Eng DA RFI Response
Our Ref: S24-043
Westera Partners Pty Ltd
4 September 2024 Sunshine Coast Office
P 0437 335 403
Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: Andrew Gaffney
Council Ref: MCU24/0094
RE: RESPONSE TO COUNCIL’S REQUEST FOR INFORMATION ASSOCIATED WITH THE MATERIAL CHANGE
OF USE APPLICATION LODGED FOR THE PROPOSED RESIDENTIAL DWELLING AT 33 ROSS CRESCENT,
SUNSHINE BEACH
Requested Information:
Response
Both proposed soakage trenches are proposed more than 10m from the rear boundary. Kerb and channel
discharge is not possible as the verge falls away from the kerb and channel for the entire width of the
frontage.
SUNSHINE COAST B RIS BA NE GOLD COAST NORTHE RN NSW
Suite 2, Norval Corporate Centre Level 2, 33 Langland Street Level 3, 17 Welch Street Suite 24 Level 2
13 Norval Court Newstead QLD 4006 Southport QLD 4215 11-13 Pearl Street
Kingscliff NSW 2487
Maroochydore QLD 4558
P: 07 5391 3777 F: 07 5646 5857 P: 07 3852 4333 F : 07 5646 5857 P: 07 5571 1599 F : 07 5646 5857 P: 02 6674 8047 F: 07 5646 5857
PO Box 2016 PO Box 2016 PO Box 6138 PO Box 1131
Fortitude Valley BC, QLD 4006 Fortitude Valley BC, QLD 4006 Southport Mail Centre 9726 Kingscliff NSW 2487
E: [email protected] E: [email protected] E: [email protected] E: [email protected]
[OCR of page images]
le WESTERA
PARTNERS
Our Ref: $24-043
Westera Partners Pty Ltd
4 September 2024 Sunshine Coast Office
P 0437 335 403
Noosa Council
PO Box 141
Tewantin QLD 4565
Attention: Andrew Gaffney
Council Ref: ©MCU24/0094
RE: RESPONSE TO COUNCIL’S REQUEST FOR INFORMATION ASSOCIATED WITH THE MATERIAL CHANGE
OF USE APPLICATION LODGED FOR THE PROPOSED RESIDENTIAL DWELLING AT 33 ROSS CRESCENT,
SUNSHINE BEACH
Requested Information:
Issue — Location of Infiltration Trenches
Section 6.4 of Tectonic’s Geotechnical Investigation (24096-001-Rev0) dated 18 June 2024
recommends that roof water is discharged along Ross Crescent where physically possible
otherwise any infiltration occur at least 10m upslope of the rear boundary.
It is unclear from Westera Partners’ Stormwater Management Report if:
a. the location of the two proposed infiltration trenches complies with the above
recommendation; or
b. any roof water can be discharged into Council's existing stormwater system along
Ross Crescent.
Information Required
4. Provide confirmation by a suitably qualified representative of Westera Partners’ that:
a. The location of the proposed infiltration trenches aligns with the recommendations
contained in Tectonic’s Geotechnical Investigation (24096-001-RevO) dated 18
June 2024: and
b. A meaningful area of roof water cannot reasonably be discharged into Council’s
existing stormwater system along Ross Crescent.
Response
Both proposed soakage trenches are proposed more than 10m from the rear boundary. Kerb and channel
discharge is not possible as the verge falls away from the kerb and channel for the entire width of the
frontage.
SUNSHINE COAST BRISBANE GOLD COAST NORTHERN NSW
Suite 2, Norval Corporate Centre Level 2, 33 Langland Street Level3, 17 Welch Street Suite 24 Level 2
13 Norval Court Newstead QLD 4006 Southport QLD 4215 11-13 Pead Street
Maroochydore QLD 4558 Kingscliff NSW 2487
P: 07 5391 3777 F: 07 5646 5857 P: 07 3852 4333 F: 07 5646 5857 P: 075571 1599 F: 07 56465857 P: 0266748047 F: 0756465857
PO Box 2016 PO Box 2016 PO Box6138 PO Box 1131
Fortitude Valley BC, QLD 4006 Fortitude Valley BC, QLD 4006 Southport Mail Centre 9726 Kingsclif NSW 2487
E: [email protected] E: [email protected] E: [email protected] E: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Requested Information:
Response
A DRAINS model has been built to quickly assess the increase in peak flow off site which has indicated
3L/s for the 10% AEP event and 1L/s for the 1% AEP event and does not consider any stormwater directed
to the infiltration trench though standard losses in line with ARR Data Hub figures have been modelled.
The catchments set up are summarised below:
• Area – 3520m2 (for both)
• Fi – 0.22 for existing & 0.44 for developed
• Tc – 5 mins for impervious areas 9 minutes for pervious areas
This minor increase is considered to be a result of the larger pervious portion of the site dictating the
regime of the peak flow rate for both cases. The infiltration trenches are therefore considered adequate
to ensure no adverse impacts off site as the infiltration rate will more than offset the minor increase in
peak flow.
Any stormwater surcharging from the trenches will have adequate travel distance to the boundary to
ensure sheet flow will be achieved as both trenches are more than 10m from the rear boundary.
Requested Information:
2
[OCR of page images]
lly WESTERA
PARTNERS
Requested Information:
Issue — Increase in Fraction Impervious & Stormwater Capacity
Section 3 of Westera Partners’ Stormwater Management Report details that detention of
stormwater is not required despite the proposed increase in fraction impervious from ~16% to
~37%. \nsufficient detail has been provided to demonstrate that the proposed infiltration
trenches have sufficient capacity and the necessary infiltration rate to limit the post-
development peak flow from exceeding the pre-development peak flow during events up to
and including the DFE.
Council is concerned that the development may adversely alter the existing drainage regime
of the site and cause downstream nuisance by failing to disperse flow back to sheet flow if the
infiltration pit surcharges during events up to and including the DFE.
Information Required
5. _ Provide additional detail by a suitably qualified representative of Westera Partners’ that
demonstrates:
a. the peak post-development flow will not exceed the peak pre-development flow in
events up to and including the DFE; and
b. how stormwater surcharging from the infiltration pit will be dispersed to sheet flow.
Response
A DRAINS model has been built to quickly assess the increase in peak flow off site which has indicated
3L/s for the 10% AEP event and 1L/s for the 1% AEP event and does not consider any stormwater directed
to the infiltration trench though standard losses in line with ARR Data Hub figures have been modelled.
The catchments set up are summarised below:
e =Area—3520m2 (for both)
e Fi-—0.22 for existing & 0.44 for developed
e Tc-—5 mins for impervious areas 9 minutes for pervious areas
This minor increase is considered to be a result of the larger pervious portion of the site dictating the
regime of the peak flow rate for both cases. The infiltration trenches are therefore considered adequate
to ensure no adverse impacts off site as the infiltration rate will more than offset the minor increase in
peak flow.
Any stormwater surcharging from the trenches will have adequate travel distance to the boundary to
ensure sheet flow will be achieved as both trenches are more than 10m from the rear boundary.
Requested Information:
Issue — Ground Area Bypassing Infiltration Trenches
Westera Partners’ Preliminary Stormwater Management Plan Sheet 1 of 2 (S23-043-SW01)
details a minimum catchment area of 138m? bypassing the infiltration trenches.
It is unclear how this catchment area bypassing the infiltration trenches will match the existing
drainage regime of the site (i.e., sheet flow) and avoid causing downstream nuisance.
Information Required
6. Provide comment by a suitably qualified representative of Westera Partners’ that
demonstrates how the catchment areas bypassing the infiltration trenches will follow the
existing drainage regime of the site (i.e., sheet flow) and will not cause nuisance
downstream.
Page 3
Response
The small ground level areas modelled as bypassing the infiltration trenches are located a minimum of
28.80m from the rear boundary. Further to this these areas are largely pervious so are not considered to
represent any risk of causing nuisance off site.
In summary the proposed stormwater outcome for the site is considered to be appropriate for the scale
of development and is in accordance with that of other similar developments in the region. The proposed
infiltration trenches will adequately offset the increase in impervious area from existing to developed case
and worsening to downstream property is therefore not expected to occur.
Should there be any other queries in this regard please do not hesitate to contact myself at the Sunshine
Coast office.
Yours faithfully,
Jared Hill CPEng | RPEQ 19891
Partner | Sunshine Coast Civil Manager
Westera Partners Pty Ltd
3
[OCR of page images]
lly WESTERA
PARTNERS
Response
The small ground level areas modelled as bypassing the infiltration trenches are located a minimum of
28.80m from the rear boundary. Further to this these areas are largely pervious so are not considered to
represent any risk of causing nuisance off site.
In summary the proposed stormwater outcome for the site is considered to be appropriate for the scale
of development and is in accordance with that of other similar developments in the region. The proposed
infiltration trenches will adequately offset the increase in impervious area from existing to developed case
and worsening to downstream property is therefore not expected to occur.
Should there be any other queries in this regard please do not hesitate to contact myself at the Sunshine
Coast office.
Yours faithfully,
EE
Jared Hill cpEng | RPEQ 19891
Partner | Sunshine Coast Civil Manager
Westera Partners Pty Ltd