Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                  Noosa on Weyba Water Network Performance Assessment




5           Conclusions
The ‘Unitywater Planning Model – Water’ water network model has been used to assess the potential
impact of the Noosa on Weyba development in the existing DMA in regard to pressure standards at
maximum hour and under fire flwo conditons. The demand from Noosa on Weyba has been applied
based on the following criteria:
                  •   Base model set to the Ultimate planning horizon
                  •   494 Residential Lots
                  •   339 Mixed Use Residential Lots
                  •   600 m2 of Retail Space
                  •   Total EP = 2416
                  •   Maximum Hour demand = 31 L/s
                  •   Fire Flow demand = 51 L/s
The assessment of the water supply network under fire flow and maximum hour demands identified the
following:
     •    Under maximum hour demand conditions Unitywater standards of service were met at the
          proposed development site and within Noosa Industrial DMA for the three supply options during
          the 2038 planning horizon. No augmentation of the existing network is required.
     •    Under fire flow demand conditions Unitywater standards of service were met at the proposed
          development site and within Noosa Industrial DMA for the three supply options during the 2038
          planning horizon. No augmentation of the existing network is required.


Storage assessment of the Tewantin Reservoir with inclusion of the Noosa on Weyba development was
undertaken. The storage assessment identified the inclusion of the Noosa on Weyba development
brings forward storage deficiency of the Tewantin Reservoir to 2016 when assessed against the DSS
contained in this report. A total storage deficiency of the Tewantin Reservoir of 1.64 ML was identified at
the 2031 plannnig horizon.




Status: Draft                                                                                           22/06/2012
Project number:                                        Page 9           Our ref: Noosa on Weyba WS Assessment.docx

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.