                BIO RETENTION BASIN CONSTRUCTION SEQUENCE NOTES:
                THE CONSTRUCTION AND ESTABLISHMENT OF BIO RETENTION BASINS IS TO BE IN ACCORDANCE WITH COUNCILS 'INFRASTRUCTURE
                    INSTALLATION AND CONSTRUCTION REQUIREMENTS MANUAL - SECTIONS 3.4 AND 8.5.1, STAGED AS FOLLOWS:
                1. FUNCTIONAL INSTALLATION - BASIN CONSTRUCTION INCLUDING EARTHWORKS, INLETS, OUTLET STRUCTURES, SUBSOIL DRAINAGE,
                    TRANSITION LAYERS, FILTER MATERIAL, PROTECTIVE LAYERS AND EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE
                    UNDERTAKEN BY THE CIVIL CONTRACTOR. THE FILTER MEDIA WITHIN THE BIO RETENTION BASIN IS TO BE COVERED WITH A
                    PROTECTIVE GEOFABRIC LAYER (BIDIM A12 OR EQUIVALENT), THEN COVERED WITH 75MM OF TOPSOIL AND TURFED OR GRASS
                    SEEDED TO THE SATISFACTION OF COUNCIL. SILT FENCES ARE TO BE ERECTED AROUND THE OUTSIDE OF THE BASIN. BASIN WITH
                    PROTECTIVE LAYERS TO BE UTILISED AS A SEDIMENT BASIN FOR THE DURATION OF SUBDIVISION WORKS AND TO COMPLETION OF                                                                                                                                                                                                             FILTER MEDIA - DEPTH 600mm SANDY
                    BUILDING CONSTRUCTION PHASE. ACCEPTANCE OF THE COMPLETED SUBDIVISION WORKS ON AND OFF MAINTENANCE BY COUNCIL IS                                                                                                                                                                                                             LOAM CONSISTENT WITH CURRENT
                    TO EXCLUDE THE PROTECTIVE LAYERS WITHIN THE BIO BASINS. CONTRACTOR TO ENSURE INVERT LEVELS OF ALL SUBSOIL DRAINS                                                                                                                                                                                                            FAWB SPECIFICATIONS
                    ARE SURVEYED PRIOR TO PLACING TRANSITION LAYER TO CONFIRM A MINIMUM 0.50% GRADE AND SUPPLY WITH AS CONSTRUCTED                                                                                                                                                                                                                 TRANSITION LAYER - DEPTH 100mm
                    DOCUMENTATION.                                                                                                                                                                                                                                                                                                                 COARSE SAND - NOMINAL PARTICLE SIZE 1mm
                2. BUILDING CONSTRUCTION - THE PROTECTIVE GEOFABRIC AND GRASS LAYER AND THE EROSION AND SEDIMENT CONTROL MEASURES                                                                        C.I. CAP. EXTEND CAP TO                                               150mm x 150mm CONCRETE
                    ARE TO REMAIN IN PLACE DURING THE BUILDING CONSTRUCTION PHASE. THE BUILDING CONSTRUCTION PHASE IS TO BE THE TIME                                                                     APPROX. 100mm ABOVE                                                   SURROUND TO CLEANOUT RISER                                                             LINER TO EXTEND 300mm INTO MEDIA
                    FOR COMPLETION OF 75% OF THE BUILDING CONSTRUCTION AND SITE ESTABLISHMENT WORKS ON ALLOTMENTS OR 12 MONTHS                                                                           BIO-RETENTION SURFACE.                                                                                                                                       AND BE FIXED TO PERIMETER OF PIT
                    FOLLOWING HAND OVER OF ROAD TO COUNCIL (FROM A SUCCESSFUL OFF MAINTENANCE INSPECTION) AND SUBJECT TO                                                                                 SCREW CAP FIXED USING 3 SCREWS
                    SUCCESSFUL INFILTRATION TEST (REFER NOTE 4 FOR DETAILS), WHICHEVER IS SHORTER. THE MAINTENANCE OF THE BASINS                                                                                                                                                                STORMWATER QUALITY W.S.L.
                    INCLUDING INLETS, OUTLETS AND EROSION AND SEDIMENT CONTROL MEASURES IS TO BE UNDERTAKEN BY THE CIVIL CONTRACTOR




                                                                                                                                                                                                                                                                                                 0.30m
                    FOR THE DURATION OF THE BUILDING CONSTRUCTION PHASE.                                                                                                                             EXTEND LINER 300mm
                3. OPERATIONAL ESTABLISHMENT - FOLLOWING COMPLETION OF THE BUILDING CONSTRUCTION PHASE, THE TURF, TOPSOIL AND                                                                        UNDER TOPSOIL AND PIN                                                                                                                                                                          TYPE 1 FIELD INLET
                    PROTECTIVE GEOFABRIC IS TO BE REMOVED AND THE BASIN RE-PLANTED WITH VEGETATION AND LANDSCAPING AS PER THE                                                                        TO EMBANKMENT                                                                                                                                                                                  SURFACE LEVEL,
                                                                                                                                                                                                                                                                                                                                                                                                    INVERT LEVEL, AND




                                                                                                                                                                                                                                                                         50mm MIN.
                    LANDSCAPE DESIGN DRAWINGS. WORKS UNDERTAKEN FOR OPERATIONAL ESTABLISHMENT ARE TO BE UNDERTAKEN BY OTHERS                                                                             SUBSOIL DRAIN CLEANOUT - PVC                   0.50m




                                                                                                                                                                                                                                                                          COVER
                    AND WILL BE SUBJECT TO A SEPARATE ACCEPTANCE BY COUNCIL FOR ON AND OFF MAINTENANCE.                                                                                                                                                  MIN.                                                                                                                                       SIZE AS SPECIFIED.
                                                                                                                                                                                                         PIPE (NON SLOTTED) AND CONNECTOR
                4. IN-SITU INFILTRATION TEST - AN IN-SITU INFILTRATION TEST WILL BE REQUIRED PRIOR TO ON-MAINTENNACE BEING GRANTED BY                                                                    CLEANOUTS AT HEAD OF SUBSOIL
                    COUNCIL. THE TEST WILL NEED TO ACHIEVE AN AVERAGE RATE OF 120mm/h INFILTRATION (WITHIN APPROPRIATE TOLERANCES) WITH




                                                                                                                                                                                                                                                                                                                                                             50mm
                                                                                                                                                                                                         DRAIN AS SHOWN ON PLAN




                                                                                                                                                                                                                                                                                                                                                              MIN
                    AT LEAST 3 SAMPLE LOCATIONS AROUND THE BASIN. ANOTHER IN-SITU INFILTRATION TEST WILL BE REQUIRED FOR
                    OFF-MAINTENANCE.                                                                                                                                                                      GRAVEL DRAINAGE LAYER
                                                                                                                                                                                                          - DEPTH VARIES (200mm MIN)
                                                                                                                                                                                                          TO SUIT GRADE OF SUBSOIL PIPES.
                                                                                                                                                                                                                                                                                                         PROVIDE BIDUM A12 OR
                BIO RETENTION PARTICLE SIZE DISTRIBUTION AND PROPERTIES GUIDE:                                                                                                                            5-7mm AGGREGATE NO FINES
                                                                                                                                                                                                                                                                                                         HDPE LINER - REFER NOTE
                SOURCE: (BIOFILTRATION MEDIA GUIDELINES (VERSION 3.01), PREPARED BY THE FACILITY FOR ADVANCING WATER BIOFILTRATION                                                                                                                                                                                                                                                              OUTLET PIPE -
                                                                                                                                                                                                                                   UPVC JOINT TO                                     150Ø SMOOTH WALLED SLOTTED                              225Ø UNSLOTTED PVC
                (FAWB), JUNE 2009.) & (BIO-RETENTION TECHNICAL DESIGN GUIDELINES (VERSION 1) PREPARED BY 'WATER BY DESIGN' (OCTOBER 2012)                                                                                                                                                                                                                                                       SIZE AS SPECIFIED
                                                                                                                                                                                                                                   CONNECTION RISER                                  PVC PIPE - MIN 0.5% GRADE                               COLLECTOR PIPE - MIN 0.5% GRADE
                                                                                                                                                                                                                                   TO SLOTTED PIPE                                   AND MAX 2.5m SPACINGS
                MATERIAL COMPOSITION RANGE GUIDE: FILTER MEDIA SPECIFICATION
                CLAY AND SILT       <3%          (<0.05mm)                                                                                                                                                                                                              TYPICAL BIO RETENTION BASIN SUBSOIL DRAIN
                VERY FINE SAND           5-30%         (0.05-0.15mm)
                FINE SAND               10-30%         (0.15-0.25mm)                                                                                                                                                                                                    CLEAN OUT AND FILTER MEDIA SPECIFICATIONS
                MEDIUM TO COARSE SAND 40-60%           (0.25-1.0mm)                                                                                                                                                                                                                                       SCALE 1:20 (A1)
                COARSE SAND         7-10%        (1.0-2.0mm)
                FINE SAND                <3.0%         (2.0-3.4mm)

                WHILE TOTAL CLAY AND SILT CONTENT OF 3% IS RECOMMENDED, A CLAY AND SILT CONTENT UP TO 6% IS ACCEPTABLE PROVIDED:
                ·  THE SATURATED HYDRAULIC CONDUCTIVITY IS BETWEEN 100mm/hr & 300mm/hr AND
                ·  THE REMAINING MATERIAL MEETS THE COMPOSITION RANGE SPECIFIED ABOVE.
                                                                                                                                                                                                                                                  900x900 PRIMARY                                                                                               900x900 SECONDARY
                SOIL SPECIFICATIONS:                                                                                                                                                                                                              OUTLET CONTROL PIT                                                                                            OUTLET CONTROL PIT
                · TOTAL NITROGEN CONTENT - <1000mg/kg                                                                                                                                                                                                                                                                       RL 100.15m AHD
                · ORTHOPHOSPHATE CONTENT - <80mg/kg SOILS WITH TOTAL PHOSPHORUS CONCENTRATIONS >100mg/kg SHOULD BE TESTED FOR
                                                                                                                                                                                                                                                                                              RL 100.00m AHD
                   POTENTIAL LEACHING. WHERE PLANTS WITH MODERATE PHOSPHORUS SENSITIVITY ARE TO BE USED, TOTAL PHOSPHORUS
                   CONCENTRATIONS SHOULD BE <20mg/kg)                                                                                                                                                                                             2x Ø250 ORIFICE
                · ORGANIC MATTER CONTENT - AT LEAST 3% (w/w). AN ORGANIC CONTENT LOWER THAN 3% IS LIKELY TO HAVE TOO LOW A WATER                                                                                                                  AT IL 99.40
                   HOLDING CAPACITY TO SUPPORT HEALTHY PLANT GROWTH. IN ORDER TO COMPLY WITH BOTH THIS AND THE TOTAL NITROGEN AND
                   ORTHOPHOSPHATE CONTENT REQUIREMENTS, A LOW NUTRIENT ORGANIC MATTER WILL BE REQUIRED.
                · pH - AS SPECIFIED FOR 'NATURAL SOILS AND SOIL BLENDS' 5.5-7.5 (pH 1:5 IN WATER)                                                                                                                                       RL 99.40m AHD




                                                                                                                                                                                                                                                                300mm
                · ELECTRICAL CONDUCTIVITY - AS SPECIFIED FOR 'NATURAL SOILS AND SOIL BLENDS' <1.2 dS/m.



                BIO RETENTION INSTALLATION NOTES:
                THE PLACEMENT OF DRAINAGE, TRANSITION AND FILTER MEDIA LAYERS MUST BE UNDERTAKEN CAREFULLY TO ENSURE CORRECT DEPTH,
                SLOPE AND COMPACTION:
                DEPTH: FILTER MEDIA SHOULD BE INSTALLED AND COMPACTED IN TWO LIFTS FOR DEPTHS OVER 500mm.
                SLOPE: THE TOP SURFACE OF THE DRAINAGE LAYER, TRANSITION LAYER AND FILTER MEDIA LAYER SHOULD BE FLAT. A SPREADER BAR
                SHOULD LEVEL THE SURFACE OF EACH LAYER.                                                                                                                                                                                                                                                                                                     1 x Ø375 RCP
                COMPACTION: THE FILTER MEDIA MUST BE LIGHTLY COMPACTED DURING INSTALLATION TO PREVENT THE MIGRATION OF FINE PARTICLES. THIS                                                                                                                                                   RL 98.00m AHD
                CAN BE ACHIEVED WITH A SINGLE PASS OF A LIGHT ROLLER SUCH AS A DRUM LAWN ROLLER. A VIBRATING PLATE CAN ALSO BE USED TO
                COMPACT SMALL BIO RETENTION SYSTEMS OR 'POZITRACK' LOADER CAN BE USED FOR LARGE SYSTEMS. ENSURE ONLY ONE COMPACTING
                PASS IS MADE OVER THE MEDIA FOR LIGHT COMPACTION.
                ROCK ARMOURING NOTES:
                1.     ROCKS TO BE DURABLE BLUE STONE OR OTHERWISE APPROVED BY SUPERINTENDENT.                                                                                                                     FILTER MEDIA REFER TYPICAL                            SUBSOIL DRAINAGE                                          1 x Ø300 ORIFICE
                2.     EACH ROCK SHALL BE:                                                                                                                                                                                BIORETENTION DETAIL
                         - ANGULAR IN SHAPE (PROMOTES INTERLOCKING)
                         - FREE FROM OVERBURDEN, SPOIL, SHALE AND
                         ORGANIC MATERIAL.
                3.     NEITHER BREADTH NOR THICKNESS OF A SINGLE ROCK SHALL BE LESS THAN ONE HALF ITS LENGTH (ie THE ROCK SHALL BE CHUNKY                                                                                                                                        NORTHERN BASIN OUTLET PIT DETAIL
                       RATHER THAN FLAT).                                                                                                                                                                                                                                                                 SCALE 1:20 (A1)
                4.     ROCKS TO BE PLACED AND INTERLOCKED INTO POSITION AND BUILT UP TO FINAL LEVELS SHOWN, ENSURING COVERAGE OF                                                                                                                                                                          SCALE 1:40 (A3)
                       GEOFABRIC.
                5.     GAPS BETWEEN THE ROCKS ARE TO BE FILLED BY DROPPING SMALL ROCKS INTO GAPS AND LOCKING INTO POSITION WITH A
                       CROWBAR.
                6.     ALL ROCKWORK TO BE PLACED OVER BIDIM A24 OR EQUIVALENT.
                7.     FOR ROCK SIZED SPECIFIED AS D50 ON THE DRAWINGS, THIS CORRESPONDS TO THE MEDIAN DIAMETER OF WHICH HALF OF THE ROCK
                       SIZES SHALL BE GREATER AND HALF OF THEM SHALL BE SMALLER. THE ROCK SHALL BE WELL GRADED AND HAVE A MAXIMUM SIZE
                       NO GREATER THAN 30% AND A MINIMUM SIZE NO LESS THAN 30% SMALLER THAN D50. FOR EXAMPLE IF D50 = 400mm IS SPECIFIED, THE
                       EQUIVALENT ROCK DIAMETER RANGES FROM 280 to 520mm.
                                                                                                                                                                                                                                                                                                                                                                                N.S.C. REF NO. MCU15/0111 & REC15/0031
REVISION    DATE     ISSUE DETAILS                                                DRAWN   DESIGN   DRAWN    STATUS                                                SCALE                                                  CLIENT                                                                                                       PROJECT                                               DRAWING TITLE


   1       30.01.17 ORIGINAL ISSUE                                                 NA      BF                               FOR APPROVAL                                                                                          PALM LAKE WORKS PTY LTD                                                                                      PALM LAKE RESORT                                      STORMWATER QUALITY
   2                                                                                                                      NOT FOR CONSTRUCTION                                                                                                                                                                                                     STAGE 4 & 5
   3                                                                                                                                                                  1:20   0.2   0   0.2   0.4   0.6   0.8   1   A1
                                                                                                                                                                                                                                                                                                                                                                                                       NOTES & DETAILS
   4                                                                                               DESIGN   APPROVED                                                  1:40                                         A3                                                                                                                    19 TRADING POST ROAD - COOROY
   5                                                                                                        ANDREW McPHAIL                RPEQ 6921                                                                                                                                                                                                                                         PROJECT No.             DRAWING No.   REVISION
   6                                                                                                                                                                                                                                                                                                                                  DISCLAIMER
   7
                                                                                                                                                                                                                                                                                     C 2015      www.calibreconsulting.co
                                                                                                                                                                                                                                                                                                                                                                                            16-003302
                                                                                                                                                                                                                                                                                                                                      ALL DIMENSIONS TO BE CHECKED ON SITE BY CONTRACTOR PRIOR TO
                                                                                                                                                                                                                                                                                                                                      CONSTRUCTION. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.
                                                                                                                                                                                                                                                                                                                                                                                                                          4702       A
   8                                                                                                        FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD
Log in to download the original file

16-003302-4702.pdf · 369 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.