Table F-1 Cardno’s response to Part A of the RFI
SCRC RFI Comments Cardno Response
Issue
The development requires the upgrade of the Noosa
Heads Sewage Treatment Plan.
Information Required Detailed in Section 6.4 and Appendix C and Appendix F.
61 Provide details of the nature and extent of upgrade
works required to the Noosa Heads Sewage Treatment
Plant to cater for the development.
Issue
Final alignments of proposed water and sewer mains will be
The alignment of proposed water mains and sewer located in road easements and public land to allow access.
rising mains are located within private property, Parks
and proposed open space areas. (a) The alignment of the proposed DN150 rising main
from the site will cross Noosa Civic land.
Information Required Negotiations with Noosa Civic representatives is
62 Provide additional detail on the alignment of the ongoing in regard to a permit to construct he rising
proposed water mains and sewer rising mains. The main within their car park. An alternative alignment
detail must demonstrate that the works are achievable may be considered and is presented in Figure 2.
and include: (b) All infrastructure proposed for the development will
(a) The consent of land owners that are affected by the be transferred to Unitywater in the first instance.
works. Ongoing consultation with Unitywater in regard to
the ownership of assets will result in an
(b) The delineation between private and public Infrastructure.
infrastructure.
Issue
The alignment of proposed water mains and sewer
rising mains are located within private property, Parks
and proposed open space areas.
Information Required
Refer item 61 and item 62.
63 Provided confirmation from Unitywater regarding the
agreed design of the proposed works – in particular
their acceptance or otherwise of the proposed
―Alternative
Treatment Options‖ which may have an environmental
impact.
UNITYWATER
Issue
The development located outside of the urban footprint
for the South East Queensland Regional Plan (SEQRP) Cardno has request Unitywater provide further details in
and are consequently outside of Unitywater‘s regard to an IA. As per advice in Appendix D, Unitywater are
headworks area. awaiting the outcomes of the Noosa STP planning currently
being undertaken before an IA can be formalised. Cardno
Information Required
has indicated to Unitywater that the IA may include external
94 Prior to the issue of a Development Permit, the augmentations where relevant and also the future handover
applicant is required to enter into an infrastructure of internal trunk water and sewer infrastructure.
agreement with Unitywater which provides for all the
Unitywater are to draft an IA in the first Instance as per our
necessary work and monetary contributions.
correspondence, refer Appendix F.
Accordingly, a draft infrastructure agreement can be
issued for consideration should a request to Unitywater
be made.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.