Council archive · source document
Attachment F_Stormwater_Management_Plan · MCU23/0070
Plans and drawings: the text below has words only, no drawings.
JFP URBAN CONSULTANTS = JFOP URBANCONSULTANTS DETENTION TANK STAGE-AREA-VOLUME RL (m AHD) Height (m) Area (m?) Area (ha) Incremental Vol (m3?) Accum. Vol (m3) 4.50 0.00045 0 0.0 4.50 0.00045 r 0.450 0.5 4.50 0.00045 r 0.450 0.9 4.50 0.00045 r 0.450 14 4.50 0.00045 r 0.450 18 4.50 0.00045 r 0.450 2.3 4.50 0.00045 r 0.450 27 4.50 0.00045 r 0.450 3.2 4.50 0.00045 r 0.450 3.6 4.50 0.00045 r 0.450 41 4.50 0.00045 r 0.450 4.5 4.50 0.00045 r 0.450 5.0 4.50 0.00045 r 0.450 5.4 4.50 0.00045 r 0.450 5.9 4.50 0.00045 r 0.450 63 4.50 0.00045 r 0.450 6.8 4.50 0.00045 r 0.450 7.2 4.50 0.00045 r 0.450 77 4.50 0.00045 r 0.450 8.1 4.50 0.00045 r 0.450 8.6 4.50 0.00045 r 0.450 9.0 4.50 0.00045 r 0.450 9.5 4.50 0.00045 r 0.450 9.9 4.50 0.00045 r 0.450 10.4 4.50 0.00045 r 0.450 10.8 4.50 0.00045 r 0.450 11.3 4.50 0.00045 r 0.450 11.7 4.50 0.00045 r 0.450 12.2 4.50 0.00045 r 0.450 12.6 4.50 0.00045 r 0.450 13.1 4.50 0.00045 r 0.450 13.5 SITE BASED STORMWATER MANAGEMENT PLAN — Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F_Stormwater_Management_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.