RATIONAL METHOD CALCULATION – SITE
Catchment Details EXISTING SITE PROPOSED SITE
Area (ha) 0.0486 0.0486
Impervious Area (ha) 0.0277 0.044
Fraction Impervious (%) 57% 92%
1
I60 (mm/hr) 75.2 75.2
C1 0.656 0.70
C2 0.70 0.75
C5 0.78 0.84
C10 0.82 0.88
C20 0.86 0.92
C50 0.94 1.00
C100 0.98 1.00
Time of Concentration (min)
Method Tc
Catchment
EXISTING SITE Standard inlet time, catchment slope ~14% 8
PROPOSED SITE Standard inlet time, mostly paved/impervious areas 5
Rainfall Intensities (mm/hr)
Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
EXISTING SITE 111 139 168 196 223 257 282
PROPOSED SITE 125 158 193 227 259 301 333
Stormwater Quantities (m3/s)
Catchment 1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
EXISTING SITE 0.010 0.013 0.018 0.022 0.026 0.033 0.037
PROPOSED SITE 0.012 0.016 0.022 0.027 0.032 0.041 0.045
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F_Stormwater_Management_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.