MINUTES OF MEETING
Action Date
Item Description
By Reqd
4 Sewerage
A business case was prepared to identify the augmentations required
to service the Noosa STP catchment. Current planning indicates the
STP will exceed capacity by 2016. UW confirmed the augmentation
would not involve additional expansion of the site. Instead it will be
focused on operational improvements to the existing plant. UW are
currently working with Degremont to identify the upgrades required.
Only development within the headworks boundary has been
considered for the current UW investigation.
Initial advice from Unitywater (A. Lorenz October 2012) is possibly
out-dated, given planning that has been carried out by Unitywater
since issue of the letter.
Capacity of the Noosa is STP is currently 12ML/d, this is the
hydraulic capacity required to accommodate all growth on the Noosa
STP catchment. While maintaining the current license. UW advised
that the spare capacity is unknown, but the full EP of the
development is unlikely to be accommodated within the 12ML/d cap.
UW advised that Cardno submit the details of the development
loading staged over its life. For UW to assess the STPs capacity.
The preferred servicing option is for the development to discharge to
the Noosa STP.
Cardno initated the potential investigation of other options for sewage
treatment and disposal such as:
On-site treatment and discharge of the treated effluent to
Unitywater network to be treated at Noosa STP.
On-site treatment and discharge of the treated effluent to
the Noosa STP (perhaps following the aeration phase) –
investigations would be required as to the exact
discharge location within the STP to ensure the
wastewater quality met the treatment achieved at the
STP.
Low pressure sewer system – not the preferred option by
Unitywater as it has higher operational and maintenance
costs.
UW are not keen for additional SPS and STPs in the
network.
On site STPs are subject to a Council decision not
Unitywater
Unitywater do not want to own asset – to be Body Corp
asset
Page No. 2 of 3
(Continue on further pages as necessary)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.