Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment F_Stormwater_Management_Plan · MCU23/0070

of 35

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
RATIONAL METHOD CALCULATION – SITE
Catchment Details                      EXISTING SITE PROPOSED SITE

Area (ha)                                 0.0486        0.0486
Impervious Area (ha)                      0.0277        0.044
Fraction Impervious (%)                    57%           92%
1
 I60 (mm/hr)                              75.2           75.2
C1                                        0.656          0.70
C2                                        0.70           0.75
C5                                        0.78           0.84
C10                                       0.82           0.88
C20                                       0.86           0.92
C50                                       0.94           1.00
C100                                      0.98           1.00




Time of Concentration (min)
                                         Method                                      Tc
       Catchment
      EXISTING SITE        Standard inlet time, catchment slope ~14%                 8
     PROPOSED SITE         Standard inlet time, mostly paved/impervious areas        5




Rainfall Intensities (mm/hr)
        Catchment            1yr ARI     2yr ARI   5yr ARI      10yr ARI 20yr ARI 50yr ARI 100yr ARI
      EXISTING SITE            111         139       168          196      223      257       282
     PROPOSED SITE             125         158       193          227      259      301       333




Stormwater Quantities (m3/s)
       Catchment           1yr ARI       2yr ARI   5yr ARI      10yr ARI 20yr ARI 50yr ARI 100yr ARI
      EXISTING SITE          0.010        0.013     0.018        0.022    0.026    0.033     0.037
     PROPOSED SITE           0.012        0.016     0.022        0.027    0.032    0.041     0.045




SITE BASED STORMWATER MANAGEMENT PLAN – Revision B                                             36 & 38 DUKE STREET, SUNSHINE BEACH

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment F_Stormwater_Management_Plan.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.