Effluent Disposal Report - RFI - RAL26-0015 · RAL26/0015
All stormwater from upslope is to be diverted area from the area. A shallow spoon drain is to be constructed uphill of the irrigation area if deemed necessary to divert water around the area. A 150mm high retention mound is to be installed downhill to capture any runoff if deemed necessary. The installer is to ensure the pump within the HSTP is sufficient to operate and pressure the proposed irrigation system but does not over pressurize and cause the sprinklers to aerosol. The pipework from the HSTP shall be 25-32mm dia. purple line poly, buried within a 200mm thick sand bed to prevent damage if deemed necessary. Control valves may be necessary to control flow and prevent misting. Spray plumes are to be a maximum of 2m in dia. & 0.5m High. The installer should install non return valves if needed. The area should be constructed so there is no pooling or run off. Two warning signs stating “Recycled Water, Avoid Contact, Do Not Drink” are to be installed around the disposal area. All work is to be carried out by suitably licensed person. If soil or site conditions are found to be different from the investigation or failure is observed, contact us immediately. Performance Solution (Turf Valves) The design has considered site and soil conditions and has also been discussed with the landowner. The irrigation area has been designed using correct DIR and hose design as per local Council requirements. The spray from the sprinklers shall not exceed 500mm in height, 2000mm in dia. and be heavy droplet in nature that prevents misting and drift. All pipework and materials used are to be new, meet relevant standards and be fit for use. The irrigation area must be provided with a treatment plant manufacturer approved method of isolation to allow the homeowner to move the sprinklers on a regular basis. This isolation must not harm the treatment plant and not allow the sprinklers to come during the moving of said sprinklers. (Sprinklers should be moved a minimum of every 3-4 days however this will depend on usage and soil type) Category 4 soils or better will assist in even distribution of treated effluent however regular movement of sprinklers is needed to avoid runoff, ponding, or failure. 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Effluent Disposal Report - RFI - RAL26-0015Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.