs for engineering works involving the construction of pavements, kerb and channel,
                                   vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation
                                   shall be prepared in accordance with the requirements of Council's Engineering Design Standards,
                                   shall reference where applicable to Council’s Standard Drawings and shall incorporate best
                                   engineering practice.

                         154.      A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
                                   specifications for all engineering works, which shall be submitted in conjunction with an application
                                   for a Development Permit for Operational Works.

                         155.      Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil
                                   Engineer shall be submitted to Council for each Development Permit for Operational Works issued
                                   pursuant to this permit. The engineer shall certify that he has supervised those works and that they
                                   have been completed in a workman like manner in accordance with good engineering practice and
                                   in accordance with that permit.

                         156.      As Constructed drawings certified by a registered surveyor showing the extent and finished levels
                                   of all works are to be submitted for Council's records.
                                   These drawings must fully detail levels for all engineering works including water supply and sewer
                                   reticulation, drainage structures, building floor levels, finished ground levels effluent trenches and
                                   pavement surface levels. Drawings shall be on transparencies, a hard copy highlighting any
                                   changes from design and in electronic format on an IBM PC compatible floppy disk in a format
                                   capable of integration with Council’s computer system.
                                   Approval of works shall not be granted until as constructed drawings have been supplied and
                                   accepted by Council.
                         Survey

                         157.      Where existing road boundaries are less than 9 metres from existing or proposed road centrelines,
                                   or less than 3 metres from the toe or top of batters of existing or proposed roads, the lot layout shall
                                   be amended to provide sufficient land in road reserves to achieve these clearances.
                                   Where existing fences are within existing or proposed road reserves, they shall be removed and re-
                                   erected on the correct alignment. Any building or other structure erected within a road reserve shall
                                   be removed.
                                   Prior to endorsement of the Plan of Survey, the Applicant shall submit to Council a certification of
                                   compliance from a registered Surveyor.




               H o:\database\onestop\decision.doc


                                                                                                                      Print Date: 26 February 2020, 3:13 PM

Page 23

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                                            23


                         158.      Prior to endorsement of the Plan of Survey, a State Survey Mark shall be provided within the site.
                                   It shall be levelled and located to the requirements of Council’s Surveying Section. A ‘Form 6’ shall
                                   be submitted for Council's records.
                                   Each State or other Permanent Survey Mark shall be installed clear of overhead vegetation, making
                                   it suitable for Global Positioning Equipment, and accurately connected to at least one real property
                                   corner by a registered Surveyor.
                         General

                         159.      Alterations to lot sizes, number of lots and layout may be required following the issue of a
                                   Development Permit for Operational Works in respect of the internal roadworks design.

                         160.      In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
                                   documentation shall be presented to Council and shall be submitted in the correct form with the
                                   fees prescribed in Council's adopted fee schedule.

                         161.      Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and charges
                                   due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to
                                   endorsement of the Plan of Survey.

                         162.      A programme of works is to be submitted with any application for any Development Permit for
                                   Operational Works detailing the construction schedule and proposed environmental protection
                                   measures.
                                   Where the program is changed for any reason whatsoever, a copy of the revised program shall be
                                   submitted to Council’s Works Inspector within seven (7) days.

                         163.      The person acting on this permit shall apply and obtain for all other necessary permits including
                                   crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any
                                   other approvals required under any other Act.
               Additional Condition

                         164.      For the purpose of these conditions the “site” is the areas identified as lots 1-33, the areas shown
                                   as Park on the Vegetation Clearing Plan dated 23 July 2004 and the area shown as Park-Public
                                   Esplanade     on      the   Vegetation        Clearing     Plan      dated      23      July    2004.




               H o:\database\onestop\decision.doc


                                                                                                                    Print Date: 26 February 2020, 3:13 PM

Page 24

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                    24




               H o:\database\onestop\decision.doc


                                                                            Print Date: 26 February 2020, 3:13 PM

Page 25

Noosa Council documents




           NOOSA COUNCIL IDAS Development Application Decision Notice                                                                        25




                                                                 Appeal Rights
                                                                 INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

                The following is an extract from the Integrated                           (6) If an application involves assessment against a
                Planning Act (Chapter 4).                                              concurrence agency code, appeal rights for
                                                                                       submitters for the application are not available against
                Division 8 - Appeals to                   court     relating     to    the part of the approval that represents the
                development applications                                               concurrence agency’s response for the code.
                Appeals by applicants                                                  Appeals by advice agency submitters
                4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
                may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
                (a) the refusal, or the refusal in part, of a development              a development approval for a development
                    application;                                                       application if-

                (b) a matter stated in a development approval,                         (a) the development application involves impact
                    including any condition applying to the                                assessment; and
                    development, and the identification of a code                      (b) the advice agency told the applicant and the
                    under section 3.1.6;1                                                  assessment manager to treat its response to the
                (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
                    development permit was applied for;                                   (2) The appeal must be started within 20 business
                (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                                       decision notice is given to the advice agency as a
                (e) a deemed refusal.                                                  submitter.
                   (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
                be started within 20 business days (the “applicant’s                   (co-respondents)
                appeal period”) after the day the decision notice or
                negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                                       development application, a person to whom any of the
                    (3) An appeal under subsection (1)(e) may be                       following notices have been given may appeal to the
                started at any time after the last day a decision on the               court against the decision in the notice-
                matter should have been made.
                                                                                       (a) a notice giving a decision on a request for
                Appeals by submitters                                                      extension of the currency period for an approval;
                4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
                may appeal to the court about-                                             minor change to an approval.
                (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
                    any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
                    provisions of the approval; or                                     to the person.
                (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                                       approval resulted from a development application
                    (2) The appeal must be started within 20 business
                                                                                       (superseded planning scheme) that was assessed as
                days (the “submitters appeal period”) after the day
                                                                                       if it were an application under a superseded planning
                the decision notice or negotiated decision notice is
                                                                                       scheme.
                given to the submitter.
                                                                                          (4) Also, a person who has made a request
                   (3) If a person withdraws a submission before the
                                                                                       mentioned in subsection (1) may appeal to the court
                application is decided, the person may not appeal the
                                                                                       against a deemed refusal of the request.
                decision.
                                                                                          (5) An appeal under subsection (4) may be started
                   (4) If an application involves both impact
                                                                                       at any time after the last day the decision on the
                assessment and code assessment, appeal rights for
                                                                                       matter should have been made.
                submitters are available only for the part of the
                application involving impact assessment.                               Division 9 - Appeals to court about other matters
                    (5) If an application is processed under section                   Appeals for matters arising after approval given
                6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
                application are available only for the aspects of the
                development that would have required public                            4.1.31.(1) A person to whom any of the following
                notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                                       against the decision in the notice-
                1    Section 3.1.6 (Preliminary approval may override local planning   (a) a notice giving a decision on a request to change
                    instrument)                                                            or cancel a condition of a development approval.


           H o:\database\onestop\decision.doc                                                      20/08/04


                                                                                                                        Print Date: 26 February 2020, 3:13 PM

Page 26

Noosa Council documents




               NOOSA COUNCIL IDAS Development Application Decision Notice                                       26


               (b) a notice under section 6.1.442 giving a decision to
                   change or cancel a condition of a development
                   approval.
                   (2) The appeal must be started within 20 business
               days after the day the notice of the decision is given
               to the person.
                  (3) Also, a person who has made a request
               mentioned in subsection (1)(a) may appeal to the
               court against a deemed refusal of the request.
                  (4) An appeal under subsection (3) may be started
               at any time after the last day the decision on the
               matter should have been made.
               Appeals against decisions to change approval
               conditions under the repealed Act
               4.1.33A.(1) A person who is dissatisfied with a
               decision made on an application to change the
               conditions attached to an approval given under
               section 2.19(3)or section 4.4 of the repealed Act may
               appeal to the court against-
               (a) the decision; or
               (b) a deemed refusal of the application.
                   (2) An appeal under subsection (1)(a) must be
               started within 20 business days after the day notice of
               the decision is to be given to the person.
                   (3) An appeal under subsection (1)(b) may be
               started at any time after the last day a decision on the
               matter should have been made.
               Appeals against local laws
               4.1.33B.(1) An applicant who is dissatisfied with a
               decision of a local government or the conditions
               applied under a local law about the use of premises or
               the erection of a building or other structure permitted
               by the planning scheme may appeal to the court
               against the decision or the conditions applied.
                   (2) The appeal must be started within 20 business
               days after the day notice of the decision is given to
               the applicant.




               2    Section 6.1.44 (Conditions may be changed or cancelled by
                   assessment manager or concurrence agency in certain
                   circumstances)




               H o:\database\onestop\decision.doc                               20/08/04


                                                                                           Print Date: 26 February 2020, 3:13 PM

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.