Original source · versioned page text
Appendix B - Engineering Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPROPOSED DRIVEWAY & CROSSOVER RENEWAL AT ‘CRYSTAL SHORES’ 17 HENDERSON STREET, SUNSHINE BEACH QLD 4567 FOR:- M-DESIGN DRAWING DATE NUMBER DESCRIPTION REVISION DRAWING FOR THE INSPECTION OF DRIVEWAYS AND ISSUED CROSSOVERS, ETC, IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL GRADIENTS 2 an . ae AND SETOUT IS CORRECT. THE ENGINEER GB TURNING CIRCLES 1: ENTRY PA 71/09/2021 IN Mt MOCKNESSES a supvey = _ x ; ay = ST DRAWING WILL BE REQUIRED CONFIRMING THE (6 TURNING CIRCLES 2: EXIT Pt 2109/2021 FNGINEER nO Rony te nsteucinN THE a TURNING CIRCLES 3: ENTRY Pt 2109/2021 : (8 TURNING CIRCLES 3: EXIT Pt 71/09/2021 9 TURNING CIRCLES 4: ENTRY PI 71709/2021 RIENMAC ervurp (10 TURNING CIRCLES 4: EXIT PI 24/09/2021 ABN, 52 0f0 666 430 AC 010 666 430 ci DRIVEWAY SECTIONS Pt 71/09/2021 ee es SUNSHINE COAST OFFICE: SUITE 5, FIRST FLOOR, P;- (07) 5349 0762 SAINT CIRINO, Email;- info@rienmac,net 137 BRISBANE ROAD, Web:- www.rienmac.net (PO BOX 149) MOOLOOLABA OLD 4557 Ne MDESIGN PROJECT; PROPOSED NEW DRIVEWAY AND CROSSOVER AT ‘CRYSTAL SHORES' #17 HENDERSON STREET, SUNSHINE BEACH QLD 4567 REAL PROPERTY DESCRIPTION & COUNCIL: BUP 3585. NOOSA SHIRE COUNCIL DRAWING TITLE: , sus mp as , EGENO CAUTION WITH EXISTING SERVICES COVER PAGE WATERPROOFING OF WALLS AND SLABS IS TO BE TO THE BUILDERS SPECIFICATIONS. THE CONTRACTOR IS TO DETERMINE THE EXACT LOCATION OF H JS THE BULDERS RESPONSIBLITY TO COMFRN jut LEVELS, SETOUT AND crs cNTaES OTHERWISE ALL EXISTING SERVICES IN THE VICINITY OF THE PROPOSED J |Designed: PLR Drawn: TP WORK. MN MINIMUM WORKS PRIOR TO THE START OF ANY CONSTRUCTION. THE SCALES: BENET REINFORCEMENT COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO Engineer: PLR|DATE: 2 JULY 21 DO NOT SUBSTITUTE CHANGES ON SITE WILL REQUIRE eo HOLD DOWN, ee EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR. ALTERNATIVE MEMBER TYPES DRAWINGS TO BE UPDATED PRIOR TO Esty EON RNGTH BUTE WELD 213793 C1 P { OR SIZES WITHOUT ENGINEERS THESE WORKS COMMENCING ON SITE, AS Kes PONS TRUCTION. BREAK WRITTEN APPROVAL. PER REGULATORY REQUIREMENTS. US UNDERSIDE rite Person ton Rone Colin nee JOB NUMBER | DWG No. | ISSUE IT IS THE BUILDERS RESPONSIBILITY TO CONFIRM ALL LEVELS, SETOUT AND DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK, REFER ANY DISCREPANCIES TO ENGINEER IMMEDIATELY. PETER RIENECKER - RPEQ 2088 | DO NOT SCALE OFF DRAWINGS. | A3 [SHEET ' OF tt CHECKED: PLR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.