Council archive · source document
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba Insert report title here Water Supply and Sewerage Insert project name Analysis Insert job reference 5101-19 Prepared for Northbrook Corporation Pty. Ltd. 17 September 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 62 pages
Page 2
Noosa on Weyba
Water Supply and Sewerage Analysis
Document Information
Prepared for Northbrook Corporation Pty. Ltd.
Project Name Water Supply and Sewerage Analysis
File Reference Noosa on Weyba WSS Analysis.docm
Job Reference 5101-19
Date 17 September 2013
Contact Information
Cardno (Qld) Pty Ltd
ABN 57 051 074 992
Level 11 Green Square North Tower
515 St Paul’s Terrace
Fortitude Valley Qld 4006
Locked Bag 4006 Fortitude Valley
Queensland 4006 Australia
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 7 3369 9822
[email protected]
www.cardno.com.au
Document Control
Version Date Author Author Reviewer Reviewer
Initials Initials
1 10 Oct 2012 Joshua Lake JL Tod Larwill TL
2 22 Oct 2012 Joshua Lake JL Tod Larwill TL
3 28 Nov 2012 Joshua Lake JL Tod Larwill TL
4 17 Sept 2013 Joshua Lake JL Matthew Walsh MW
© Cardno 2013. Copyright in the whole and every part of this document
belongs to Cardno and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media
to any person other than by agreement with Cardno.
This document is produced by Cardno solely for the benefit and use by the
client in accordance with the terms of the engagement. Cardno does not
and shall not assume any responsibility or liability whatsoever to any third
party arising out of any use or reliance by any third party on the content of
this document.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page ii
Page 3
Noosa on Weyba
Water Supply and Sewerage Analysis
Table of Contents
1 Introduction 1
2 Noosa on Weyba Population 2
3 Desired Standards of Service 3
3.1 Water Supply 3
3.2 Sewerage 4
4 Noosa on Weyba Flow Projections 5
4.1 Water Supply Demands 5
4.2 Sewerage Flows 5
4.3 Integration with IWCMP 6
5 Water Supply Network Analysis 7
5.1 Servicing Strategy 7
5.2 External Network 7
5.3 Noosa on Weyba Network 8
6 Sewerage Network Analysis 9
6.1 Servicing Strategy 9
6.2 Network Analysis 9
6.3 Noosa on Weyba Network 12
6.4 Noosa Heads Sewerage Treatment Plant 14
7 Conclusions 15
Appendices
Appendix A Figures
Appendix B Noosa On Weyba Structure Plan
Appendix C Unitywater Hydraulic Network Analysis
Appendix D Unitywater Response
Appendix E Sunshine Coast Regional Council and Unitywater Request for Further Information
Appendix F Cardno Response to SCRC And Unitywater Request For Information
Appendix G Meeting Minutes And Record Of Conversation With Unitywater
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page iii
Page 4
Noosa on Weyba
Water Supply and Sewerage Analysis
Tables
Table 2-1 Noosa on Weyba Population Projections 2
Table 3-1 Adopted Water Supply Network Planning DSS 3
Table 3-2 Adopted Sewerage Network Planning DSS 4
Table 4-1 Water Supply Demands 5
Table 4-2 Sewerage Flow Projections 5
Table 6-3 NVL040 Design capacities 11
Table 6-5 Noosa on Weyba Proposed Pump Station Details 13
Table 6-6 Noosa on Weyba Proposed Pump Station Detail 13
Table 6-7 Noosa STP Design Capacity and Current Plant Loadings 14
Table E-1 Cardno’s response to Part A of the RFI 9
Figures
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results 11
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page iv
Page 5
Noosa on Weyba
Water Supply and Sewerage Analysis
1 Introduction
This report has been updated in response to the Request for Information (RFI) from Sunshine Coast
th
Regional Council dated 28 February 2013 (Appendix E) . The responses to this request are contained
within the report. We have provided an index in Appendix F, which locates the responses to the relevant RFI
items within the report for ease of reference.
Cardno were commissioned to undertake a water supply and sewerage analysis of the proposed Noosa on
Weyba development.
The Noosa on Weyba development site comprises of 303 hectares, with 139.5 hectares of the site being set
aside for Koala Habitat protection and enlargement of the Noosa National Park and an additional 105.5
hectares to remain as environmental protection land. A Preliminary Approval overriding the Planning Scheme
under Section 242 of the Sustainable Planning Act 2009 is being applied for, for this development.
The net development area comprises approximately 58 hectares made up of Lot 2 on SP179590, Lot 53 on
SP163571, Lot 11 on RP893393 and Lot 12 on RP893393. The proposed development is planned to
accommodate approximately 2,000 people and is intended to include a mix of residential, retirement living,
age care and retail uses.
The development is not located within the Urban Footprint for the South East Queensland Regional Plan
(SEQRP) and is consequently outside of Unitywater’s headworks area. The site has recently been declared
a Biodiversity Development Offset Area (BDOA). This effectively allows for a development application for a
form of urban development to be submitted on land that is otherwise zoned for rural purposes.
A summary of the BDOA declaration is detailed below:
> On 3 February 2012 the Minister for the DLGP, the Hon Paul Lucas MP, declared the site to be a
Biodiversity Development Offset Area (BDOA) project which determines that 139.5ha of the site is to be
dedicated to the State for perpetual Koala Habitat protection;
> Under the BDOA, the 139.5ha land is called the “Send” land, which then leaves a balance of 163.5ha of
gross development land also called the “Receive” land for potential development approval for a form of
urban development;
> The BDOA declaration over-rides the Urban Footprint controls in the SEQRP and determines that a
Development Application (DA) can be lodged over the 163.5ha of Receive land noting that all normal SPA
requirements must be met for DA approval to be properly considered and potentially granted;
The site represents an infill of land between the Urban Footprint to the north and the existing Weyba Downs
large lot residential development to the south.
The proposed development is located within the Sunshine Coast Regional Council (SCRC). SCRC do not
undertake water supply and sewerage planning with the region and all water and sewer planning is deferred
to Unitywater. Where necessary the relevant codes from either the SCRC or Unitywater have been adopted
for this assessment. This report will detail the overall servicing strategy for water and sewer for the proposed
Noosa on Weyba development. It should be noted that subsequent reporting and confirmation of strategies,
particularly the internal networks will be undertaken when the development application for each precinct is
undertaken.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 1
Page 6
Noosa on Weyba
Water Supply and Sewerage Analysis
2 Noosa on Weyba Population
Unitywater utilise an Equivalent Person (EP) population as the basis for their water supply and sewerage
planning.
The proposed development will occur in precincts comprising of a mix of residential uses, detached lots and
multi residential units and aged care facilities. In addition a portion of the development will comprise of non-
residential use; retail and leisure. The proposed development is detailed in Noosa on Weyba Precinct
Structure Plan),Appendix B. The adopted layout forms the basis of the development of an EP population for
the Noosa on Weyba development.
Based on the relevant Council planning and projected lot yields an EP loading was developed for the site.
The EPs developed for this analysis are indicative of the total density expected on the site and are detailed
in Table 2-1.
Table 2-1 Noosa on Weyba Population Projections
Quantity EP Density Adopted EP
Residential Lots 549 lots 3.3 EP x lot 1,574
Mixed Use Residential
2.5 EP x lot (assumed 2
(Townhouses/Units/Retirement 327 Units 752
bedroom unit)
Village)
2
Non Residential 4,435m GFA 100 EP per ha 44
TOTAL 2,370
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 2
Page 7
Noosa on Weyba
Water Supply and Sewerage Analysis
3 Desired Standards of Service
Unitywater adopt the South East Queensland (SEQ) Design and Construction Code (July 2013) as the basis
for water supply and sewerage planning. Cardno have adopted these codes to assess the Noosa on Weyba
development.
3.1 Water Supply
The key aspects of the adopted Desired Standards of Service (DSS) for water supply planning are detailed in
Table 3-1.
Table 3-1 Adopted Water Supply Network Planning DSS
Item Detail
280 L/EP/d.
Average Day (AD)
Based on 230 L/EP/d + allowance for leakage/losses (50 L/EP/d).
Peaking Factors
Low/Medium Density High Density
Category Commercial/Industrial
Residential Residential
Mean Day Maximum Month
1.5 1.5 1.5
(MDMM:AD)
Peak Day (PD:AD) 2 2 2
Peak Hour (PH:PD) 2 1.75 1.4
Detached Res (<= 3 stories)– 15Ls for 2hrs w background Demand highest of 2/3
PH or AD
Multi story Res => 4 levels – 30L/s for 4 hours w background Demand highest of
Fire Fighting Flows
2/3 PH or AD
Commercial/Industrial buildings – 30L/s for 4 hours w background Demand of PH
demand (between 10am and 4pm)
21m at property boundary (under normal operating conditions (PH))
Minimum Pressure
12m min at the main at the hydrant; Min of 6m
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 3
Page 8
Noosa on Weyba
Water Supply and Sewerage Analysis
3.2 Sewerage
The adopted DSS for sewer is detailed in Table 3-2.
Table 3-2 Adopted Sewerage Network Planning DSS
Item Detail
Average Dry Weather Flow (ADWF) 180 L/EP/d
Peak Wet Weather Flow (PWWF) 900 L/EP/d
Minimum velocity @ PDWF 0.7 m/s
Gravity Main Design Criteria Maximum velocity @ PWWF 3 m/s
Depth of flow @ PWWF 0.75d of pipe diameter
Minimum [email protected] m/s
Rising Main Design Criteria Preferred Velocity 1.0-1.5 m/s
Maximum velocity @ PWWF 2.5 m/s
For SPS with 2 pumps, EACH pump delivers minimum 5 x
ADWF
Pump Station Design Criteria Overflows should not occur at flow < 5 x ADWF or C1 x
ADWF (whichever is the larger).
6hrs at ADWF of “in catchment storage
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 4
Page 9
Noosa on Weyba
Water Supply and Sewerage Analysis
4 Noosa on Weyba Flow Projections
The water supply demands and sewerage flows for the proposed Noosa on Weyba development are based
on the adopted DSS and population projections.
4.1 Water Supply Demands
The projected water supply demands for the Noosa on Weyba development are provided in Table 4-1 below.
Table 4-1 Water Supply Demands
Maximum 2/3 Maximum Required
Average Day
EP Hour Hour Fire Flow
(ML/d) (L/s) (L/s) (L/s) (L/s)
2,370 0.66 7.68 28.67 19.1 30
4.2 Sewerage Flows
The projected sewerage flows for Noosa on Weyba are provided in Table 4-2 below.
Table 4-2 Sewerage Flow Projections
Peak Dry
Average Day Weather Flow Peak Wet Weather
Weather Flow
(ADWF) Flow (PWWF)
EP (PDWF)
(ML/d) (L/s) (L/s) (L/s)
2,370 0.43 4.94 12.76 24.69
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 5
Page 10
Noosa on Weyba
Water Supply and Sewerage Analysis
4.3 Integration with IWCMP
An integrated water cycle management plan (IWCMP) has been prepared as part of the Noosa on Weyba
development. This report references Integrated Watercycle Management Plan Noosa on Weyba
Development (Gilbert and Sutherland, August 2012).
The ICWMP considered several servicing options for the development. The Gilbert and Sutherland report
recommends, Option 4 as the preferred servicing strategy. In summary:
Option 4 assumes sewage is treated off-site at the Noosaville STP and maximises rainwater harvesting at
each residence, typical of IWCWMP systems in high rainfall areas. On site rainwater harvesting assists to
achieve a reasonable reduction in potable water demands.
An overview of the Option 4 servicing strategy is provided below:
Domestic water supply: sourced from the municipal supply and domestic rain tanks (for toilet cisterns
and laundry);
Wastewater management: sewerage from development precincts to the Noosaville STP;
Domestic garden irrigation supplied from the domestic rain tanks;
Roof tank overflow and stormwater flows through bio-retention swales and basins, prior to creek
discharge.
The domestic rain tank system in Option 4 lends itself to staged developments and does achieve compliance
with the demand off-set targets set in the Queensland Development Code.
While the reduction of potable demand via the use of rainwater tanks was considered, the overall sizing of
infrastructure, particularly water supply is governed by the supply of fire fighting flows to the site.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 6
Page 11
Noosa on Weyba
Water Supply and Sewerage Analysis
5 Water Supply Network Analysis
This section details the water supply strategy and infrastructure required to service the proposed Noosa on
Weyba development. It should be noted that subsequent reporting and confirmation of strategies, particularly
the internal networks will be undertaken when the development application for each precinct is undertaken.
Planning for the Noosa water supply network was generally unavailable. Discussion with Unitywater staff
resulted in a request for Unitywater through their preferred agents to assess the Noosa water supply network
with the addition of the proposed development.
In preparing this water supply servicing strategy consideration was given to the following report prepared by
MWH for Unitywater.
> Noosa on Weyba Water Network Performance Assessment, (MWH, 2012).
5.1 Servicing Strategy
The proposed development would connect to the existing network within the Noosa Industrial District Meter
Area (NIDMA) and serviced via the Tewantin Reservoirs.
The existing Noosa water supply network was assessed and with suitable connections to the development
identified. An existing 600 mm diameter trunk main along Eenie Creek Road, is the primary service main for
Noosa and is in close proximity to the proposed development. In addition, an existing residential
development is located immediately north of the proposed Noosa on Weyba development and is serviced via
a 150 mm diameter main. It is proposed to utilise both the 600 mm trunk and the smaller 150 mm diameter
mains to service the development.
A primary service 250 mm diameter main through the development along Walter Hay Drive, is proposed to
connect to the 600 mm diameter trunk main at the intersection of Eenie Creek Road and Walter Hay Drive. A
secondary 200 mm diameter connection is proposed to the 150 mm diameter mains along Lake Entrance
Boulevard currently servicing the properties on the western boundary of the proposed development to assist
in network connectivity.
5.2 External Network
The conclusions of the MWH report were:
> Under maximum hour demand conditions Unitywater DSS were met at the proposed development site
and within Noosa Industrial DMA during the 2038 planning horizon.
> Under fire flow demand conditions Unitywater DSS were met at the proposed development site and within
Noosa Industrial DMA during the 2038 planning horizon.
> The storage assessment identified that the inclusion of the Noosa on Weyba development brings forward
storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS. A total storage
deficiency of the Tewantin Reservoir of 1.64 ML was identified at the 2031 planning horizon.
> No augmentation of the existing network is required.
Further detail of the MWH report can be found in Appendix C.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 7
Page 12
Noosa on Weyba
Water Supply and Sewerage Analysis
5.3 Noosa on Weyba Network
A network of trunk mains and smaller reticulations mains is required to maintain Unitywater’s DSS within the
Noosa on Weyba development. A hydraulic model was developed based on the results of the MWH report.
The network pressures identified in the MWH report have been adopted for the analysis of the Noosa on
Weyba development.
A primary connection to the existing 600mm diameter trunk main along Eenie Creek Road via a 250 mm
diameter main along Walter Hay Drive is proposed. This main will provide the bulk of flow to the development
and is required to maintain non-residential fire flows (30l/s) to the development.
A second 200 mm diameter connection to the existing mains at Lake Entrance Boulevard should be
considered. This main would assist in the provision of flow to the western properties within the Noosa on
Weyba development. It is not critical to maintain supply pressures as per the DSS to the proposed
development. However, the main would reduce dead ends in the proposed network. An internal 200 mm
diameter distribution main is proposed to convey flow to each precinct within the development. Some smaller
150 mm diameter mains will be required to maintain the fire flow DSS. The rest of the network would
comprise 100mm diameter mains as required to service properties. Due to the mains proposed to service the
development, the ownership and operation of the proposed infrastructure would be granted to Unitywater.
Figure 1 (Appendix A), illustrates the NIDMA network and the proposed mains (150mm and greater) to
service the Noosa on Weyba development. Final alignment and configuration of the network will be
determined during the determination of the final development of the lot layouts.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 8
Page 13
Noosa on Weyba
Water Supply and Sewerage Analysis
6 Sewerage Network Analysis
This section details the sewerage strategy and infrastructure required to service the proposed Noosa on
Weyba development. It should be noted that subsequent reporting and confirmation of strategies, particularly
the internal networks will be undertaken when the development application for each precinct is undertaken
Planning for the Noosa sewerage network was not available for this analysis. Discussion with Unitywater
staff had indicated that planning for the region was out-dated, having last been undertaken in 1996.
However, general consensus with Unitywater was that the network is generally adequate with little operating
issues. Requests for information regarding the Noosa sewerage network in the vicinity of the development
were made to Unitywater and catchment data was provided in order to undertake the analysis.
6.1 Servicing Strategy
The proposed development is within the Noosa Coastal sewerage scheme. This scheme consists of multiple
local catchments that discharge to the Noosa Heads STP.
The existing Noosaville Industrial catchment is a small local sewerage catchment containing three small
pump stations, discharging to a larger pump station (NVL011). This pump station discharges via a 200 mm
diameter rising main into the trunk gravity mains along Eenie Creek Road. Twin gravity mains convey flow
from the Noosaville Industrial and other catchments to a large pump station NVL040. NVL040 captures flow
from all catchments to the west of Eenie Creek and conveys flow via a 450 mm diameter rising main to the
Noosa heads STP.
It is proposed that the Noosa on Weyba development would discharge to the Noosaville Industrial
catchment. An initial connection to NVL011 would be via a rising main from the site, with the development to
the west of the site proposed to discharge to the local gravity mains along Lake Entrance Boulevard.
6.2 Network Analysis
Unitywater provided all relevant data to undertake an assessment of the Noosaville Industrial catchment and
the primary conveyance infrastructure to the Noosa Heads STP. This included:
> Pump Station design data (wet well details, pump curves)
> Network GIS
- Catchment populations
- Gravity main and rising main data.
6.2.1 Pump Station NVL011
Pump station NVL011 services an existing population of approximately 2,060 EP with minimal growth
projected for the catchment, It will ultimately service 2,900 EP post 2026.
NVL011 pumps through a 200 mm diameter rising main and discharges to parallel 600 mm and 525 mm
diameter gravity sewers.
The inclusion of the Noosa on Weyba 2,370 EP represents a doubling of the ultimate catchment population.
An analysis of pump station NVL011 and downstream infrastructure was undertaken to assess the impact of
the development.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 9
Page 14
Noosa on Weyba
Water Supply and Sewerage Analysis
The existing design details of NVL011 and its rising main are shown in Table 6-1.
Table 6-1 NVL011 and Rising Main Design Capacities
Total Total Rising Velocity at Headloss at
Pump
Design Pump Power Main Total Pump Total Pump
Head
Capacity Flow Rating Diameter capacity capacity
EP
(L/s) (m) (kW) (mm) (m/s) (m)
1 1 1 1
3,267 34 23.6 22.00 200.00 1.08 15.15
Note: 1. Based on Pump Curve NP3171.181 and design operating point
6.2.1.1 NVL011 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 45%. The increase in population triggers an augmentation of NVL011. Based on the design capacity of
the pump station, it has sufficient capacity to accommodate a portion of the proposed Noosa on Weyba
development after 2016. The spare capacity available at NVL011 represents approximately 20% of the full
yield for the Noosa on Weyba development.
The ultimate size of the NVL011 with the inclusion of the Noosa on Weyba development is presented in
Table 6-2.
Table 6-2 NVL011 Ultimate Capacities
Required
Velocity Headloss
Single Rising
Design Design at Total at Total
Pump Main
PWWF Head Pump Pump
Design Existing power Diameter
capacity capacity
Scenario EP (kW)
(L/s) (m) (kW) (mm) (m/s) (m)
Ultimate 2,909 30.30 24.50 22.00 200 1.08 15.15
Ultimate with
1 5,280 55.00 41.00 34.00 200 1.75 37.04
Development
Note: 1 – Based on nominal pump station data and GIS information for the Rising main.
6.2.2 Eenie Creek Road Trunk Mains
Analysis of the parallel trunk 600 m and 525 mm diameter gravity mains along Eenie Creek Road has been
undertaken. A trunk network model was constructed in H20Map SWMM to represent the trunk mains from
the discharge point from NVL011 and the catchments to the north to NVL040.
The analysis indicated that the trunk mains do not surcharge with the inclusion of the Noosa on Weyba
Development as illustrated in the Figure 6-1
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 10
Page 15
Noosa on Weyba
Water Supply and Sewerage Analysis
Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results
6.2.3 Pump Station NVL040
The parallel gravity mains discharge into the existing major pump station NVL040. This pump station collects
flows from several local catchments and conveys flow via a 450 mm diameter rising main to the Noosa
Heads STP. It services an existing population of almost 19,600EP with an ultimate service population near
23,500EP.
The inclusion of the Noosa on Weyba 2,370EP represents a 10% increase in service population ultimately.
An analysis of this pump station and downstream infrastructure was undertaken to assess the impact of the
development.
The existing design details of NVL040 and its rising main are detailed in Table 6-3.
Table 6-3 NVL040 Design capacities
Velocity Headloss
Total Total Rising
Pump at Total at Total
Pump 1 Power Main
Existing 1 Head 1 Pump Pump
Flow Rating Diameter
capacity capacity
EP
(L/s) (m) (kW) (mm) (m/s) (m)
21,600 225.00 41.80 123.00 450 1.38 11.19
Note: 1. Based on Pump Curve CS3231 /735and design operating point
6.2.3.1 NVL040 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 10%. The increase in population does not trigger an augmentation to NVL040. It is expected that the
existing pump should be adequate to accommodate the increase in flow. However it would be operating at a
lower efficiency. Table 6-4 details the pump station requirements with the inclusion of the proposed
development.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 11
Page 16
Noosa on Weyba
Water Supply and Sewerage Analysis
Table 6-4 NVL040 Ultimate Capacities
Required
Rising Velocity at Headloss
Design Design Single
Main Design at Design
Design PWWF Head Pump
Existing EP Diameter Flow Flow
Scenario power
(L/s) (m) (kW) (mm) (m/s) (m)
Ultimate 23,474 244.5 21.00 78 450 1.08 15.15
Ultimate
with
25,845 269 23.00 97 450 1.69 16.30
Developme
nt
6.3 Noosa on Weyba Network
An internal sewerage network to service the Noosa on Weyba development has been identified. It is noted
that in the SEQ Design and Construction Code, that a conventional system (i.e. gravity mains and pump
stations) are preferred over alternative strategies. However, with final lot configurations to be confirmed a
definitive internal network will be identified at a later date.
Alternative servicing strategies such as the use of low pressure sewers has been considered for this
development. For the purposes of this report a conventional system has been adopted, to demonstrate the
servicing strategy for conveyance from the site to the external network.
6.3.1 Gravity Mains
A network of gravity mains, ranging in size from 150 mm to 225 mm are required to service the development.
Analysis has indicated that the use of gravity mains at minimum grade will be able to service the
development.
Properties within Precinct 2 to the western edge are proposed to connect via 150 mm gravity mains to the
existing sewers along Lake Entrance Boulevard. The combined PWWF for these properties is 2.6L/s. The
existing development along Lake Entrance Boulevard currently discharging to the existing 150 mm gravity
main contribute approximately 4.6L/s at PWWF. The impact of these flows from the Noosa on Weyba
development on this network is expected to be minimal and maintain Unitywater’s DSS.
The reminder of the network in Precinct 1 will discharge to a central pump station servicing the development
and discharge it too the Unitywater pump stations SPSNV011. Details of the pump stations proposed to
service the Noosa on Weyba development is detailed in Section 6.4.
Development within the Precinct 1 (to the south of the site) may require multiple pump stations due to the
topography of the site and the configuration of the development area due to environmental constraints,
Details of the pump station capacities and discharge rising main is detailed in Table 6-5.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 12
Page 17
Noosa on Weyba
Water Supply and Sewerage Analysis
Table 6-5 Noosa on Weyba Proposed Pump Station Details
Pump Local Service Total
Pump Station Size (kW) Rising main Diameter (mm)
Station ID Population (EP) Service EP
SPSNWA 679. 679 1.56 100
SPSNWB 132 811 1.50 80
SPSNWC 409 1,220 6.87 100
A small portion of development in Precinct 1 is considerably lower than the surrounding development.
Servicing of this site may not be possible via gravity, as identified in Figure 2.(Appendix A) A small grinder
pump servicing this site may be required, discharging to the nearest gravity main.
Figure 2 illustrates the proposed alignment of gravity mains in the development.
6.3.2 Low Pressure Sewer Pump Stations
Due to the topography of the site, a low pressure sewer network may be proposed for these areas. Typically
confined to the south east of the site, properties in this catchment will each have a small pump station
conveying flow to the northern gravity catchment within the site.
6.4 Conventional Sewerage Pump Station
To discharge to the existing pump station NVL011, the Noosa on Weyba pump station (SPSNW1) would
need to discharge, via 400 metres of 150 mm diameter rising main, along Walter Hay Drive. As detailed in
Section 6.2.1, discharging the flow to NVL011 would require an upgrade of this pump station.
Details of the pump station capacities and discharge rising main is detailed in Table 6-6.
Table 6-6 Noosa on Weyba Proposed Pump Station Detail
Total Pump
Local Pump Rising
Pump Station Pump Maximum
Service Total Station main
Station Capacity Head Velocity
Population Service EP Size Diameter
ID (PWWF – (m) (m/s)
(EP) (kW) (mm)
L/s)
SPSNW1 896.7 2,117 22 20.05 6.67 150 1.25
Figure 2 (Appendix A) illustrates the proposed sewerage servicing strategy. Due to the mains proposed to
service the development, the ownership and operation of the proposed infrastructure would be granted to
Unitywater
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 13
Page 18
Noosa on Weyba
Water Supply and Sewerage Analysis
6.5 Noosa Heads Sewerage Treatment Plant
Flow from the Noosa on Weyba development is proposed to be conveyed and treated at the Noosa Sewage
Treatment Plant (STP). Based on advice from Unitywater officers and publically available documentation,
preliminary investigations have indicated that the Noosa STP is at capacity. Augmentation to rectify the
capacity issues at the Noosa STP has been identified by the former Noosa Shire Council and has been
included in past Council budget minutes dating from 2008. Current advice from Unitywater has indicated that
the augmentation of the Noosa STP would be subject to review in 2012.
Analysis of the Noosa STP was detailed in a paper presented at the 2010 AWA Conference entitled, ‘So Tell
Me Again, Why Do I Need To Upgrade An STP With 225 Ml/D Capacity When It’s Only Treating 150 Ml/D?,
M.Thomas, Unitywater. This paper highlighted that the capacity at the Noosa STP is primarily related to the
influent Biological Oxygen Demand (BOD) and COD (Chemical Oxygen Demand). COD and BOD represent
the relative strength of the influent sewage with levels of governing downstream treatment processes. This
could include the capacity of the bioreactors and clarifiers as well as the sludge processing stream. Table 6-7
below from the AWA conference paper compares the design capacity of the Noosa STP to the actual current
plant loadings.
Table 6-7 Noosa STP Design Capacity and Current Plant Loadings
Current Loading (EP)
Design
Capacity Total
(EP) 2009/10 Total
COD BOD Suspended Total Phosphorous
Hydraulic Nitrogen
Solids
48,000 40,000 61,538 69,231 62,500 42,000 44,444
The table highlights that while the plant appears to be capable of treating the current hydraulic, Nitrogen and
Phosphorus loads, the current design capacity is not suitable to treat the BOD/COD and Suspended Solids
loads.
Advice was sought from Unitywater regarding capacities and the potential for augmentation at the Noosa
STP. Unitywater, via Ashley Lorenz, provided the following advice:
Noosa Sewage Treatment Plant has capacity to serve existing sewer connections and new
development designated in the current Noosa planning Scheme until late 2015. This assessment is
based upon Unitywater’s assessment of the performance of the plant and certain assumptions
about; rate of growth, influent characteristics and approval of new development not extending
beyond the urban area detailed in the Noosa Planning Scheme as at June 2012.
The Noosa Sewage Treatment Plant is operating beyond certain aspects of its design capacity but is
producing effluent which complies with that prescribed in the environmental licence.
Unitywater is satisfied that the Noosa Sewage Treatment Plant is being operated very efficiently.
Unitywater and the treatment plant operator, Degrémont, have commenced preparation of a
business case for augmentation of the Noosa Sewage Treatment Plant. Based upon the outcomes
of an options analysis Unitywater’s Board has approved, in September 2012, a revised strategy for
augmentation of the Noosa Sewage Treatment Plant which includes a delay in the preparation of the
business case until such time as Unitywater obtains a new environmental licence. Unitywater will
lodge a development application for augmentation of the treatment plant in January 2013 and is
targeting a decision notice being issued in June 2013. It is expected that the augmentation will be
commissioned in December 2015.
The full letter from Unitywater is detailed in Appendix D. In addition, confirmation has been sought from
Unitywater in regard to the upgrade of the Noosa STP. Unitywater have acknowledged and are considering
the treatment solutions to support the proposed development. Moreover, they have invited submission and
dialogue for the proposed development to be supported by future STP augmentation. All correspondence
with Unitywater has been provided in Appendix G
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 14
Page 19
Noosa on Weyba
Water Supply and Sewerage Analysis
7 Conclusions
Based on the work undertaken for servicing the Noosa on Weyba development, a number of conclusions
have been made:
> The proposed development is approximately 2,730 EP and will comprise a mix of residential and non-
residential land uses on the site.
> The development is outside the current water supply and sewerage planning headworks region and is
proposed to connect to the existing water supply and sewerage networks currently servicing Noosa.
> To provide water supply to the development it is proposed to connect to the Noosa Industrial DMA
(NIDMA) and serviced via the Tewantin Reservoirs.
> Analysis undertaken by MWH on behalf of Unitywater indicated that the current NIDMA water supply
network has sufficient capacity to accommodate the development.
> To service the site, a connection to the existing 600mm diameter trunk main along Eenie Creek Road via
a 250 mm diameter main along Walter Hay Drive is proposed.
> Consideration should be given to a connection to the existing 150 mm reticulation main in Lake Entrance
Boulevard to avoid dead end mains in the proposed network.
> An internal network of 200 mm and 150 mm diameter water mains will be required to service each site to
maintain Unitywater’s DSS.
> The conveyance of sewage from the site is proposed via the internal use of pump stations and local
reticulation mains. For the purposes of this study a conventional system has been identified, as per
Unitywater’s DSS.
> A Low pressure sewerage system may be considered to be more suitable due to the topography
constraints within the site.
> This main pump station will convey flow to the existing Noosa sewerage network and discharge to
existing pump station NVL011. The inclusion of the Noosa on Weyba development would trigger an
upgrade of this existing pump station
> The conveyance route from NVL011 follows the existing rising main and gravity network to the Noosa
STP. No further augmentation of the existing sewerage network was identified, subject to pump station
NVL011.
> Unitywater has advised that the augmentation of the Noosa STP is proposed, with a completion date
scheduled for December 2015. Unitywater have confirmed that all flows from the proposed development
will be treated at the Noosa STP (refer Appendix F 2).
> It is expected that Unitywater will be the owners of the infrastructure proposed for this development.
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 15
Page 20
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX A FIGURES [OCR of page images] Noosa on Weyba Water Supply and Sewerage Analysis Ved a= D1 FIGURES CJD Cardna Shaping the Future
Page 21
Figure 1 Noosa on Weyba External Water Supply ie 2 Ta Tes t cS te LEGEND i] : 5 a 7 Node |Maximum Hour] Fire Fighting 614\SeiNBI\ojUdeeghaM - 6 L-LOLS\:W ‘Wied OI!4 Existing Water a = Zi Pressure (m) | Pressure (m) i JOM’ JA Sein Proposed Water Supply Mains (Diam) 150 mm 200 mm 250 mm Model Node 14 'e : 71 Precinct 2 ‘oo Heh 49 < "33 & <—* noosa on weyba Cc) ) Cardno 35 he : Shaping the Future on, e —T Cardno (QLD) Pty Ltd | ABN 57 051 074 992 Level 11, North Tower, 515 St Pauls Terrace Locked Bag 4006, Fortitude Valley QLD 4006 se Tel: 07 33699822 Fax: 07 3369 9722 "©2012 Carcino (ld) Pty Ltd All Rights Reserved. Copyright in the whole and every part ofthis ocument belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or ) reproduced in whale orn part in any manner or form arin or on any metia to any person without on e39 the prior writen consent of Cardino (la) Pty te.” 29 41 ‘This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client 10@, in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall net assume 56 any responsibilty orliablty whatsoever to any third party arising out of any use or reliance by any Precinct 1 -- —_* third party on the content of this document. ‘e 62 O F: (0) BREA aa an , 42 Sle ie i © ANNO Dighk=lelshs © AMO Eackys.© AMS Marco Copparetion 65: '@
Page 22
Figure 2 Noosa on Weyba Proposed Sewerage Infrastructure LEGEND BIA\seunBi jojuidepnegqhenA - 6 L- LOLS “Uled Oll4 Existing Network A Pump Station Gravity Mains JOM’ JA Sein —— Rising Mains sgl Noosa STP Proposed Network Gravity Mains =—=—=——= Rising Mains u rain ee Rising Main Alternate Aligment A Pump Stations (YY Converyance Alternative Rising Main) Alingment Precinct 2 7 b . ee SPSNWC. aac cee... noosa i on weyba cy Cardno Shaping the Future Cardno (QLD) Pty Ltd | ABN 57 051 074 992 Level 11, North Tower, 515 St Pauls Terrace Locked Bag 4006, Fortitude Valley QLD 4006 Tel: 07 3369 9822 Fax: 07 3369 9722 "©2012 Carcino (ld) Pty Ltd All Rights Reserved. Copyright in the whole and every part ofthis ocument belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or Precinct 1 reproduced in whole or in part in any manner or form or in or on any media to any person without : Ae j DING” OAM Dishes © Am Caza © ams Sosa Conetatare aay ce it it ‘This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client Miterosotte Carrere Imaccordanee withthe terns oe retainer. Cardno (a) Fly Ltd dees notand shall not aceume any reeponsibity or abit whatsoeverfo any third part arising out of anj use orelance by any thr pary on thecontent ofthis document Lo Taice i © Amo CiefElelena @ Ai Escla5 © Ais} Mirerosont Caynoretion Note: Final network;configuration of Precicnt 1) to be confirmed |on finalistion oflot configuration
Page 23
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX B NOOSA ON WEYBA STRUCTURE PLAN [OCR of page images] Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX B NOOSA ON WEYBA STRUCTURE PLAN CJD Cardna Shaping the Future
Page 24
NOOSA ON WEYBA| STRUCTURE PLAN NORTHBROOK CORP PTY LTD © M L Design Pty Ltd Drawn by: AR ACN 100 492 304 File Path: P:\NORT0001_Lake Weyba\B_Documentation\B1_Production\B1_Drawings\InDesign\130208 Alternate Design Considerations ABN 89 159 048 228 SCALE - 1:10,000 @ A3 APPROVED FOR ISSUE ____ 25/09/2013 JOB NO: NORT0001 MP-005-[I]
Page 25
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX C UNITYWATER HYDRAULIC NETWORK ANALYSIS
Page 26
REPORT Noosa on Weyba Water Network Performance Assessment Prepared for Unitywater 29/06/2012
Page 27
Page 28
Noosa on Weyba Water Network Performance Assessment
This document has been prepared for the benefit of Unitywater. No liability is accepted by this company
or any employee or sub-consultant of this company with respect to its use by any other person.
This disclaimer shall apply notwithstanding that the report may be made available to other persons for
an application for permission or approval to fulfil a legal requirement.
QUALITY STATEMENT
PROJECT MANAGER PROJECT TECHNICAL LEAD
Mark Bruno Tony Bamford
PREPARED BY
Patrick Tunnah ………………………………............... ……/……/……
CHECKED BY
Tony Bamford ………………………………............... ……/……/……
REVIEWED BY
Phil Hall ………………………………............... ……/……/……
APPROVED FOR ISSUE BY
Mark Bruno ………………………………............... ……/……/……
BRISBANE
Level 3 35 Boundary Street, PO Box 3602, South Brisbane, QLD 4101
TEL +61 7 3029 5000, FAX +61 7 3029 5050
REVISION SCHEDULE
Signature or Typed Name (documentation on file).
Rev
Date Description
No
Prepared by Checked by Reviewed by Approved by
Status: Draft 22/06/2012
Project number: Our ref: Noosa on Weyba WS Assessment.docx
Page 29
Noosa on Weyba Water Network Performance Assessment Unitywater Noosa on Weyba Water Network Performance Assessment CONTENTS 1 Introduction .............................................................................................................................. 1 1.1 Methodology........................................................................................................................ 1 1.2 Assumptions........................................................................................................................ 1 2 Hydraulic Model ....................................................................................................................... 2 2.1 Model Update ...................................................................................................................... 2 2.2 Model Demand .................................................................................................................... 2 3 Standards of Service ................................................................................................................ 3 4 Network Performance ............................................................................................................... 4 4.1 Maximum Hour Pressure Performance .................................................................................. 4 4.2 Fire Flow Pressure Performance ........................................................................................... 6 4.3 Storage Assesment .............................................................................................................. 6 5 Conclusions ............................................................................................................................. 9 LIST OF TABLES Table 2-1: EP Summary for Proposed Noosa on Weyba Development ................................................ 3 Table 2-2: Model Demand for Proposed Noosa on Weyba Development ............................................. 3 Table 4-1: 2038 Maximum Hour Pressure Performance ..................................................................... 5 Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour .............................................. 6 Table 4-3: Tewantn Reservoir Storage Assesment without Noosa on Weyba ....................................... 8 Table 4-4: Tewantin Reservoir Storage Assessment including Noosa on Weyba .................................. 8 LIST OF FIGURES Figure 2-1: Updated Model Pipes ..................................................................................................... 2 Figure 4-1: Network Performance Critical Pressure Locations............................................................. 4 Figure 4-2 : Tewantin Reservoir Zone ............................................................................................... 7 APPENDICES Appendix A Cardno Assessment Brief Status: Draft 22/06/2012 Project number: Our ref: Noosa on Weyba WS Assessment.docx
Page 30
Noosa on Weyba Water Network Performance Assessment
1 Introduction
MWH have been engaged by Unitywater to undertake a water network performance assessment of the
proposed Noosa on Weyba development. Three initial supply options have been developed and are
included within the assessment brief prepared by Cardno (refer to Appendix A).
The proposed development is located off Old Hollett Road near Walter Hay Drive. It will be serviced
from within the existing Noosa Industrial DMA (NIDMA) with storage provided at the Tewantin
Reservoirs. Option 1 is to connect a 300 mm diameter main into the existing 375 mm diameter trunk
main along Eenie Creek Road and serve as the primary connection to the development site. Options two
and three assessed the potential for a secondary 200 mm diameter connection from the existing
150 mm diameter main in Lake Entrance Boulevard. Details of the network layout for the three supply
options assessed can be found in the Cardno Report (Appendix A).
1.1 Methodology
The assessment has applied the following methodology:
• The assessment has been carried out using H2OMAP Water.
• The demands (EPs) for the Noosa on Weyba development site were developed by Cardno and
adopted for use in the ‘Unitywater Planning Model – Water’. Demand was distributed to
junction/s at the boundary of the development.
• The water network within the NIDMA was reviewed against the latest pipe GIS layer and the
model was updated to reflect the existing water network.
• Fire flow demands were added to junctions within NIDMA and a fire flow assessment was run to
determine the critical fire flow junction.
The model was used to assess the water supply network performance for the three supply
options. The network was assessed with and without the proposed development under
maximum hour and fire flow demand conditions during the Ultimate planning horizon.
1.2 Assumptions
The performance assessment of the water supply network has been undertaken assuming the following:
• The development demands for assessment were provided by Cardno along with calculations,
and assumptions. MWH have confirmed that demand conversion factors used are inline with the
Noosa Planning Scheme Policy and no revision is necessary.
• Along with the “no-development” scenario, the three options proposed within the assessment
brief were the only options assessed.
• Only the full development solution was assessed. No interim development stages were
investigated.
• The assessment has provided results to the boundary of the development only. No internal
water supply network was investigated and internal water supply network head losses were not
assessed.
Status: Draft 22/06/2012
Project number: Page 1 Our ref: Noosa on Weyba WS Assessment.docx
Page 31
Noosa on Weyba Water Network Performance Assessment
2 Hydraulic Model
2.1 Model Update
A review of the ‘Unitywater Planning Model – Water’ H2OMAP Water model was undertaken for the
Noosa Industrial DMA and the following pipes were updated into the model:
• NEW-P001, 150 mm diameter main, 330 m in length, located at Noosa Civic.
• NEW-P002, 150 mm diameter main, 100 m in length, located at Noosa Civic near Rene
Street.
• NEW-P003, 150 mm diameter main, 420 m in length, located along Rene Street.
The updated pipes are shown below in Figure 2-1.
Figure 2-1: Updated Model Pipes
2.2 Model Demand
A total water demand for the site of 2,416 EP has been estimated by Cardno based on current SCRC
planning information. MWH have confirmed that demand conversion factors used are inline with the
Noosa Planning Scheme Policy and no revision is necessary. The EPs considered for the site are
summarised in Table 2-1.
Status: Draft 22/06/2012
Project number: Page 2 Our ref: Noosa on Weyba WS Assessment.docx
Page 32
Noosa on Weyba Water Network Performance Assessment
Table 2-1: EP Summary for Proposed Noosa on Weyba Development
Quantity EP Density Adopted EP
Residential Lots 494 lots 3.3 EP x lot 1,630.2
Mixed Use Residential 339 lots 2.3 EP x lot 779.7
(Townhouses/Units/Retirement (assumed 2 bedroom
Village) unit)
Retail Space 600 m2 100 EP per ha 6
Total 2,415.9
The water supply demands as flows for the proposed development were supplied by Cardno and
confirmed by MWH. A Peak Hour demand of 31 L/s and a fire flow demand of 51 L/s (30 L/s + 2/3
maximum hour) at the development site were confirmed. Table 2-2 details the demand distribution into
the H2OMAP Water model. The location of proposed development connections are shown in Figure 2-1.
Table 2-2: Model Demand for Proposed Noosa on Weyba Development
Option 1 Option 2 Option 3
Model Junction ID /
Description Peak Fire Peak Fire Peak Fire
Hour Flow Hour Flow Hour Flow
(L/s) (L/s) (L/s) (L/s)^ (L/s) (L/s)
NOOSA_ON_WEYBA_CONN1, 31.32 50.88 31.32 50.88 31.32 50.88
proposed development
connection #1
NOOSA_ON_WEYBA_CONN2, - - 3 32 - -
proposed development
connection #2
^ Both fire flow demands do not occur simultaneously
3 Standards of Service
The standards of service for water supply applicable to this investigation are as follows:
• Minimum residual pressure >= 22 m
• Fire flow demand assessed at 2/3 PH demand
• Minimum pressure under fire flow demand at hydrant = 12 m
• Maximum velocity = 2.5 L/s
The above standards have been been adopted from the Unitywater Desired Standards of Service.
Status: Draft 22/06/2012
Project number: Page 3 Our ref: Noosa on Weyba WS Assessment.docx
Page 33
Noosa on Weyba Water Network Performance Assessment 4 Network Performance 4.1 Maximum Hour Pressure Performance Pressures for all options within the NIDMA water supply network remained above the required pressure of 22 m with the inclusion of the proposed Noosa on Weyba development when assessed under Ultimate maximum hour demands. The maximum hour critical junction within the DMA was identified as NOON246 and is located immediately upstream of the Noosaville West DMA inlet (Figure 4-1). Pressure at this location was identified to reduce by 8 m with the inclusion of the proposed development during the Ultimate maximum day planning horizon (Table 4-1). Figure 4-1: Network Performance Critical Pressure Locations Status: Draft 22/06/2012 Project number: Page 4 Our ref: Noosa on Weyba WS Assessment.docx
Page 34
Noosa on Weyba Water Network Performance Assessment
Minimum pressure results identified during the maximum hour performance assessment are provided
below in Table 4-1.
Table 4-1: 2038 Maximum Hour Pressure Performance
Model NOOSA_ON_
NOOSA_ON_W
Junction ID NOON246 NTHWJ002615 NOON111 WEYBA_CON
EYBA_CONN1
N2
Connection #1 at Connection #2 at
Critical Connection #2
Location / the intersection Connection #1 the intersection
junction at
Description of Eenie Creek at development of Lake Entrance
within development
Road and Walter boundary Boulevard and
NIDMA boundary
Hay Drive Attenuatta Place
Pressure
Units metres
Without
Proposed 47.09 64.78 - 64.6 -
Development
Option 1 39.83 57.28 54.81 - -
Option 2 39.19 56.62 54.16 57.12 57.12
Option 3 40.15 57.68 55.92 - -
PASS / FAIL PASS PASS PASS PASS PASS
Status: Draft 22/06/2012
Project number: Page 5 Our ref: Noosa on Weyba WS Assessment.docx
Page 35
Noosa on Weyba Water Network Performance Assessment
4.2 Fire Flow Pressure Performance
The fire flow assessment for all options identified pressures at the development site and within NIDMA
are predicted to remain above the required pressure of 12 m during 2/3 maximum hour in the Ultimate
planning horizon. 2/3 maximum hour was determined to be at 7pm and is calculated from the maximum
flow into NIDMA.
Fire flow demands were assigned to all junctions within NIDMA to determine the critical fire flow
junction. Fire Flow demand was assigned to junctions as follows:
• Junctions with commercial demand 30 L/s.
• Junctions with residential demand 15 L/s.
The critical fire flow junction was found to be near the end of Traders Lane behind 118 Noosa-Eumundi
Road (refer to Figure 4-1). Residual pressure at this location without the inclusion of the proposed
development is predicted at fire flow demand at the hydrant to be 21.12 m. The addition of the
development site is predicted to reduce pressures at the critical point to a minimum of 13.38 m at
Ultimate. The model predicts that with the development the catchment will still meet the standards of
service.
Pressure results identified at 7pm during the fire flow performance assessment are provided below in
Table 4-2.
Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour
Model NOOSA_ON_WEYBA_ NOOSA_ON_WEYBA_C
Junction ID NTHWJ002350
CONN1 ONN2
Location / Critical fire flow Connection #1 at Connection #2 at
Description junction within NIDMA development boundary development boundary
Pressure
Units metres head
Without
Proposed 21.12 - -
Development
Option 1 13.99 57.35 -
Option 2 13.38 60.75 55.42
Option 3 14.41 59.52 -
PASS / FAIL PASS PASS PASS
4.3 Storage Assesment
The Noosa on Weyba development will be supplied from the Noosaville Industrial DMA. This DMA is
one of a number of DMAs dependent on the Tewantin Reservoirs for storage as shown in Figure 4-2
(Tewantin.
Status: Draft 22/06/2012
Project number: Page 6 Our ref: Noosa on Weyba WS Assessment.docx
Page 36
Noosa on Weyba Water Network Performance Assessment Figure 4-2 : Tewantin Reservoir Zone As the Noosa on Weyba development is located outside of existing PIP boundaries it has not been considerd in any previous water supply planning including allowance in reservoir sizing. Storage assessment was undertake through application of the following DSS taken from the SEQ Water and Sewerage Planning Guidelines. Average Day Demand: • Detached Residential – 280 L/p/day • Attached Residential – 260 L/p/day • Non Residential – 280 L/EP/day Mean Day Maximum Month Demand: • Detached Residential – 1.5 x AD demand • Attached Residential – 1.5 x AD demand • Non Residential – 1.5 x AD demand Maximum Day Demand: • Detached Residential – 2 x AD demand • Attached Residential – 2 x AD demand • Non Residential – 2 x AD demand Ground Level Storage Requirement: • Maximum Day (ML) + the higher of 4 hrs of MDMM or 0.5 ML The 2012 Unitywater Demand Model was used in the storage assessment. Assessment prior to inclusion of the Noosa on Weyba development identified a minor deficiency at the 2031 plannig horizon as shown in Table 4-3. Table 4-4 shows that with inclusion of the development storage deficiency is bought forward to the 2016 plannig horizon. Addtional storage within the Tewantin Suppied reservoir zone is required prior to 2016 for standards of service to be met with inclusion of the Noosa on Weyba development. A total storage deficit of 1.64 ML is estimated at 2031. Status: Draft 22/06/2012 Project number: Page 7 Our ref: Noosa on Weyba WS Assessment.docx
Page 37
Noosa on Weyba Water Network Performance Assessment
Table 4-3: Tewantn Reservoir Storage Assesment without Noosa on Weyba
Additional Storage
Population / EP Current Capacity Required Capacity Excess / Deficiency Requirement
Year Detached Res Attached Res Total Res Non-Res Total ML ML ML ML
2006 15803.6 8675.8 24479.5 4244.0 28723.5 24.5 17.71 6.79 0
2011 18561.9 9396.2 27958.1 6027.2 33985.3 24.5 20.99 3.51 0
2016 21654.4 10236.4 31890.8 7589.3 39480.2 24.5 24.41 0.09 0
2021 21717.1 10241.6 31958.7 7589.3 39548.0 24.5 24.45 0.05 0
2026 21719.7 10241.6 31961.3 7589.3 39550.6 24.5 24.46 0.04 0
2031 21730.1 10241.6 31971.7 7885.0 39856.8 24.5 24.65 -0.15 0.15
Table 4-4: Tewantin Reservoir Storage Assessment including Noosa on Weyba
Additional Storage
Population / EP Current Capacity Required Capacity Excess / Deficiency Requirement
Year Detached Res Attached Res Total Res Non-Res Total ML ML ML ML
2006 17433.8 9455.5 26889.4 4250.0 31139.4 24.5 19.19 5.31 0
2011 20192.1 10176.0 30368.0 6033.2 36401.2 24.5 22.47 2.03 0
2016 23284.6 11016.1 34300.7 7595.3 41896.1 24.5 25.90 -1.40 1.4
2021 23347.3 11021.3 34368.6 7595.3 41963.9 24.5 25.94 -1.44 1.45
2026 23349.9 11021.3 34371.2 7595.3 41966.5 24.5 25.94 -1.44 1.45
2031 23360.3 11021.3 34381.6 7891.0 42272.7 24.5 26.14 -1.64 1.64
Status: Draft 22/06/2012
Project number: Page 8 Our ref: Noosa on Weyba WS Assessment.docx
Page 38
Noosa on Weyba Water Network Performance Assessment
5 Conclusions
The ‘Unitywater Planning Model – Water’ water network model has been used to assess the potential
impact of the Noosa on Weyba development in the existing DMA in regard to pressure standards at
maximum hour and under fire flwo conditons. The demand from Noosa on Weyba has been applied
based on the following criteria:
• Base model set to the Ultimate planning horizon
• 494 Residential Lots
• 339 Mixed Use Residential Lots
• 600 m2 of Retail Space
• Total EP = 2416
• Maximum Hour demand = 31 L/s
• Fire Flow demand = 51 L/s
The assessment of the water supply network under fire flow and maximum hour demands identified the
following:
• Under maximum hour demand conditions Unitywater standards of service were met at the
proposed development site and within Noosa Industrial DMA for the three supply options during
the 2038 planning horizon. No augmentation of the existing network is required.
• Under fire flow demand conditions Unitywater standards of service were met at the proposed
development site and within Noosa Industrial DMA for the three supply options during the 2038
planning horizon. No augmentation of the existing network is required.
Storage assessment of the Tewantin Reservoir with inclusion of the Noosa on Weyba development was
undertaken. The storage assessment identified the inclusion of the Noosa on Weyba development
brings forward storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS
contained in this report. A total storage deficiency of the Tewantin Reservoir of 1.64 ML was identified at
the 2031 plannnig horizon.
Status: Draft 22/06/2012
Project number: Page 9 Our ref: Noosa on Weyba WS Assessment.docx
Page 39
Noosa on Weyba Water Network Performance Assessment Appendix A Cardno Assessment Brief [OCR of page images] @® MWH Noosa on Weyba Water Network Performance Assessment Appendix A Cardno Assessment Brief
Page 40
Our Ref : 5101-19
Contact: Joshua Lake Cardno (Qld) Pty Ltd
ABN 57 051 074 992
Level 11
30 May 2012
515 St Paul’s Terrace
Fortitude Valley QLD 4006
Australia
Unitywater
Ground Floor, 8-10 Maud Street Locked Bag 4006
Maroochydore, Qld 4405 Fortitude Valley QLD 4006
Australia
Attention: Michael Lukin Phone: 61 7 3369 9822
Fax: 61 7 3369 9722
Dear Sir www.cardno.com.au
Hydraulic Modelling Fee Request
Please find attached a request for a fee to undertake a water supply hydraulic model
investigation for a proposed development in Noosa.
Estimation of Population Density
Based on Sunshine Coast Regional Councils (SCRC) planning information,
an Equivalent Person (EP) population was estimated for the site. The EPs considered
for the site are detailed in Table 1.
Table 1 Population Projections
Quantity EP Density Adopted EP
Residential Lots 494 lots 3.3 EP x lot 1,630.2
Mixed Use Residential 2.5 EP x lot
(Townhouses/Units/Retirement 339 lots (assumed 2 779.7
Village) bedroom unit)
2
Retail space 600m 100 EP per ha 6
TOTAL 2415.9
Australia ● Belgium ● Indonesia ● Kenya ● New Zealand ● Papua New Guinea
United Kingdom ● United Arab Emirates ● United States ● Operations in 60 countries
Page 41
Hydraulic Modelling Fee Request 2
UnityWater
Water Supply Demand and Sewage Flow Projections
An adopted design criteria based on the 2012 South East Queensland (SEQ) Planning Guidelines was
adopted for this development. Utilising the adopted peaking factors, detailed in Table 2, the water supply
demands were calculated for the proposed development. Table 3 details the projected water supply
demands.
Table 2 SEQ Planning Guidelines Design Criteria
Additional Flow
Base Flow Unit Peaking Factors
requirements
30 L/s fire fighting at 2/3
Water Supply AD = 280L/EP/d 4 x PH:AD
peak hour
Note:
AD – Average Day
PH – Peak Hour
Table 3 Water Supply Demands for the Proposed Development
Adopted EP PH (L/s) Fire Fighting Flow (L/s)
2415.9 31 51
Options
The service development, the three options have been developed.
> Option 1: This option involves the delivery of the full supply to the development from a connection to
the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed 300mm
trunk main.
> Option 2: This option involves splitting the site and utilising two connection locations. One
connection delivering supply to the development would be via a connection to the existing trunk
mains along Eenie Creek Road to the boundary of the site via a proposed 300mm trunk main. A
second connection (200mm) to the existing mains along Lake Entrance Boulevard is also proposed
to service the western lots. The supply sources would not be linked internally.
> Option 2: This option utilising two connection locations. One connection would be via a connection
to the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed
300mm trunk main with a 200mm connection to the existing mains along Lake Entrance Boulevard.
The supply sources would be linked internally.
Scope Of Work
Cardno require the analysis of the Noosa water supply network to confirm the capacity of the network. As a
minimum Cardno would require the available pressures at the proposed connection locations for both a
maximum day and fire fighting scenarios for each option.
7501-19 www.cardno.com
Page 42
Hydraulic Modelling Fee Request 3 UnityWater Fee Request It is requested that a fee estimation and scope of works to undertake the hydraulic model analysis of the Noosa water supply network be supplied to Cardno. A prompt response to this fee request would be appreciated. To assist in this matter, please find attached plans for each service option for the development. Yours faithfully Joshua Lake Planning Engineer, Water Supply and Sewerage For Cardno Direct Line +61 7 3100 2267 Enc: Option Plans 7501-19 www.cardno.com
Page 43
File Path: M:\5101-19 - Weyba\Mapinfo\Figures\Figures_WS_Options.wor
AAADDD
OAA
RRRO
O
O
O
O
KRRR
KKK
K
CC
EC
EEE
IIE
CR
CCRR
RR
EEE
REE
E
EE
Option 1
E
E
E
E
E
N
NNNIII
NN
EEE
E E
Lake Weyba
Water Supply Infrastructure
#
#
Connection to Noosa system Option 1 - Single Feed
LEGEND
Development Site Boundary
Trunk Feed
Existing Mains
mm
m
00m
3300
ØØ
Peak Hour = 31 L/s
Fire Fighting = 51 L/s
(
(
DEVELOPMENT SITE NOT
NOT TO
TO SCALE
SCALE
Cardno (QLD) Pty Ltd | ABN 57 051 074 992
Level 11, North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 07 3369 9822 Fax: 07 3369 9722
"© 2012 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without
the prior written consent of Cardno (Qld) Pty Ltd."
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client
in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall not assume
any responsibility or liability whatsoever to any third party arising out of any use or reliance by any
EEE third party on the content of this document.
IIIVVIIVVVEE
RRR
R R
DDD
YY
AAAYYY
D D SHEET A3
HAAA
HHH
H
TTT
RRR
EEEEER R Project No: 5101-19
LLLLLTTT
AAA
A A
W
W
W
W
W Date: 29/05/2012
Revision Number: For
For Advice
Advice
Designed by: JL
JL
Client Name: SMDS
Page 44
File Path: M:\5101-19 - Weyba\Mapinfo\Figures\Figures_WS_Options.wor
Option 2
Lake Weyba
Water Supply Infrastructure
#
#
Connection #1 to Noosa system Option 2 - Split Feeds
LEGEND
Development Site Boundary
Trunk Feed
Existing Mains
Peak Hour = 3 L/s
m
m
m
00m
Fire Fighting = 32 L/s
3300
ØØ
Peak Hour = 31 L/s
Fire Fighting = 49 L/s
(
(
(
(
Connection #2 to Noosa system
DEVELOPMENT SITE NOT
NOT TO
TO SCALE
SCALE
Cardno (QLD) Pty Ltd | ABN 57 051 074 992
Level 11, North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 07 3369 9822 Fax: 07 3369 9722
"© 2012 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without
the prior written consent of Cardno (Qld) Pty Ltd."
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client
in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall not assume
any responsibility or liability whatsoever to any third party arising out of any use or reliance by any
EEE
IVIVVEE
third party on the content of this document.
RRRIIVIVV
DDDRRR
YYYYYDD SHEET A3
AAA
HAA
HHH
H
RRR
EEEEER R
5101-19
T
T
LLLLLTT
T Project No:
AAA
A A
W
W
W
W
W
Date: 29/05/2012
Revision Number: For
For Advice
Advice
Designed by: JL
JL
Client Name: SMDS
Page 45
File Path: M:\5101-19 - Weyba\Mapinfo\Figures\Figures_WS_Options.wor
Option 3
Lake Weyba
Water Supply Infrastructure
#
#
Connection #1 to Noosa system Option 3 - Combined Feeds
LEGEND
Development Site Boundary
Trunk Feed
Existing Mains
mm
m
00m
3300
ØØ
Peak Hour = 31 L/s
Fire Fighting = 51 L/s
Ø220000m
Ø mm (
(
m
Connection #2 to Noosa system
DEVELOPMENT SITE NOT
NOT TO
TO SCALE
SCALE
Cardno (QLD) Pty Ltd | ABN 57 051 074 992
Level 11, North Tower, 515 St Pauls Terrace
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 07 3369 9822 Fax: 07 3369 9722
"© 2012 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without
the prior written consent of Cardno (Qld) Pty Ltd."
This document is produced by Cardno (Qld) Pty Ltd solely for the benefit of and use by the client
in accordance with the terms of the retainer. Cardno (Qld) Pty Ltd does not and shall not assume
any responsibility or liability whatsoever to any third party arising out of any use or reliance by any
EEE
IVIVVEE
third party on the content of this document.
RRRIIVIVV
DDDRRR
YYYYYDD SHEET A3
AAA
HAA
HHH
H
RRR
EEEEER R
5101-19
T
T
LLLLLTT
T Project No:
AAA
A A
W
W
W
W
W
Date: 29/05/2012
Revision Number: For
For Advice
Advice
Designed by: JL
JL
Client Name: SMDS
Page 46
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX D UNITYWATER RESPONSE [OCR of page images] Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX D UNITYWATER RESPONSE CJD Cardna Shaping the Future
Page 47
Head Office:
Ground Floor, 33 King Street
Caboolture QLD 4510
Mailing Address:
PO Box 953, Caboolture QLD 4510
1300 0 UNITY (1300 086 489)
www.unitywater.com
Our ref: A1130744
Your ref: 5101-19
The Manager
Cardno
Locked Bag 4006
Fortitude Valley QLD 4006
3 October 2012
Attention: Mr Joshua Lake
Capacity of Noosa Sewage Treatment Plant.
I refer to your correspondence dated 06 August 2012 in which you make enquiries about the
capacity of the Noosa Sewage Treatment Plant to serve development in the Noosa region.
Specifically you requested confirmation of the following:
1. Noosa Sewage Treatment Plant has capacity to serve existing sewer connections and new
development designated in the current Noosa planning Scheme until late 2015. This
assessment is based upon Unitywater’s assessment of the performance of the plant and
certain assumptions about; rate of growth, influent characteristics and approval of new
development not extending beyond the urban area detailed in the Noosa Planning Scheme
as at June 2012.
2. The Noosa Sewage Treatment Plant is operating beyond certain aspects of its design
capacity but is producing effluent which complies with that prescribed in the environmental
licence.
3. Unitywater is satisfied that the Noosa Sewage Treatment Plant is being operated very
efficiently.
4. Unitywater and the treatment plant operator, Degrémont, have commenced preparation of
a business case for augmentation of the Noosa Sewage Treatment Plant. Based upon the
outcomes of an options analysis Unitywater’s Board has approved, in September 2012, a
revised strategy for augmentation of the Noosa Sewage Treatment Plant which includes a
delay in the preparation of the business case until such time as Unitywater obtains a new
environmental licence. Unitywater will lodge a development application for augmentation of
the treatment plant in January 2013 and is targeting a decision notice being issued in June
2013. It is expected that the augmentation will be commissioned in December 2015.
I acknowledge that my earlier advice about timing of the augmentation was December 2014.
My advice was based upon the best available information at that time.
It is my understanding that your client is contemplating a development that is outside of the
urban area identified in the current Noosa Planning Scheme. If this is the case it would be
Page 1 of 2
Page 48
prudent for you to submit the proposal to Unitywater so that it might be considered in the
context of the planned augmentation of the Noosa Sewage Treatment Plant on the grounds
that the capacity of the planned upgrade is based upon the land uses designated in the present
Noosa Planning Scheme.
I suggest that you arrange a meeting with Unitywater’s Partha Susarla (Strategic Planning
Manager) and Gary Bowtell (Development Services Manager) should your client’s proposal
involve an extensionn of the present catchment of the Noosa Sewage Treatment Plant beyond
that permitted/envisaged by the current Noosa Planning Scheme. The purpose of this meeting
would be to assess your client’s proposal and its potential impacts on the sewer network and
sewage
ewage treatment plant. It could be that we will need to have joint discussions with Sunshine
Coast Council to determine the likelihood of the proposal proceeding and if the proposed
staging of this augmentation is appropriate.
Contact details:
Partha Susarla – Strategic Planning Manager
T: (07) 3385 2256
E: [email protected]
Gary Bowtell – Development Services Manager
T: (07) 07 5431 8785
E: [email protected]
Should you require clarification of the above please contact me on (07) 5431 8270 during
business hours or at [email protected]
Yours faithfully
Ashley Lorenz
Manager Strategic Planning and Asset Management
For Chief Executive Officer
CC: Partha Susarla – Strategic Planning Manager
Gary Bowtell – Development Services Manager
Page 2 of 2
Page 49
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX E SUNSHINE COAST REGIONAL COUNCIL AND UNITYWATER REQUEST FOR FURTHER INFORMATION
Page 50
Part A: Sunshine Coast Regional Council (SCRC) and Unitywater RFI Issue The development requires the upgrade of the Noosa Heads Sewage Treatment Plan. Information Required 61 Provide details of the nature and extent of upgrade works required to the Noosa Heads Sewage Treatment Plant to cater for the development. Issue The alignment of proposed water mains and sewer rising mains are located within private property, Parks and proposed open space areas. Information Required 62 Provide additional detail on the alignment of the proposed water mains and sewer rising mains. The detail must demonstrate that the works are achievable and include: (a) The consent of land owners that are affected by the works. (b) The delineation between private and public infrastructure. Issue The alignment of proposed water mains and sewer rising mains are located within private property, Parks and proposed open space areas. Information Required 63 Provided confirmation from Unitywater regarding the agreed design of the proposed works – in particular their acceptance or otherwise of the proposed ―Alternative Treatment Options‖ which may have an environmental impact. UNITYWATER Issue The development located outside of the urban footprint for the South East Queensland Regional Plan (SEQRP) and are consequently outside of Unitywater‘s headworks area. Information Required 94 Prior to the issue of a Development Permit, the applicant is required to enter into an infrastructure agreement with Unitywater which provides for all the necessary work and monetary contributions. Accordingly, a draft infrastructure agreement can be issued for consideration should a request to Unitywater be made.
Page 51
Part B: Unitywater Additional RFI [OCR of page images] Part B: Unitywater Additional RFI
Page 52
Unitywater Caboolture \BN: 89 1300 0 UNITY (1300 ¢ onira www.unitywater.com Joshua Lake Planning Engineer Cardno Locked Bag 4006 Fortitude Valley QLD 4006 23 May 2013 Dear Josh Noosa on Weyba We offer the following comments in relation to water and sewerage network details provided in the report; External Network 1. Our current Standards of Service allow 2.7 EP/detached and 1.8 EP/attached residential dwelling. The analysis needs to consider the possibility of the higher loadings (notionally 3155 EP) suggested in your email of 19 April. Can you confirm that the analysis of the trunk mains along Eenie Creek Road recognises that it is a single 600 mm main initially, and that it does not become a twin main until about CH 480. A schematic illustrating the connectivity and inflows would be helpful (Figure 2 is not clear). Further assessment of NVL011 is required to establish that no major augmentation of either the station or the pressure main is necessary. This will entail; A review of the as-constructed drawings and a possible inspection onsite of NVLO11 is required to confirm that the station has sufficient storage, adequately sized internal pipework, and space to accommodate the required pumps. Mr. lan Grieve from Unitywater will provide whatever record information we have and will arrange an inspection if required. Following on from above, some further analysis is required to confirm the existing station and pressure main can carry the relatively large additional load without any major augmentation. In particular, we would like to review the proposed pumps and duties (Normal and under PWWF) to check that the upgraded station operates efficiently over the required range of new flows. Page 1 of 3 Unitywater is a statutory authority that services the Moreton Bay and Sunshine Coast local authority areas on behalf of its citizens Unitywater is governed by an independent board. Councils do not have control or direction over day to day operations
Page 53
@ Unitywater 5. We confirm that NVLO40 and the downstream main to the STP have sufficient capacity to accommodate the proposed development. Treatment. 6. The Noosa STP is operating close to its design capacity. A new Licence for the plant is still to be finalised. Unitywater are negotiating with the contracted plant operator (Degremont) for a minimalist augmentation to cover the limited future growth anticipated for Noosa. We have included a higher load option that would accommodate this development. Note, although the expected load from this development is small in absolute terms, it is significant relative to both the remaining available capacity at the plant, and to the anticipated future growth within Noosa. It could therefore trigger some step-change in process or operational improvements. Negotiations are ongoing with Degremont and it is expected that we will have some further information on this by August 2013. 7. Inrelation to local or onsite treatment options, Unitywater are not involved in the assessment or approval of these schemes. Our only comment in relation to these schemes is that Unitywater would not be interested in taking over ownership or operation of a small treatment facility. 8. The suggestion of carting sullage waste offsite as a possible treatment option is not something we would comment on, other than in relation to the proposed destination. Note, we have recently redirected sullage waste away from Noosa (for reasons of load) to Nambour STP. Carting sullage to Coolum STP would also be problematic as this facility is also well loaded. Works Internal 9. The proposal for 5 sewage pump stations servicing 800 customers is not acceptable. The configuration as proposed would entail 1 pump station for as few as 160 customers. An alternative configuration is required. 10. Unitywater are not predisposed to permitting low pressure sewer systems except in circumstances relating to infill or backlog schemes. If they are to be used, they would need to be privately owned and operated. In addition, if these systems are to be owned by individual customers of Unitywater (as opposed to being owned by a body corporate), it would need to be demonstrated that the low pressure system proposed provides the least cost whole-of-life solution. Page 2 of 3 Unitywater is a statutory authority that services the Moreton Bay and Sunshine Coast local authority areas on behalf of its citizens Unitywater is governed by an independent board. Councils do not have control or direction over day to day operations
Page 54
@ Unitywater We are happy to discuss these issues further Yours sincerely WP FE Michael Lukin Network Planning Manager For Chief Executive Officer Page 3 of 3 Unitywater is a statutory authority that services the Moreton Bay and Sunshine Coast local authority areas on behalf of its citizens Unitywater is governed by an independent board. Councils do not have control or direction over day to day operations.
Page 55
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX F CARDNO RESPONSE TO SCRC AND UNITYWATER REQUEST FOR INFORMATION
Page 56
Table F-1 Cardno’s response to Part A of the RFI
SCRC RFI Comments Cardno Response
Issue
The development requires the upgrade of the Noosa
Heads Sewage Treatment Plan.
Information Required Detailed in Section 6.4 and Appendix C and Appendix F.
61 Provide details of the nature and extent of upgrade
works required to the Noosa Heads Sewage Treatment
Plant to cater for the development.
Issue
Final alignments of proposed water and sewer mains will be
The alignment of proposed water mains and sewer located in road easements and public land to allow access.
rising mains are located within private property, Parks
and proposed open space areas. (a) The alignment of the proposed DN150 rising main
from the site will cross Noosa Civic land.
Information Required Negotiations with Noosa Civic representatives is
62 Provide additional detail on the alignment of the ongoing in regard to a permit to construct he rising
proposed water mains and sewer rising mains. The main within their car park. An alternative alignment
detail must demonstrate that the works are achievable may be considered and is presented in Figure 2.
and include: (b) All infrastructure proposed for the development will
(a) The consent of land owners that are affected by the be transferred to Unitywater in the first instance.
works. Ongoing consultation with Unitywater in regard to
the ownership of assets will result in an
(b) The delineation between private and public Infrastructure.
infrastructure.
Issue
The alignment of proposed water mains and sewer
rising mains are located within private property, Parks
and proposed open space areas.
Information Required
Refer item 61 and item 62.
63 Provided confirmation from Unitywater regarding the
agreed design of the proposed works – in particular
their acceptance or otherwise of the proposed
―Alternative
Treatment Options‖ which may have an environmental
impact.
UNITYWATER
Issue
The development located outside of the urban footprint
for the South East Queensland Regional Plan (SEQRP) Cardno has request Unitywater provide further details in
and are consequently outside of Unitywater‘s regard to an IA. As per advice in Appendix D, Unitywater are
headworks area. awaiting the outcomes of the Noosa STP planning currently
being undertaken before an IA can be formalised. Cardno
Information Required
has indicated to Unitywater that the IA may include external
94 Prior to the issue of a Development Permit, the augmentations where relevant and also the future handover
applicant is required to enter into an infrastructure of internal trunk water and sewer infrastructure.
agreement with Unitywater which provides for all the
Unitywater are to draft an IA in the first Instance as per our
necessary work and monetary contributions.
correspondence, refer Appendix F.
Accordingly, a draft infrastructure agreement can be
issued for consideration should a request to Unitywater
be made.
Page 57
Appendix F-2: Cardno Response to Part B of the RFI [OCR of page images] Appendix F-2: Cardno Response to Part B of the RFI
Page 58
Joshua Lake (Brisbane)
From: Joshua Lake (Brisbane)
Sent: Tuesday, 11 June 2013 9:41 AM
To: [email protected]
Cc: Steve Korn (Gold Coast)
Subject: Noosa on Weyba Follow up
Michael,
Thank you for the letter (23 May 2013).
A few outstanding issues we require confirmation, as per Council’s RFI’s.
1. From the meeting we had (16 April 2013) I believe we were in agreement that the preferred strategy is
conveyance of flows from the development to the Noosa STP. We acknowledge the ongoing work between
yourself and Degremont in regard to the upgrade, and the additional assessment to confirm the upgrades
required with the range of EPs projected for the site. Moreover, Items 7 and 8 from your letter indicate that
alternative strategies would not be preferred by either Unitywater or our client (i.e. on-site treatment) and may
be subject to similar constraints (i.e. conveyance to the Coolum STP). With these factors can Unitywater
provide an in principle agreement that the conveyance of flow to the Noosa STP is preferred, with the
confirmation of upgrade requirements at the Noosa STP likely by August 2013.
2. In regard to the ownership of water supply and sewerage assets within the Body Corporate, could Unitywater
provide in principle agreement of the scenario below:
Unitywater take ownership of all water & gravity sewer infrastructure within the body
corporate area with the ownership of Low Pressure Sewer by body corporate entity (private).
In Cardno’s experience with similar developments this has been the approval structure
adopted by other service providers.
Low pressure sewers has been identified by Cardno as a resolution to the number of small local sewer pump
stations within the site, given the site’s particular constraints.
3. In regard to Item 4. Will Unitywater have capacity to undertake this review of NVL011? If so, when could this
be completed?
In addition can Unitywater confirm an assessment of the trunk sewer mains from NVL011 to NVL040 has been
undertaken? Following the meeting (16 April 2013), it was indicated Unitywater had recently commissioned Parson’s
Brinkerhoff to complete a sewer network model build for the Noosa region. Has this been completed? Would this be
available for Cardno to utilise to confirm our model?
Regards
Joshua Lake
PLANNING ENGINEER
CARDNO
Phone+61 7 3369 9822 Fax +61 7 3369 9722 Direct +61 7 3100 2267
Address Level 11 Green Square North Tower, 515 St Pauls Terrace, Fortitude Valley QLD 4006 Australia
Postal Locked Bag 4006, Fortitude Valley 4006
Email [email protected] Web www.cardno.com
Cardno is a proud winner of the 2013 BRW Client Choice Awards.
Cardno operates a quality management system that has been certified to ISO 9001.
1
Page 59
Noosa on Weyba Water Supply and Sewerage Analysis APPENDIX G MEETING MINUTES AND RECORD OF CONVERSATION WITH UNITYWATER
Page 60
MINUTES OF MEETING
Project Title Noosa on Weyba
Meeting No. Project
Date 16 April 2013 5101-19
1 No.
Recorded By Steve Korn & Joshua Lake Sheet 1 of 3
Purpose of Meeting Discussion of Council RFI
Attendance Distribution
Partha Sursala Unitywater
Michael Lukin Unitywater
Mathy Jegan Unitywater
Gary Bowtell Unitywater
Steve Korn Cardno
Joshua Lake Cardno
Victoria Haigh Cardno
Apologies
Joshua Unitywater
Mckenzie
Action Date
Item Description
By Reqd
1 Infrastrcutre Agreement
Infrastructure Agreement is required to satisfy Preliminary Approval
IA to include STP requirements, trunk infrastructure (pipework, pump
stations etc.) identification and costing, Contribution requirements,
Offsets/Refunds
Unitywater to complete templates for IA, then send to proponent for UW
acceptance
Unitywater has Standard Terms of Agreement which are the
preferred option
2 Ownership of Assets
Unitywater to investigate ownership of WS&S assets within Body
Corp – Unitywater indicated preference to be owned by Body Corp.
Proponent preference for Unitywater to maintain ownership
Noted submetering would most likely be required in accordance with
new regulations
Preferred location of infrastructure (water and sewer) is within the
road reserve
3 Water Supply
Unitywater confirmed MWH study was applicable with findings
to be adopted ffor the servicing strategy
Unitywater identified interim/early development may trigger
water quality concerns, with lower demands within the trunk
mains.
Page No. 1 of 3
(Continue on further pages as necessary)
Page 61
MINUTES OF MEETING
Action Date
Item Description
By Reqd
4 Sewerage
A business case was prepared to identify the augmentations required
to service the Noosa STP catchment. Current planning indicates the
STP will exceed capacity by 2016. UW confirmed the augmentation
would not involve additional expansion of the site. Instead it will be
focused on operational improvements to the existing plant. UW are
currently working with Degremont to identify the upgrades required.
Only development within the headworks boundary has been
considered for the current UW investigation.
Initial advice from Unitywater (A. Lorenz October 2012) is possibly
out-dated, given planning that has been carried out by Unitywater
since issue of the letter.
Capacity of the Noosa is STP is currently 12ML/d, this is the
hydraulic capacity required to accommodate all growth on the Noosa
STP catchment. While maintaining the current license. UW advised
that the spare capacity is unknown, but the full EP of the
development is unlikely to be accommodated within the 12ML/d cap.
UW advised that Cardno submit the details of the development
loading staged over its life. For UW to assess the STPs capacity.
The preferred servicing option is for the development to discharge to
the Noosa STP.
Cardno initated the potential investigation of other options for sewage
treatment and disposal such as:
On-site treatment and discharge of the treated effluent to
Unitywater network to be treated at Noosa STP.
On-site treatment and discharge of the treated effluent to
the Noosa STP (perhaps following the aeration phase) –
investigations would be required as to the exact
discharge location within the STP to ensure the
wastewater quality met the treatment achieved at the
STP.
Low pressure sewer system – not the preferred option by
Unitywater as it has higher operational and maintenance
costs.
UW are not keen for additional SPS and STPs in the
network.
On site STPs are subject to a Council decision not
Unitywater
Unitywater do not want to own asset – to be Body Corp
asset
Page No. 2 of 3
(Continue on further pages as necessary)
Page 62
MINUTES OF MEETING
Action Date
Item Description
By Reqd
Actions
Cardno send UW details of the development (staged EP) for inclusion
into an assessment of the STP’s capacity.
Cardno to send M.Lukin the WSS report for the assessment of the
5 JL 19/04
loads on the trunk sewer network in the new network model.
Unitywater to send templates for IA to Cardno for perusal of
requirements
Page No. 3 of 3
(Continue on further pages as necessary)
Page 63
Joshua Lake (Brisbane)
From: Joshua Lake (Brisbane)
Sent: Wednesday, 4 September 2013 2:23 PM
To: [email protected]; [email protected]
Subject: Noosa on Weyba
Michael/Josh,
I will be in the Unitywater Brendale office on Friday to obtain data for another project. While I am there would it be
possible to discuss the outstanding items relating to the Noosa on Weyba development?
In particular these are:
The status of the Noosa STP upgrade planning and decisions (i.e. there is capacity either now or in the
future, pending any upgrades)
Agreement in regard to the ownership of the trunk elements within the site.
The requirements regarding pump stations NVL011.
Joshua Lake
PLANNING ENGINEER
CARDNO
Phone +61 7 3369 9822 Fax +61 7 3369 9722 Direct +61 7 3100 2267
Address Level 11 Green Square North Tower, 515 St Pauls Terrace, Fortitude Valley QLD 4006 Australia
Postal Locked Bag 4006, Fortitude Valley 4006
Email [email protected] Web www.cardno.com
Cardno is a proud winner of the 2013 BRW Client Choice Awards.
Cardno operates a quality management system that has been certified to ISO 9001.
This email and its attachments may contain confidential and/or privileged information for the sole use of the intended recipient(s). All electronically supplied
data must be checked against an applicable hardcopy version which shall be the only document which Cardno warrants accuracy. If you are not the intended
recipient, any use, distribution or copying of the information contained in this email and its attachments is strictly prohibited. If you have received this email in
error, please email the sender by replying to this message and immediately delete and destroy any copies of this email and any attachments. The views or
opinions expressed are the author’s own and may not reflect the views or opinions of Cardno.
1
Used in these records
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.