Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Hydraulic Modelling Fee Request                  2
UnityWater




Water Supply Demand and Sewage Flow Projections

An adopted design criteria based on the 2012 South East Queensland (SEQ) Planning Guidelines was
adopted for this development. Utilising the adopted peaking factors, detailed in Table 2, the water supply
demands were calculated for the proposed development. Table 3 details the projected water supply
demands.

Table 2 SEQ Planning Guidelines Design Criteria

                                                                                Additional Flow
                            Base Flow Unit       Peaking Factors
                                                                                 requirements
                                                                            30 L/s fire fighting at 2/3
    Water Supply            AD = 280L/EP/d           4 x PH:AD
                                                                                   peak hour
Note:
AD – Average Day
PH – Peak Hour

Table 3 Water Supply Demands for the Proposed Development

     Adopted EP                   PH (L/s)       Fire Fighting Flow (L/s)
          2415.9                    31                     51



Options

The service development, the three options have been developed.

    >     Option 1: This option involves the delivery of the full supply to the development from a connection to
          the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed 300mm
          trunk main.
    >     Option 2: This option involves splitting the site and utilising two connection locations. One
          connection delivering supply to the development would be via a connection to the existing trunk
          mains along Eenie Creek Road to the boundary of the site via a proposed 300mm trunk main. A
          second connection (200mm) to the existing mains along Lake Entrance Boulevard is also proposed
          to service the western lots. The supply sources would not be linked internally.
    >     Option 2: This option utilising two connection locations. One connection would be via a connection
          to the existing trunk mains along Eenie Creek Road to the boundary of the site via a proposed
          300mm trunk main with a 200mm connection to the existing mains along Lake Entrance Boulevard.
          The supply sources would be linked internally.


Scope Of Work

Cardno require the analysis of the Noosa water supply network to confirm the capacity of the network. As a
minimum Cardno would require the available pressures at the proposed connection locations for both a
maximum day and fire fighting scenarios for each option.




7501-19                                                                                         www.cardno.com

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.