From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
« Cardno . MBK 4.0 TRAFFIC CONSTRAINTS The likely traffic generation and potential impacts from the proposed Noosa North Shore Eco- Tourism Portal are strongly affected by the unique development type and the access restriction caused by the Noosa River ferry. All external traffic management will involve a crossing of the Noosa River on the existing ferry service. The ferry in this particular instance will continue to convey traffic at the same rate, regardless of the traffic generated by visitors to the Noosa North Shore Eco-Tourism Portal. Therefore the expected increase in traffic generation wili be “contained” at the ferry site and will not have an adverse impact in traffic management and intersection movements within the Noosa North Shore Eco-Tourism Portal. The final layout and composition of the Noosa North Shore Eco-Tourism Portal will be determined at Development Permit stage. The following assessment is based on the layout option presented in the illustrative plans included in the Noosa North Shore Eco-Tourism Portal Development Code. Figure 2 presents an illustrative access layout plan based upon the plans presented in the Development Code. Poiential traffic generation from ‘eco-cabins’ has been considered based upon information on two recent projects. A proposed development ait Stradbroke Island adopted a generation rate of . 4 irips/day for the cabins in the basis of the extensive tourism sites remote from the accommodation site. At Noosa North Shore it is considered that the potential daily trip level for visitors is less and therefore 3 vehicle trips per cabin has been adopted as a conservative vehicle generation rate. The lodge accommodation is primarily aimed at budget travellers who will typically arrive by bus or be met at the ferry by a mini bus owned/run by the accommodation operators and therefore 0.5 vehicle trips per room has been adopted as the generation rate. It is anticipated that the interpretive centre will attract its own visitors and therefore generate traffic in its own right. However the expecied traffic increase is perceived to be minimal as the visitors will be predominantly drawn from those already visiting the Noosa North Shore and, in any case, traffic will be controlled by the conveyance rate of the ferry. A traffic generation assumption of 60 trips has been adopied for the interpretive centre. Oo The cafe will be largely used by persons on site but could also attract outside trips especially from day trippers. A daily generation rate has been adopted as 120 trips/100 m? GFA. A nominal allowance has been made for staff and service vehicles. The total site traffic generation is forecast to be: 90 Eco-Cabin at 3.0 trips/day = 270 trips 80 Lodge Room at 0.5 trips/day = 40 trips ee 140 m? _ Interpretive Centre__ = 60 trips 130 m? Café at 120 trips/1 00m2 GFA = 150 trips Staff and Servicing Allowance = 40 trips Toial Daily Trips = 560 trips PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 L7296-03\Reporf\FINAL REPORT - 18Sept03.doc Commercial in Confidence Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.11A.tifRelated documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
- TIF
No other editions are linked here.