Council archive · source document
Attachment F_Stormwater_Management_Plan · MCU23/0070
Plans and drawings: the text below has words only, no drawings.
MANNING’S CALCULATION – DOUGLAS LANE
Cross Sec tion Details 1 % AEP Flow
P oint CH Z n wA wP n x wA
1 0.00 0.080 0.015
2 0.00 0.000 0.015 0.00 0.04 0.00
3 0.50 0.012 0.015 0.02 0.50 0.00
4 1.31 0.027 0.015 0.02 0.80 0.00
5 2.06 0.021 0.015 0.01 0.75 0.00
6 2.61 0.018 0.015 0.01 0.56 0.00
7 2.88 0.017 0.015 0.01 0.26 0.00
8 3.50 0.073 0.015 0.00 0.29 0.00
9 4.67 0.089 0.015
wA wP n x wA
TO TAL 0.073 3.207 0.001
Slope (m/m)
0.08 R n Q
0.023 0.015 0.113
Design Flow (m³/s) 0.113
WSL (m) 0.042
Results
Channel Flow (m³/s) 0.113
Velocity (m/s) 1.54
Max. Depth (m) 0.042
DV Product (m²/s) 0.07
0.10
0.09
0.08
0.07
0.06
0.05 Surface
1% AEP Flow
0.04
0.03
0.02
0.01
0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Chainage (m)
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F_Stormwater_Management_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.