Council archive · source document
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Head Office:
Ground Floor, 33 King Street
Caboolture QLD 4510
Mailing Address:
PO Box 953, Caboolture QLD 4510
1300 0 UNITY (1300 086 489)
www.unitywater.com
Our ref: A1130744
Your ref: 5101-19
The Manager
Cardno
Locked Bag 4006
Fortitude Valley QLD 4006
3 October 2012
Attention: Mr Joshua Lake
Capacity of Noosa Sewage Treatment Plant.
I refer to your correspondence dated 06 August 2012 in which you make enquiries about the
capacity of the Noosa Sewage Treatment Plant to serve development in the Noosa region.
Specifically you requested confirmation of the following:
1. Noosa Sewage Treatment Plant has capacity to serve existing sewer connections and new
development designated in the current Noosa planning Scheme until late 2015. This
assessment is based upon Unitywater’s assessment of the performance of the plant and
certain assumptions about; rate of growth, influent characteristics and approval of new
development not extending beyond the urban area detailed in the Noosa Planning Scheme
as at June 2012.
2. The Noosa Sewage Treatment Plant is operating beyond certain aspects of its design
capacity but is producing effluent which complies with that prescribed in the environmental
licence.
3. Unitywater is satisfied that the Noosa Sewage Treatment Plant is being operated very
efficiently.
4. Unitywater and the treatment plant operator, Degrémont, have commenced preparation of
a business case for augmentation of the Noosa Sewage Treatment Plant. Based upon the
outcomes of an options analysis Unitywater’s Board has approved, in September 2012, a
revised strategy for augmentation of the Noosa Sewage Treatment Plant which includes a
delay in the preparation of the business case until such time as Unitywater obtains a new
environmental licence. Unitywater will lodge a development application for augmentation of
the treatment plant in January 2013 and is targeting a decision notice being issued in June
2013. It is expected that the augmentation will be commissioned in December 2015.
I acknowledge that my earlier advice about timing of the augmentation was December 2014.
My advice was based upon the best available information at that time.
It is my understanding that your client is contemplating a development that is outside of the
urban area identified in the current Noosa Planning Scheme. If this is the case it would be
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.