Council archive · source document
Attachment F_Stormwater_Management_Plan · MCU23/0070
Plans and drawings: the text below has words only, no drawings.
DISCLAIMER This report has been prepared for the purpose and exclusive use of Cambooya Pty Ltd as an investigation into the stormwater management issues related for the proposed development of the land described in the report. The information presented in this report is not to be used for any other purpose or by any other person or corporation. JFP Urban Consultants Pty Ltd accepts no responsibility for any loss or damage suffered howsoever arising to any person or corporation who may use or rely on this report without further input and/or advice from JFP Urban Consultants Pty Ltd. The investigations, calculations, analysis and recommendations presented in this report rely on information sourced from third-parties. JFP Urban Consultants Pty Ltd accepts no responsibility for the accuracy of the information sourced from third-parties. SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH P a g e | 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F_Stormwater_Management_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.