22544_Opw [C]
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
Notes: Notes:
Notes: Notes:
- Thoroughly water the root ball - Place the rootball on a firm base.
- Place the rootball on a firmed base to achieve required FSL. - Place the rootball on a firm base.
immediately after planting. - Thoroughly water the root ball immediately after planting.
- Thoroughly water the root ball immediately after planting. - Thoroughly water the root ball immediately after planting.
- Cultivate sides of excavated hole 50mm deep.
Marker stake: - Number of stakes will vary with pot size. Refer plant schedule. - Cultivate sides of excavated hole 50mm deep.
- Do not disturb kerb, road pavement or road side drainage works.
12x12x75mm - Cultivate sides of excavated hole 50mm. - Do not disturb kerb, road pavement or road side drainage works.
- Tease out roots on side of rootball when planting.
Tree guard - Tease out roots on side of rootball when planting.
- Ensure top of rootball is not buried; expose and set flush with finished level.
Form an earthen basin - Ensure top of rootball is not buried; expose and set flush with finished level.
around the base of the Set soil level at top of
plant. rootball (at flare of trunk)
Mulch: Pull away from
base of plant. 250 Pull away mulch
Hardwood Stake: from base of plant
25
25x25x90mm Place 600mm
into the ground. Do not 50x50x2400 HW Timber stake: Form mulch berm
Fertiliser: Do not allow place through rootball. Place 600mm into the ground. Do to the perimeter of
Secure with ties by looping the rootball Hardwood stake: Place 600mm
contact with roots. not place through rootball. Secure
in a figure eight pattern. into the ground. Do not place
with hessian ties by looping in a
through rootball. Secure with
figure eight pattern.
Topsoil blend Mulch: Pull away from ties by looping in a figure eight
base of plant. pattern.
Water retention Distance to local
additive Raise plant 20-30mm above Raise plant 50mm above
Form an earthen basin authority
top of kerb. finished surface level.
around base of plant. requirments
1 TUBESTOCK PLANTING Do not excavate
Mulch: Pull away from base
of plant.
CD-200 1:10@A1, 1:20@A3 within 50mm of Form an earthen basin
Topsoil blend edge restraint or around base of plant.
pavement. 100
Turf as specified Fertiliser: Do not allow Top of Kerb
contact with roots. FSL
Topsoil
Topsoil blend
min 300
- to 100mm depth Water retention additive 50
300
2
Cultivate subgrade Water retention additive
- to 150mm depth Topsoil blend 1 1
Fertiliser: Do not allow 1
Existing subgrade 2 140-300mm PLANTING 1
fertiliser to come in 1
CD-200 1:10@A1, 1:20@A3 Bio-degradable Geo-fabric contact with roots.
Water retention width (w)
additive 10 - 20mm Drainage gravel
5 TURF PROFILE 100mm drainage gravel in
2xw
CD-200 1:5@A1, 1:10@A3
heavy or poor draining soils. Connect drainage gravel
to back of kerb, subsoil
FSL Macrophyte planting
with root ball fully into
Jute mesh/coir netting. With Incorporate slow release organic drainage where 4 45-200ltr PLANTING
Mulch 300mm long pins at twice fertilizer and water retention applicable CD-200 1:10@A1, 1:20@A3
- to 100mm depth media and pull foliage recommended rate to prevent additives to backfill per
through netting the mesh from lifting. Manufacturer's recommendations
Soil blend or site topsoil Notes:
- to 300mm depth Filter media and drainage per - Concrete - N25 to footpath.
engineer. Filter media to contain - Compact sand base under path to a density index of (d.i.) of 75%
75mm thick coarse
straw/ sugar cane 5% organics per water by min.
design guidelines - Saw Cut control joints
Cultivated subgrade mulch with minimal
fines.
3 STREET TREE PLANTING SL62 Mesh 40 top
- to 150mm depth CD-200 1:10@A1, 1:20@A3 & side cover.
All trees to have 100% NATSPEC inspection prior to delivery to site
min. 2% fall Vapour Barrier
40
6 GARDEN BED PROFILE 7 BIO-BASIN PROFILE 40 40
100
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3
Notes: FSL
(X)
- All timber to be CCA pressure treated to
Sand Bed - 50mm thick
AS1604, Hazard 5, rough sawn pine. Timber edge
- All timber edges to be arissed to comply Compacted Subgrade:
with council standards. Notes: 150mm to 95% Standard
SECTION
- All timber ends to have one coat of Stakes 1. Construction joints: Place at minimum 5m centres.
2. Tool joints: Make tool joint at equal distances from 90mm∅ capped slotted pipe
Cuprinol or equal prior to installation.
both ends. Make joint at points of change in curvature/ 75mm below top of planter
- Stakes to be 400mm into ground at max.
Existing/compacted direction. Joints to be at right angles to direction of connected to drainage system
1200mm centres, or as required to obtain Reinforcing: Cut every 2nd
/subgrade/subase edge. per Hydraulic Engineer
smooth curves. Top of stake to finish River stone to 2.8mm mesh rod under sawn joint.
20mm below top of timber edge. Where Mulch - refer to Specification.
20
top of pipe
timber edges meet at corners provide Continuous extruded mowing Mulch
double stakes. strip. Profile as indicated - refer to plans for organic or
- All fixings to be hot dipped galv. below. inorganic locations
- Leading edge is to be free of burrs and CONTROL JOINT (located every 2m)
splinters. Turf - refer to Specification.
Podium soil
Topsoil - refer to
varies
- refer to Specification Dowels: 12mm Dia. HD Galv. rods
Specification
x450mm long @ 400cs. Grease
Cultivated subgrade - refer to
TIMBER EDGE STAKES (X) = Height above Flexible Joint and and cap one end.
FIXINGS Specification. Geotextile fabric
38 50 finished surface level Filler Board SL62 Mesh
50mm Bugle Headed Compacted subgrade to be 30mm Atlantis drainage cell
FLUSH 40 top cover.
Batten Screws. Nom. 200mm thickness. or similar approved
100
20mm 75mm Bugle Headed Existing subgrade
Batten Screws. Topping slab - If required.
100mm
Depth varies to achieve falls
100
100mm Bugle Headed
150mm Batten screws. to drain.
100x38mm 300 300 300
Waterproofing and protection
50x50mm
9 EDGE TYPE 1 CONTINUOUS EDGING PROFILES - to Architect's Specification. EXPANSION JOINT
CD-200 1:10@A1, 1:20@A3 Edge radii: All radii 20mm
Podium / basement slab located every 8m
In-situ concrete garden edge Adjacent surface levels: As shown by FSL - refer Engineer's detail.
8 EDGE TYPE 1 on profiles
CD-200 1:5@A1, 1:10@A3
10 PODIUM PLANTER 11 PAVEMENT TYPE 1
Timber garden edge 100 CD-200 1:10@A1, 1:20@A3
CD-200 1:10@A1, 1:20@A3 Pedestrian concrete path
100
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS
A 26.04.2023 For Approval LS CS
NOT FOR CONSTRUCTION
CD-200 scale as noted Edge Section 1:5@A1; 1:10@A3
NOOSA HEALTH PRECINCT
JOB NUMBER: 22544 CLIENT NAME: TRIDENT GROUP HOLDINGS PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.