Original source · versioned page text
22544_Opw [C]
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
CONTEXT PLAN MATERIALS & FINISHES SCHEDULE
MP
CO
SW M P
P 5.4
E SW OM
P CO
COM CO C MP MP CODE / ITEM MANUF. REQUIREMENTS
CO CO
5.2
5.2
N MP
MP
5.2
AN W CO MP E
SW FM
5.2
HO E CO S
P 5.4 DRIV T T
COM 5.2
5.2 COM
P W
MP
CPO
CO
SW E W TCO 5.2
S OM
Turf Type 1 (T1) 25mm thick A-grade 'Winter Green' Couch.
5.0
5.4
MP
5.4 5.4
CO C
MP
P
COM P
COM
E W T T
MEP CO
5
5.6 5.4 5.2
Edge Type 1 (EG-1) 100x38mm Treated pine garden edging surround with 500x38x38mm treated pine pegs at
5.4
MP
5.6 E W TCO S 5.4
P
MP W Nom.1200mm centres. Refer to detail and specification
CO
CO5.2M
5.8 5.6 E W T T
COMP SW MP T
COMP 5.6
S CO
5.4
6.0
6 TCOMP 5.8 W
MP Edge Type 2 (EG-2) 100mm x 100mm Concrete Edge. Refer to detail.
5.8
SW
N COMP P
COM
W T T AN
5.2
E
5.2
HOFM COM
6
S
W LL P
JOINS CD-101
JOINS CD-100
DRIVE CW
5.4
6.0E TCOMPW 5.8 WA
COMP OM
5.6
5.4
Pavement Type 1 100mm thick and steel reinforced, plain grey broom finished concrete pavement. Refer to detail
6
SW SW 4.6 5.0
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
6.0
X X E T T W SW SW SW SW 4.8 4.8 4.6 P
S
5.6
X X T
5.4 X X
TCOMPW SW RET 4.4 RE
COMP (P-1)
E
5.8
X X
S S S S S
5.2
4.8 CD-200
5.0
5.6 X X
S
4.6
5.6
S
X X E T T W CO S S WA 4.4
5.8 X X
S S LL
5.6 T MPW S
COMP
5.8
X X5.8 E 5.2
X X
S S 5
5.8
S S T T W CO6.0M
4.8
E
S S S 5.8
6.0
Garden Bed Type 1 Internal grade typical, 300mm depth amended site or imported topsoil to specification, cover with
4.8
5.6 E T P T W
S 5.8 E W T 5.4 (GB1) 100mm thick Organic Forest Chip Mulch, refer to detail CD-200
E
/
5.4
5.8
5.8
/
SW
Garden Bed Type 2 Internal grade typical, 300mm depth amended site or imported topsoil to specification, cover with
5.6
5.8 5.6
5.8
/
E
(GB2) Low Planting 100mm thick Organic Forest Chip Mulch, refer to detail CD-200
5.8
5.8
5.8 PUMP GENERATOR Mix
STAIR 6
UP UP ROOM 31 m² 5.6
26 m²
E
Garden Bed Type 3 Internal grade typical, 300mm depth amended site or imported topsoil to specification, cover with
5.8
UP
UP MSB
5.8
36 m² E
EOT
TENANCY 2
142 m²
COMMS
FACILITIES
VACUUM
(GB3) Medium 100mm thick Organic Forest Chip Mulch, refer to detail CD-200
55 m² E
TENANCY 1 9 m² PLANT
Planting Mix
5.8
5.8
RET
391 m² 6 11 m²
WALL
6.2
JOINS CD-102 JOINS CD-103 Garden Bed Type 4 Internal grade typical, 300mm depth amended site or imported topsoil to specification, cover with
BIO BASIN
JOINS CD-100 UP JOINS CD-101 (GB4) Carpark Mix 1 100mm thick Organic Forest Chip Mulch, refer to detail CD-200
WALL
RET
Garden Bed Type 5 Internal grade typical, 300mm depth amended site or imported topsoil to specification, cover with
6.4
TENANCY 3
(GB5) Carpark Mix 2 100mm thick Organic Forest Chip Mulch, refer to detail CD-200
SMALL
SMALL
776 m²
LIFT RL 5.80 m
E
JOINS CD-102
E
UP
UP Bio-basin Planting Mulch to be 100mm thick coarse straw / sugar cane mulch with minimal fines. Secure with jute
SMALL
SMALL
BUNKER OVER
UP
5.8
UP
(BB1) mesh netting. Pin with 300mm pins to prevent the mesh from lifting.
5.8
Mulch Only to Areas around street trees to be 100mm thick forest mulch. Mulch to be coarse with a combination
6.2
OUTLINE OF BUILDING OVER SHOWN DASHED
6.6
6.0
INACCESSIBLE VOID UNDER BUNKER
6.4
6.4
6.6 Street Trees of bark, twigs and chips and maximum 10% fines.
DN 6.0
6.8
OUTLINE OF BUILDING OVER SHOWN DASHED 6.0 5.8 5.8
6.2
Park Seat (S-1) KF012 Metro Seat (Landmark) to be installed as per manufacturer's specifications.
6.6
SMALL
SMALL
JOINS CD-103
All Concrete Holcim All concrete pavements to use Holcim 'ECOPactZero' carbon neutral concrete, verified by a product
Pavements
6.8
(Australia) Pty
5.8
6.8 6.0 6.4 6.0 specific EPD. Refer to pavement types for colours and finishes.
6.2
6.4
Ltd
6.8
6.6
6.4
6.2
7.0 7.0 STORE
7.2 7 (LOW
7.2
7.4 6.8 6.6 HEIGHT)
6.2
7.4 6
7.8 OUTLINE OF BUILDING OVER SHOWN DASHED
7 6.6 6.0 6.4
DRAWING SCHEDULE
22544 CD-000 COVER SHEET
22544 CD-001 SPECIFICATION NOTES
22544 CD-002 PLANT SCHEDULES
22544 CD-100 LANDSCAPE PLAN: GROUND LEVEL
22544 CD-101 LANDSCAPE PLAN: GROUND LEVEL
22544 CD-102 LANDSCAPE PLAN: GROUND LEVEL
22544 CD-103 LANDSCAPE PLAN: GROUND LEVEL
22544 CD-104 LANDSCAPE PLAN: LEVEL 1
22544 CD-200 CONSTRUCTION DETAILS
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET
A 24.04.2023 For Review LS CS
NOT FOR CONSTRUCTION B 27.04.2023 For Approval LS CS
CD-000 scale: 1:500@A1; 1:1000@A3
NOOSA HEALTH PRECINCT
NORTH
JOB NUMBER: 22544 CLIENT NAME: TRIDENT GROUP HOLDINGS PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of sections 2 to 5 (of 11)
Section 2
14. Bio-Basin
LANDSCAPE NOTES 10. Containerised Plant Material - Supply and Installation Bio Basin filter media to contain 5% organic matter to support plant growth as per Water by Design Guidelines. Provide filter
EXTENT OF WORKS All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in accordance with the scheduled media test results to confirm organic content. Plant Macrophytes with pre-soaked water retentive material such as coir and slow
nomenclature, well formed, hardened off nursery stock. They are to be container grown in potting mixture with a healthy root system and not release plant starter fertiliser. In the absence of regular rainfall, ensure basins are watered twice weekly through a 3 month
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 22544 Cover Sheet CD-000. pot bound. All pots shall be free of weeds and plant stock is to be free from living insects, pests and disease. All plants are to be fully sun or establishment period.
Contractor to ensure they have the latest issue of the documents prior to tendering and construction. Contractor should also shade hardened-off to suit their on-site growing position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed
take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering and Electrical Engineering works plant stock within the 12 month maintenance period. It is therefore recommended that the Contractor does not accept below Standard stock 15. Irrigation System
which will be made available on site. Hard surface layout is to be at the discretion of the Project Manager. Where there is from the Nursery/Supplier. Contractor is to install D&C fully automated irrigation system including pumps, valves, controllers and irrigation components.
conflicting information, contact the Landscape Architect. Landscape works for this contract are to include the following: Refer to separate Irrigation Performance Specification, design intent and plans. Connection provided to town water supply and/or
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the event of rainwater tanks when available.
1. Co-ordination with Other Trades and Conduit Installation supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a Nursery inspection
2. Removal of Debris including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock (or good selection of stock) is 16. Services
3. Sediment and Erosion Control present during the inspection. It is also recommended that the Landscape Architect is on site to inspect plant stock and plant set out prior to The location of all underground or overhead services shown on these drawings are indicative only. They have been incorporated
4. Excavation and Drainage of Planting Areas planting. at the design or Council Approval stage for general information. The Landscape Contractor shall be responsible for liaising with
5. Topsoil - Supply and Incorporation the Principal Contractor to determine where the 'As Constructed' location of all water, sewer, stormwater, electrical,
6. Soil Amendments Plant stock notes: communication or other existing services before commencing any excavation works.
7. Edging to Planting Areas - where not already supplied - Container sizes are noted as follows:-
8. Shaping of Garden Areas - Pots in millimetres. 17. Inspection Plan & Shop Drawing Review
9. Fences - Bags in litres. The Contractor shall co-ordinate the following inspections with the site superintendent:
10. Containerised Plant Material - Supply and Installation - Stock may be rejected if plants are:- - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
11. Street Tree Planting Location Notes - Undersized proportional to specified container size or if the root system is underdeveloped. confirmation.
12. Garden Mulch - Supply and Spread - Oversized proportional to specified container size or severely root bound. - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
13. Turf - Supply and Lay - Unbalanced or uncharacteristic of normal or specified growth pattern for the species. - Pre-planting inspection - at commencement of placement of advanced plant material.
14. Bio-basin - Not suitably acclimatised for the specific environment. - Setout inspection - at first setout of containerised plant stock.
15. Irrigation System - Diseased, infested with pests or suffering from other form of significant stress. - "On Maintenance" - at practical completion.
16. Services - Have poor root development or root defects. - "Off Maintenance" - 365 days after practical completion.
17. Inspection Plan & Shop Drawing Review - Substitution of specified plant species only by written instruction from Landscape Architect.
18. As Constructed Requirements Contractor to provide shop drawings and structural design certification for review and approval of any custom designed
19. Maintenance of Landscape Works (12 months) Implementation notes: structures, furniture or fencing.
20. Landscape Carbon Emissions Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of this project.
21. Podium Soils The following minimum is expected: 18. As Constructed Requirements
- Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of the hole to a The Landscape Contractor is to clearly mark up and provide the Landscape Architect any changes to the built landscape from the
1. Co-ordination with Other Trades further depth of 100mm and loosen the sides of the hole. issued construction drawings. As Constructed information is to include dimensions, materials and depths which vary from and/or
Contractor is to make full allowance for the reasonable activities of other trades. Where directed by the Principal Contractor all - Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central are not included on the construction issue plans. Contributed Landscape Assets are to be captured and included in the ADAC
must comply with soil and erosion control measures. Contractor shall allow for the installation of electrical services for and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed. survey for the development as per the Sunshine Coast Council As Constructed Data Standards and Guidelines. The Landscape
landscape lighting at the appropriate time in the construction program. Contractor shall pay due consideration to installation of - Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is Contractor is to coordinate asset capture with the Project Surveyor and allow for hold points accordingly, especially with
irrigation lines so as to minimise disturbance to planted areas. The coordination of appropriate conduit lines forms part of this ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as per the underground services. Landscape contractor is to provide the following documentation as relevant:
contract. Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete manufactures specification. - Certification that all street trees comply with AS2303:2018.
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the contractors - Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period - Contractor to provide MDS or Product Data Sheet of any proprietary furniture or structural items.
expense. Any disputes will be settled by the site Superintendent. as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. - Certification of supplied topsoil to AS4419
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that - For amended site topsoil provide delivery dockets of ameliorant to confirm quantities supplied.
2. Removal of Debris topsoil is not placed over the top of the rootball.
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout construction of 19. Maintenance of Landscape Works
landscape works. Planting areas are to contain planting and selected drainage materials only and are not to contain any All advanced trees 25L or greater are to be certified as AS2303 compliant. Contractor to sight and supply certification to superintendent The Maintenance Period commences at the date of Practical Completion of Works. During the Establishment Period maintain best
building material waste. prior to accepting trees from the nursery. Contractor is to review all tree stock at unloading and prior to planting to ensure the compliance with horticultural practices including (but not limited to) the following items where required: watering, weeding, fertilising, pest and
the below. Trees that fail these criteria should not be planted and are to be returned to nursery disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in
3. Sediment and Erosion Control - Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor the works under normal use.
Where directed by the Principal Contractor all must comply with soil and erosion control measures. Refer Civil Engineers to tease out roots and prune as required to encourage healthy root development.
- Trees are to be self supporting, of good form and health with single undamaged leader, no bifurcations or bark inclusions. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing failed or
drawings for all sediment and erosion control measures.
- Ensure trunk is not buried below flare in trunk at top of roots, contractor to scrape off excess potting mix as required. under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be inclusive of a twelve (12)
month maintenance program.
4. Excavation and Drainage of Planting Areas
Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use. Do not vary the plant
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve required planting
locations from those specified on the drawings unless otherwise directed by the Superintendent. Should it be necessary to vary the locations and Maintenance and Inspection Program:
depths. Excavate site soil as required to ensure consistent high quality planting material. Break up existing subgrade to a depth
spacing for any reason, immediately apply for directions by the Superintendent. Replace failed or damaged plants. This does not include Responsibility Weeks after practical completion Maintenance Inspection Frequency
of 300mm. Any excavated planting areas are to be scarified at sides to provide anchorage for future root development.
vandalised or stolen plant material - this will be replaced prior to practical completion. Trees are to be planted 20-30mm above finish level to Contractor 0-2 3 per week
Additional excavation works will be required in areas of advanced plant material. Drainage is to be incorporated to all planting
allow for settling. Contractor 3-4 2 per week
areas that are enclosed by hard edging and not otherwise drained. Contractor should allow for drainage to all garden areas. Contractor 5 - 13 1 per week
11. Street Tree Planting Location Notes. Contractor 14 - onwards As per established maintenance regime
5. Topsoil - Supply and Incorporation
Locate road verge street trees in accordance with Local Authority Requirements or as indicated below:
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil) Maintenance Program General Notes
- Minimum 2.0 metres from driveway cross over.
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. Site topsoil - A minimum of 1.0 metre from all services to prevent root/service conflict and to provide future ease of maintenance requirements. - Maintenance inspection frequencies are minimum.
shall be screened to break up clumps, remove unwanted material and ensure soil is easy to work. Screening to take place within - A minimum of 2.0 metres from stormwater pit. - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
2 weeks of requiring soil for use. Top soils are to be tested for horticultural suitability and receive appropriate amelioration if - A minimum of 4.0 metres from street lights. levels are critical during early establishment. Avoid over irrigating planting areas.
required. All topsoil must be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. - A minimum of 750mm behind the kerb or centrally if between footpath and back of kerb.. - Mow turf every 2 weeks.
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent any ponding. - Prune and shape all shrubs and trees on a monthly basis as required.
Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no greater than 2m high x 3m 12. Garden Mulch - Supply and Spread - Remove all stakes at 90 day inspection, or after satisfactory establishment.
wide. Topsoil storage piles for storage greater than 4 months should be seeded with a suitable grass mix and screened prior to All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be level with - Fertilise all garden beds and street trees at 3 monthly intervals.
use. Eradicate weeds using environmentally acceptable methods. Project Urban discourages the use of Glyphosate and is happy the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed clear of plant stems to - Contractor shall maintain an up to date written log book to record inspection observations and actions.
to discuss alternative options with the Landscape Contractor. Noxious weeds need to be screened out of the topsoil prior to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and bark) with no more than 10% fines - The log will be made available to the site superintendent, upon request, at any time for examination.
placement. nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as described above. Mulch is to be formed to avoid
placement against green plant stems and overflow from purpose formed edges, kerbs and pathways. Samples of all mulch types to be provided 20. Landscape Carbon Emissions
6. Soil Amendments to Landscape Architect for approval prior to installation. Reduction of greenhouse gasses created during the construction or maintenance of the landscape works and embodied
The Contractor shall allow to amend the garden and podium soil with the following components, to be confirmed by soils test: greenhouse gasses in materials is strongly encouraged. Contractors are to provide a written statement outlining carbon reduction
- Nutri-Tech Solutions 'Life Force Carbon' - Spread a 3 - 5 mm layer of Life Force® Carbon™ over garden beds. Work into 13. Turf - Supply and Lay measures adopted by their business which are applicable to this project. These could include items such as the following:
the top 10- 15 cm of soil where practical and water in well. Apply 2-3 times a year for best results. Planting New Trees: 1 - Obtain turf from a specialist grower of cultivated turf. · Use of electric powered equipment for construction and maintenance
2 cups per tree in the hole. Turf notes: · Use of electric or hybrid vehicles or fleet for transportation and construction
- Nutri-Tech Solutions 'Life Force Gold' - For Landscapes - 200 g (or 1 cup) per square metre and for Podium Media - 15 - "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm · Purchase of power from sustainable sources or production of own power through Solar PV cells
grams per litre - Turf to be laid within 24 hours of being cut and on day of delivery. · Use of organic fertilisers rather than petrochemical products
- Grade turf areas evenly with falls to drains. · Use of low carbon concrete or materials fabricated through low carbon supply chains
7. Edging to Planting Areas- where not already supplied - Allow for ground preparation and placement of 100mm topsoil to specification requirements. · Use of local materials with low transport carbon costs.
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should finish flush - Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications). · Offsetting greenhouse gas emissions through accredited offset schemes
with adjoining finished levels and hard pavements. Round / Ease all edges where applicable. - Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
adjacent finished surfaces. Project Urban is in the process of reviewing products that we specify to favour the use of low embodied greenhouse gas
8. Shaping of Garden Areas - Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at emissions materials. Contractors should review materials schedules and ensure their pricing reflects the specified materials.
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show planting to best the end of the maintenance period. Substitutions of materials should consider the embodied greenhouse gas in those materials. We are happy to consider alternative
advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or lower carbon footprint products suggested by the contractor.
undulations with coarse washed sand.
9. Fences - Keep lawn moist until established and rooted in. Install temporary barriers (flagging tape) to ensure walking and driving on turf areas is
All fences and footings to be located within private property where applicable. Fencing to common boundaries are to be prevented and avoided.
located on the boundary line as determined by a registered surveyor. Refer to Fencing notes and specification. Where new - Replace failed turf and relay with new turf.
fences are indicated on the drawings, existing fences are to be demolished, unless otherwise noted.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SPECIFICATION NOTES
A 24.04.2023 For Review LS CS
NOT FOR CONSTRUCTION B 27.04.2023 For Approval LS CS
CD-001 scale: N/A
NOOSA HEALTH PRECINCT
JOB NUMBER: 22544 CLIENT NAME: TRIDENT GROUP HOLDINGS PTY LTD
Section 3
LANDSCAPE NOTES (CONTINUED) PLANT SCHEDULES: ATRIUM PLANTING
21. Podium Soils
Lightweight podium soil mix shall be supplied and installed by the Contractor to planters and podium areas to
locations shown on plans.
The soil mix shall be:
i. Free from perennial weeds and their roots, bulbs or rhizomes.
ii. Free from building rubble, including bricks, concrete, plaster, timber, oil or any other matter deleterious to plant
growth.
iii. Free from rocks or stones greater than 8mm diameter, but in any case, to have less than 15% stone by dry weight.
iv. To have all components batch blended evenly throughout and have a pH range of 6.0 - 7.0 (i.e., slightly acid to
neutral).
v. To have a light to medium friable loam texture.
vi. Free from Silt Material.
vii.Conducive to the establishment and maintenance of healthy, thriving plants.
The planter mix to planters shall be Hydrocell 40 Extensive Lightweight Soil / Podium Mix comprising 30% Washed
Sand, 40% Hydrocell, 20% 14mm scoria and 10% Composted Organics by volume. Supplier Fytogreen Australia Tel -
1300 182 341
The Contractor may offer an alternative soil mix based on previous experience. Full details of such mix including
situations of use elsewhere shall be submitted to the Superintendent for consideration. The Superintendent shall
provide written approval or otherwise to the Contractor prior to the Contractor ordering soil mix.
C
PLANT SCHEDULES: EXTERNAL & CAR PARK PLANTING PLANT SCHEDULES: PLANTING MIXES
C
C
Revision Date Amendment Drawn Checked
APPROVAL ONLY
PLANT SCHEDULES
A 24.04.2023 For Review LS CS
NOT FOR CONSTRUCTION B 27.04.2023 For Approval LS CS
C 18.05.2023 For Approval LS CS
CD-002 scale: N/A
NOOSA HEALTH PRECINCT
JOB NUMBER: 22544 CLIENT NAME: TRIDENT GROUP HOLDINGS PTY LTD
Section 4
P
COM
SW
P
COM
SW
LEGEND
C OMP
P
SW 5.6 SURFACE FINISHES
COM T1 - TURF TYPE 1
SW T1
P
COM
5.6 M1 - Mulch Type 1
M1 Gravel Mulch
EG-1 - Edge Type 1
COM
EG-1 Treated Pine Timber Edge
5.8 5.6
P
Refer to detail
EG-2 EG-2 - Edge Type 2
SW
/ / /
Extruded Concrete Edge
COMP SW COMP SW COMP S Refer to detail
5.6
SW COMP
P P1 - Paving Type 1
COM
SW
COMP
COMP
SW
S P1 Plain Grey
T Broom Finished Concrete
6
SW
P
COM
COMP COM TT
6.0 GB1 - Garden Type 1
SW 5.8 P
COMP S TT GB1
SW T
General Gardens Typical
P
5.8
TT
COM
COMP COM W
SW P
COMP T TT W
S
EG
SW COM TT
W GB2 - Garden Type 2
COMP P GB2
-1
SW COM
P W Low Planting Mix
IVE
T
6 S T T W
N DR
COMP
COM T W
GB3 - Garden Type 3
P T
A N COMP
S T T W
HOFM
COM T
TW
GB3 Medium Planting Mix
S
5.4
6.0
P TW
COMP T T
TW E
5.8
S COM TW E GB4 - Garden Type 4
COMP T1
P
Carpark Mix 1
T
T TW E GB4
S TW
T E
COMP
COM
6 S TW T
WP T E
GB4 - Garden Type 5
COMP
T E
COMW T X X X X
SW
X X X X
SW
X X X X X
SW
X X GB5 Carpark Mix 2
S T E
P X X
6 .0
X
TW
COMP
X
TT E X X
SW
5.6
X X
COMW X
S TT BB1 - Garden Type 4
X X
P E SW
X
COMP
X
TW X
BB1 Bio-basin Planting
X
TT X
SW
2 MEL bra
E X
COMW X
S X X
P
TT X
COMP SW
X
TW E X X X
TT
COMW X
5.8
X
S SW S-1
E X
S-1
P X X
COMP
TW T X X
5.6 SW
E X
Park Seat
COMWP T X X X
T
S
Section 5
X
E X
SW Refer Materials and Finishes Schedule
TW T X
COMP
X X
COMP T E X X
S T W T T
E X X X X X
SW 5.6
COMP
X
T1 GB3
COMP W T T X X
Trees to be Removed
E X X
T X
S TT
W X
AREA A
T E X X
COMP
X X
COMP TT
S T W
W
TT E
E
X X X X X X X
5.8 S
S
COMP
COMP X
5.8 COMP
TT X X
S
S
W E
S COMP
T W
TT
TT E 5.8
12 CAL LJ X X X X X X
2 CAL S S S S S S C
S vim S
X
S
X
5.8
E X
18 LOM SHA
W X
T TT E X X
S S
S S
X
S
COMP W T X
S
X
S
X
CO M P
T E
S
X
S
X
T W TT E S
X X
S
S
5.8
X
S
X
COMP
TW
T
T S S S
COMP
E
S
JOINS CD-101
JOINS CD-100
6.0 6.0 T TW T
S
E S S S
S COMP T
TW
T
S S S S E 3 WAT flo
COMP S
T
S
T
COMP
S S T S TW E
S
T S T TW
T S COMP T 2 MEL bra
T
W E
COMP T T E
T S T T W
GB
COMP T E
T S T TT W W E
1 TRI LUS
1
TW W
TTW
TT
T
TW S E
E
E
5.8
S E 12 MEL thy
S-1
E
E
EG-2
E
E
E
GB2 P1
AREA A /
/
/
/
/
/
2 CUP ana
5.8
/
S- 11 CAL LJ
1
/
17 MEL thy
/
2 CUP ana P1
/
14 FIC nod 22 XAN CD
EG-2
/
24 LOM SHA T1
5.8
/
EG 2 TRI LUS
/
-2 8 CAS CI
/
GB1
/
M1
/
17 DIA cae GB2 5 BAN BC
/
14 CAS CI AREA A
/
17 LOM SHA
/
17 LOM SHA 3 XAN CD GB1 19 DIA cae
2 RAN fit 6 HAR vio 5.8
11 DIA cae
3 COR RUB 3 XAN CD
8 DIA cae
18 MEL mal GB1
GB1
12 CAS CI
14 DIA cae E
UP
UP
5.8
RET WALL
RET
WALL
BB1
C
TENANCY 2
WALL
RET
1 TRI LUS
C
RET
WALL
4 DIC SF
TENANCY 1 HOW for
6 VIO hed
5.8
M1
WALL
2 ALO bri
RET
391 m² 6 8 MOL cap
3 ALP cae
6.2 3 ARC cun
LIN mon
RET
WALL
2 DIC SF
WALL
6 VIO hed
RET
JOINS CD-102 GB1
RET
WALL
BIO BASIN JOINS CD-100
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN: GROUND LEVEL
A 24.04.2023 For Review LS CS
NOT FOR CONSTRUCTION B 27.04.2023 For Approval LS CS
C 18.05.2023 For Approval LS CS
CD-100 scale: 1:100@A1; 1:200@A3
NOOSA HEALTH PRECINCT
NORTH
JOB NUMBER: 22544 CLIENT NAME: TRIDENT GROUP HOLDINGS PTY LTD SCALE 1:100 0 1 3 5 8 10m
The text continues on section 6.