Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1, 6 & 28, Title Search & Compliance Certificate 15 · OPW12/0511

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                        --   -----   -
                                                                                                                                             -                           -




                                                                                                                                            ,                   .




  DDD
Table B

    What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
                    ~                                                         !.




                D       road works
                                                       D stormwater          D      water infrastructure

                                                                                                                       .




                D       drainage works                 D   earthworks        D      sewerage infrastructure



                D. landscaping                         D signage             D      clearing vegetation und,er the planning scheme


                D other-provide details            I                                                                        ,




        What type of approval is being sought? (if you have indicated multiple works in the above question. please use an
        attachment to this form to detail each approval request)


        [2$J   development permit              D   preliminary approval            D both-specify below

    I por.-\coY’\                                                                                                                                           I
        Is the operational work necessary to facilitate the creation of new lots? (e.g.subdivision)

               No
                             D Yes-specify the number of lots being created                     I
        Are there any current approvals associated with this application? (e.g.material change of use)
    .




        ~ No                 D Yes-provide details below
        List of approval reference/s                                                Date approved          uate approval ~EfS--                                 -




                                                                                        .




                                                                                       ,.   ;




2. What is the dollar value of the       proposed building work? (inc G5T, materials and labour)              1$50,000
                                                                                                                 ."jj~I’i’-~:r;~,lJ: >j: t"’,,.f~.~~~ ,~~
3. Confirm that the following mandatory supporting information accompanies this application                      r,,-.... .~ttiltrf;j~;:’1


                                                                                            Confirmation of           Method of
                                                                                            lodgement                 lodgement

All applications for operational works

site plans drawn to scale which show the following:
                                                                                            lEI confirmed
.  the location and site area of the land to which the application relates
   (relevantland)                          c
                                                                 -~   ~...   -
                                                                                       -




.  the north point                                                                                                                                                  .-




.  the boundaries of the relevant land
.  the allotment layout showing existing lots. any proposed lots (includingthe
   dimensions of those lots), existing or proposed road reserves, building
   envelopes and existing or proposed open space (note:numbering is required
   for all lots)




                2                              Building oroperational work assessable against a planningscheme-IOASform 6
                                                                                                    Version 1.0 lBDecember 2009

Used in these records

About this file

File size
11.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 1 of 2 - Covering Letter, IDAS Forms 1, 6 & 28, Title Search & Compliance Certificate 15.pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.